Nicet exam - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nicet exam? On this page you'll find 582 study documents about Nicet exam.

Page 2 out of 582 results

Sort by

NICET Level 1 exam 60 Questions and answers (Practice Electrical Power Testing)
  • NICET Level 1 exam 60 Questions and answers (Practice Electrical Power Testing)

  • Exam (elaborations) • 7 pages • 2024
  • NICET Level 1 exam 60 Questions and answers (Practice Electrical Power Testing) The operable part of a manually actuated alarm initiating device shall be not less than inches AFF? - ANS 42
    (0)
  • $7.99
  • 1x sold
  • + learn more
NICET Highway Construction Inspector Level III Practice Exam 1 questions and answers 2024
  • NICET Highway Construction Inspector Level III Practice Exam 1 questions and answers 2024

  • Exam (elaborations) • 15 pages • 2024
  • NICET Highway Construction Inspector Level III Practice Exam 1 questions and answers 2024
    (0)
  • $11.99
  • 1x sold
  • + learn more
NICET Practice Fire Alarm Systems Level III practice exam with complete questions and answers.
  • NICET Practice Fire Alarm Systems Level III practice exam with complete questions and answers.

  • Exam (elaborations) • 30 pages • 2024
  • NICET Practice Fire Alarm Systems Level III practice exam with complete questions and answers.
    (0)
  • $12.49
  • 1x sold
  • + learn more
NICET Highway Construction Inspector Level III Practice Exam 1 (56 passed new update questions and answers)
  • NICET Highway Construction Inspector Level III Practice Exam 1 (56 passed new update questions and answers)

  • Exam (elaborations) • 16 pages • 2024
  • NICET Highway Construction Inspector Level III Practice Exam 1 (56 passed new update questions and answers) During installation of traffic loops in the pavement, which three statements apply prior to and during the installation of loop wire? (Choose 3). a) Do not allow vehicular traffic over an open saw cut. b) Do not overlap saw cuts at the corner. c) Thoroughly clean the saw cut of foreign material. d) Use a plastic sleeve where loop wire crosses a joint.
    (0)
  • $8.99
  • 1x sold
  • + learn more
NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS Acceptance - Answer-The written acceptance by the Department of the Work. acceptance testing - Answer-Testing conducted by the Department to measure the degree of compliance to the Contract actual cost - Answer-The computed cost using calculations provided addendum - Answer-A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity - Answer-The quantity ...
    (0)
  • $12.49
  • 1x sold
  • + learn more
NICET Level 2 Full Exam Questions and Answers
  • NICET Level 2 Full Exam Questions and Answers

  • Exam (elaborations) • 64 pages • 2024
  • Available in package deal
  • NICET Level 2 Full Exam Questions and Answers You are inspecting a construction site and notice that the soil appears to be a fine- grained, cohesive material with good bearing capacity. What type of soil is this likely to be? a. Clay b. Sand c. Gravel d. Loam - Answer-a. Clay You are inspecting the clearing and grubbing of a construction site and notice that a large tree has been removed within the limits of disturbance. What should you do? a. Notify the project manager and request th...
    (0)
  • $14.49
  • 1x sold
  • + learn more
NICET Inspect & Test LVL 2 Exam Questions and Answers
  • NICET Inspect & Test LVL 2 Exam Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • NICET Inspect & Test LVL 2 Exam Questions and Answers While testing a fire alarm system at a correctional facility, it is determined that the general fire alarm signal requires human intervention to be initiated. This is permitted using a _____ feature? A. Pre signal B. Positive alarm sequence C. Manual initiation D. Alarm verification - Answer-A. Pre Signal NFPA 72 23.8.1.1.2(3)(a) Consider a 50′ x 50′ room with a 12′ ceiling. What is the minimum intensity required for a ceilin...
    (0)
  • $11.49
  • 1x sold
  • + learn more
NICET LEVEL 2 FULL LATEST EXAM 2024 QUESTIONS AND CORRECT DETAILED ANSWERS|GRADED A+
  • NICET LEVEL 2 FULL LATEST EXAM 2024 QUESTIONS AND CORRECT DETAILED ANSWERS|GRADED A+

  • Exam (elaborations) • 75 pages • 2024
  • NICET LEVEL 2 FULL LATEST EXAM 2024 QUESTIONS AND CORRECT DETAILED ANSWERS|GRADED A+
    (2)
  • $17.99
  • + learn more
NICET Fire Alarm Level 1 Exam Questions and Answers (Latest Update 2023)
  • NICET Fire Alarm Level 1 Exam Questions and Answers (Latest Update 2023)

  • Exam (elaborations) • 19 pages • 2023
  • NICET Fire Alarm Level 1 Exam Questions and Answers (Latest Update 2023)
    (0)
  • $13.49
  • 1x sold
  • + learn more