Septic tanks - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Septic tanks? On this page you'll find 265 study documents about Septic tanks.
Page 2 out of 265 results
Sort by
-
Engineering Graphics and Design (EGD) - Practical Assessment Task (PAT) Grade 12 IEB
- Presentation • 37 pages • 2023
-
- $28.39
- 1x sold
- + learn more
This document encompasses the comprehensive Engineering Graphics and Design (EGD) practical assessment task (PAT) for 2023, focusing on the design and creation of science classrooms. Scoring a high 98%, this task contributes to 25% of the final Grade 12 EGD mark. It outlines the complete project, starting from its initial design brief, specifications, and constraints. The report delves into various elements critical to the project, including septic tanks, grey water systems, energy-saving fixtur...
-
Questions on Septic Tanks & Drainfields Study Guide
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Questions on Septic Tanks & Drainfields 
Study Guide 
In order to determine the absorption qualities of soils for a proposed disposal field, code requires that 
the proposed site be - Answer-subjected to a percolation test 
the minimum sidewall of a seepage pit shall be at least - Answer-10 feet below the inlet 
What is the minimum gallon capacity of a septic tank - Answer-750 gallons 
The minimum liquid capacity of a septic tank serving a two bedroom , three bath residence is - 
Answer-750 gall...
-
REHS Study Guide Questions with 100% Correct Answers | Latest Version 2024 | Verified
- Exam (elaborations) • 55 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
What is the depth at which flies can emerge from a landfill? - 6 inches compacted and 5 inches 
noncompacted 
Why is the use of cooper sulfate crystals recommended for some septic tanks systems - It will destroy 
roots that the solutions comes in contact with 
What is the overall purpose of bar screens, comminutors, and grit chambers when it comes to 
wastewater treatment? - It removes larger solid 
What is the most plentiful form of available water? - Groundwater 
What are Waterborne Diseases? ...
-
Septic License Questions and Answers 2024/2025
- Exam (elaborations) • 26 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Septic tanks are required to have all seams and drain holes sealed to make water tight. 
 true 
all pretreatment units + distribution boxes are required to have KY approval numbers on them 
 true 
equal-flow type distribution boxes may be installed on tamped sand or gravel 
 true 
highest hole in hill side box does not have to be connected to inlet pipe 
 false 
all distribution boxes shall be installed level 
 true 
certified installer must lay out a septic system prior to evacua...
-
Study Guide California Designated Operator ( 16) | Questions and Correct Answers | Latest Update 2024/2025 | 100% Pass
- Exam (elaborations) • 25 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
Study Guide California 
Designated Operator ( 16) | 
Questions and Correct 
Answers | Latest Update 
2024/2025 | 100% Pass 
The following are not "underground storage tanks" - Answer -1. A farm 
Tank 
2. A heating oil tank 
3. A hydraulic lift tank 
4. A liquefied petroleum gas tank 
5. A septic tank 
6. A sump, pit, pond or lagoon 
7. A wastewater treatment tanks except if it is part of a UST system 
8. A pipeline located in a refinery except if it is connected to an 
underground storage ...
Fear of missing out? Then don’t!
-
Commercial Septic System Installer Exam Questions and Answers 2024/2025
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
All tanks must have: 
 2 compartments 
All tanks whether pre-manufactured or constructed on site shall be constructed so that the 
length is ___________ compared to the width. 
 at least one and one- half (1 1/2) times... "to the width." 
Septic Tanks may be made of: 
 Concrete, Plastic, fiberglass, or other materials as approved by the department. 
Tank compartment partitions will be located: 
 Not less than two-thirds or more than three-fourths the Length of the tank from th...
-
Oklahoma Real Estate Test Questions Solved 100% Correct
- Exam (elaborations) • 33 pages • 2024
-
- $12.49
- + learn more
Types of mortgages available, interest rates, closing dates - Answer For the individual, 
what factors would weigh heavily in determining an offer price? 
A parcel of real property may include - Answer Land and improvements. mineral rights, 
trees,houses and septic tanks. Airspace, surface, and ground beneath the surface. 
To use, sell, or lease the property. 
To enter, give away, or do nothing with the property. - Answer Which of the following 
are ownership rights as contemplated by the "bund...
-
Master Plumber Exam 1| 641 Questions | With Complete Solutions
- Exam (elaborations) • 69 pages • 2023
-
Available in package deal
-
- $15.99
- + learn more
Type of pump that discharges waste in the sump pit and transfers the waste to the house drain. (Max Fajardo) correct answer: Sewage Ejector 
 
Minimum dimension of a septic tank manhole. correct answer: 503 mm 
 
drain that discharges objectionable waste such as acids and other chemicals from industrial equipment . correct answer: Industrial drain 
 
Minimum diameter of pipe of any water closet. correct answer: 75 mm 
 
Maximum number of water closets able to discharge into a shared 75mm dia...
-
Basic Wastewater D (Questions and 100% Accurate Answers.)
- Exam (elaborations) • 36 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
1. Water resources in Texas include lakes, rivers, bays, estuaries, wetlands, groundwater, and stormwater runoff. 
 
a. true 
 
b. false correct answers b 
 
2. Water pollutants include organic and inorganic material, heat, and radiation. 
 
a. true 
 
b. false correct answers a 
 
3. In Texas, clean water is needed to provide for human consumption and recreation, maintain aquatic habitats for wildlife, supply bays with fresh water, recharge groundwater, and provide for industry. 
 
a. true...
-
LARE Test 4 exam 2024 with 100% correct answers
- Exam (elaborations) • 58 pages • 2024
-
Available in package deal
-
- $13.49
- + learn more
1. What demolition activities do you address when converting an abandoned rail line into a walking trail for pedestrians? - correct answer Select all that apply (a,b,c,) 
a. Soil remediation 
b. Removing creosote railroad ties 
c. Fly ash and other dust related issues 
d. Protecting existing vegetation 
e. Grading old railroad bed to trail standards 
 
2. The party responsible for determining the order of demolition operations is: - correct answer (c) 
a. The general contractor 
b. The demol...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia