Osha 30 crane safety exam - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Osha 30 crane safety exam? On this page you'll find 89 study documents about Osha 30 crane safety exam.

Page 2 out of 89 results

Sort by

OSHA 30 EXAM QUESTIONS AND ANSWERS 2024
  • OSHA 30 EXAM QUESTIONS AND ANSWERS 2024

  • Exam (elaborations) • 16 pages • 2024
  • OSHA 30 EXAM QUESTIONS AND ANSWERS 2024 Those who work on a crane or near crane operations must be trained. Which of the following is true for this training? - answer-D. All of the above Certain inspections of crane equipment may be made by a(n) ___________ person; however, crane inspections are typically required to be made by a(n) __________ person. - answer-Competent, qualified After safety-related modifications have been made to crane equipment, the equipment must be inspected by __...
    (0)
  • $7.99
  • + learn more
OSHA 30 Exam Questions And Answers (Verified And Updated)
  • OSHA 30 Exam Questions And Answers (Verified And Updated)

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • OSHA 30 Exam Questions And Answers (Verified And Updated) Those who work on a crane or near crane operations must be trained. Which of the following is true for this training? - answerD. All of the above Certain inspections of crane equipment may be made by a(n) ___________ person; however, crane inspections are typically required to be made by a(n) __________ person. - answerCompetent, qualified After safety-related modifications have been made to crane equipment, the equipment must be ...
    (0)
  • $12.49
  • + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025
  • OECP Exam Questions With 100% Correct Answers 2024/2025

  • Exam (elaborations) • 23 pages • 2024
  • OECP Exam Questions With 100% Correct Answers 2024/2025. What are the four different types of crane signals? Hand Voice Audible New 2. The shaded area on a load chart indicates _______? A structural chart 3. The minimum distance to a power line of unknown voltage is ? 50' 4. When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? Never! 5. What is the minimum tale swing clearance requirement 2' 6. What kind of rigger is required for A/D...
    (0)
  • $15.49
  • + learn more
OSHA 30 Exam Questions And Answers (Verified And Updated)
  • OSHA 30 Exam Questions And Answers (Verified And Updated)

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • OSHA 30 Exam Questions And Answers (Verified And Updated) Those who work on a crane or near crane operations must be trained. Which of the following is true for this training? - answerD. All of the above Certain inspections of crane equipment may be made by a(n) ___________ person; however, crane inspections are typically required to be made by a(n) __________ person. - answerCompetent, qualified After safety-related modifications have been made to crane equipment, the equipment must be ...
    (0)
  • $12.49
  • + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED)
  • OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED)

  • Exam (elaborations) • 23 pages • 2024
  • OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED) The shaded area on a load chart indicates _______? A structural chart 3. The minimum distance to a power line of unknown voltage is ? 50' 4. When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? Never! 5. What is the minimum tale swing clearance requirement 2' 6. What kind of rigger is required for A/D? Qualified Rigger 7. Signal training is now required in the construction...
    (0)
  • $15.99
  • + learn more
Nccco Core Exam Questions With All Answers
  • Nccco Core Exam Questions With All Answers

  • Exam (elaborations) • 21 pages • 2024
  • Nccco Core Exam Questions With All Answers If taking sides strain on a boom what concerns the operator the most - ANSWER- Boom damage If a crane load chart has capacities listed in the shaded area this means that - ANSWER- If overloaded structural confidence will be compromised As the layers of rope on a drum increase the allowable line Pull wil - ANSWER- Decrease Of the following actions which one will most likely cause a side load condition - ANSWER- Abruptly starting or stopping t...
    (0)
  • $13.99
  • + learn more
OSHA 30 CONSTRUCTION FINAL EXAM
  • OSHA 30 CONSTRUCTION FINAL EXAM

  • Exam (elaborations) • 75 pages • 2024
  • OSHA 30 CONSTRUCTION FINAL EXAM 1. OSHA requires training to be provided within one year of when a safety and health program is first established A. True B. False (correct answer) The minimum safe distance for equipment operating in proximity to energized power lines that contain up to 50,000 volts is A. 25 feet B. 5 feet C. 10 feet (correct answer) D. 50 feet The GFCI fits into the standard electrical outlet box to protect ground faults. A. Disposable B. Receptacle (...
    (0)
  • $14.49
  • + learn more
OECP Exam Questions With 100% Correct Answers Latest Update 2024/2025 (VERIFIED)
  • OECP Exam Questions With 100% Correct Answers Latest Update 2024/2025 (VERIFIED)

  • Exam (elaborations) • 23 pages • 2024
  • OECP Exam Questions With 100% Correct Answers 2024/2025 (VERIFIED) The shaded area on a load chart indicates _______? A structural chart 3. The minimum distance to a power line of unknown voltage is ? 50' 4. When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? Never! 5. What is the minimum tale swing clearance requirement 2' 6. What kind of rigger is required for A/D? Qualified Rigger 7. Signal training is now required in the constructi...
    (0)
  • $14.99
  • + learn more