Running rigging - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Running rigging? On this page you'll find 194 study documents about Running rigging.
Page 2 out of 194 results
Sort by
-
ASA Basic Keelboat Sailing 101 Questions And Answers With Verified Solutions
- Exam (elaborations) • 7 pages • 2024
-
- $7.99
- + learn more
Starboard Tack - ️️When the wind hits the right side of the boat and the boom is on 
the left, often has right of way 
Apparent Wind - ️️The combination of true wind and boat speed wind 
Boom - ️️The spar at the bottom of the mainsail 
Hull - ️️The body of the boat 
Keel - ️️The weighted fin at the bottom of the boat 
Bow - ️️The front of the boat 
Stern - ️️The back of the boat 
Cockpit - ️️The space where the helmsman sits 
Rudder - ️️The fin used for steeri...
-
ASA 101, Basic Keelboat Sailing Questions And Answers With Verified Solutions
- Exam (elaborations) • 7 pages • 2024
-
- $7.99
- + learn more
Standing Rigging - ️️Lines, wires, or rods which are more or less fixed in position 
while the boat is under sail, in contrast to running rigging, which move and change fairly 
often 
Keel - ️️Heavy, fixed appendage on the bottom of the hull that not only provides the 
sideways resistance, but also the vertical stability needed to counter the force of the 
wind on the sails that would otherwise push the boat sideways 
Hull - ️️Watertight floating body of the boat that gives it form a...
-
US Sailing Learn Sailing Right! Beginning Sailing Exam Questions & Answers 100% Correct!!
- Exam (elaborations) • 11 pages • 2024
-
- $15.49
- + learn more
Abeam - ANSWERThe location of anything beyond either side of the boat at right angles to the centerline. 
 
Accidental Jibe - ANSWERAn unexpected jibe when sailing downwind and the wind catches the back side of the mainsasil, possible causing the helmsman to lose control of the boat. 
 
Aft - ANSWERThe direction toward the stern 
 
Ahead - ANSWERThe location of anything forward of the bow. 
 
Astern - ANSWERThe location of anything aft of the stern 
 
Battens - ANSWERStiffening pieces placed hor...
-
ASA BASIC KEELBOAT SAILING 101 QUESTIONS AND ANSWERS 2024/202
- Exam (elaborations) • 15 pages • 2024
-
- $11.49
- + learn more
Hull 
→ The body of the boat 
Keel 
→ The weighted fin at the bottom of the boat 
Bow 
→ The front of the boat 
Stern 
→ The back of the boat 
Cockpit 
→ The space where the helmsman sits 
Rudder 
→ The fin used for steering 
Tiller 
→ The lever used to steer a small boad 
Cabin 
2 0 2 4 /2025 | © copyright | This work may not be copied for profit gain Excel! 
1 | P a g e | G r a d e A + | 2 0 24 / 2 0 2 5 
→ The enclosed space bellow deck 
Stanchions 
→ Amidships support for ...
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSWER Person responsible for lift 
Where should climbing instructions be kept - ANSWER ON Site 
All climbing operations shall be performed under the supervision of - ANSWER Qualified 
person 
When cranes are erected, load limiting devices shall be tested for proper setting and 
operation - ANSWER Before crane is placed in service 
Hooks shall be equipped with lat...
Get paid weekly? You can!
-
Mobile Crane NCCER Study Guide | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
When determining the "gross load" the best method is: - Get an accurate load weight and add the 
rigging 
By order of strength which is correct - Basket, Vertical, Choker 
Primary purpose for a roster sheave or auxiliary boom point sheave is to: - Separate the hoist line 
When the number of layers of rope on a drum increase the : - Allowable line pull decreases 
What is the minimum allowable distance from the crane and power lines under 50kV? - 10' 
Eccentric main boom tip reeving casues - tw...
-
OECP/NCCO Questions & 100% Correct Answers
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Which of the following OSHA regulations, governing suspended personnel 
platforms? 
 ~~> OSHA 1926.1431 
According to ASME B30.3, the prohibited zone for power lines that are 60 kV 
is. 
 ~~> 15 ft 
The OSHA construction standards for rigging equipment is? 
 ~~> 1926.251 
According to ASME B30.3 what is the minimum pitch diameter for a load 
block sheaves? 
 ~~> Not less than 15 times rope diameter 
According to OSHA, a periodic inspection is? 
 ~~> Monthly to annually 
Pe...
-
OECP/NCCO EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 5 pages • 2024
-
- $10.99
- + learn more
Which of the following OSHA regulations, governing suspended personnel platforms? - Answer-OSHA 1926.1431 
 
According to ASME B30.3, the prohibited zone for power lines that are 60 kV is. - Answer-15 ft 
 
The OSHA construction standards for rigging equipment is? - Answer-1926.251 
 
According to ASME B30.3 what is the minimum pitch diameter for a load block sheaves? - Answer-Not less than 15 times rope diameter 
 
According to OSHA, a periodic inspection is? - Answer-Monthly to annually 
 
Per...
-
OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED)
- Exam (elaborations) • 23 pages • 2024
-
- $15.99
- + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED) The shaded area on a load chart 
indicates _______? 
A structural chart 
3. The minimum distance to a power 
line of unknown voltage is ? 
50' 
4. When hoisting personnel and have 
known voltage, can you use Table A 
and get closer than 20'? 
Never! 
5. What is the minimum tale swing 
clearance requirement 
2' 
6. What kind of rigger is required for 
A/D? 
Qualified Rigger 
7. Signal training is now required in 
the construction...
-
NCCCO Mobile Crane Core Study guide to help prepare you for the mobile crane core written exam
- Exam (elaborations) • 33 pages • 2024
-
Available in package deal
-
- $10.00
- + learn more
Signal Person Qualifications (OSHA) 
1926.1428 
Hoisting Personnel (OSHA) 
1926.1431 
Authority to Stop (OSHA) 
1926.1418 
Powerline Safety (OSHA) 
1926.1407 thru 1926.1411 
Scope (OSHA) 
1926.1400 
Inspections (OSHA) 
1926.1412 
Tower Cranes (OSHA) 
1926.1435 
Wire Rope Inspections (OSHA) 
1926.1413 
Mobile Cranes (ASME) 
B30.5 
Slings (ASME) 
B30.9 
Hooks (ASME) 
B30.10 
Jack's (ASME) 
B30.1 
Personnel lifting systems (ASME) 
B30.23 
Tower Cranes (ASME) 
B30.3 
Rigging Hardware (ASME) 
B30.26...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia