Nerc prep test 2 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc prep test 2? On this page you'll find 43 study documents about Nerc prep test 2.

Page 2 out of 43 results

Sort by

NERC Prep - Bal, Int, & Trans Test Questions & Answers
  • NERC Prep - Bal, Int, & Trans Test Questions & Answers

  • Exam (elaborations) • 21 pages • 2024
  • NERC Prep - Bal, Int, & Trans Test Questions & Answers 1 / 21 1. What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group 2. What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equipment d. ...
    (0)
  • $13.49
  • + learn more
NERC Certification TEST 200 Exam Questions and Answers Latest 2024/2025 | 100% Correct
  • NERC Certification TEST 200 Exam Questions and Answers Latest 2024/2025 | 100% Correct

  • Exam (elaborations) • 54 pages • 2024
  • NERC Certification TEST 200 Exam Questions and Answers Latest 2024/2025 | 100% Correct. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - a. Generator MVAR output would increase 2. When system conditions...
    (0)
  • $18.49
  • + learn more
NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)
  • NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)

  • Exam (elaborations) • 54 pages • 2024
  • NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified) When system conditions are such that emergency procedures are expected to be implemented, which of the following actions should be considered first? a. Shed firm load b. Implement Active Load Management c. Return outaged equipment to service d. Request a voltage reduction - c. Return outaged equipment to service 3. If your transmission path is rated for 1200 MW and 1000 MW are scheduled on it, but due to parallel fl...
    (0)
  • $17.99
  • + learn more
NERC PREP TEST 101| 200 Questions| accurate Answers| Latest Update
  • NERC PREP TEST 101| 200 Questions| accurate Answers| Latest Update

  • Exam (elaborations) • 38 pages • 2024
  • NERC PREP TEST 101| 200 Questions| accurate Answers| Latest Update 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - ANSWER a. Generator MVAR output would increase 2. When system conditions are s...
    (0)
  • $13.99
  • + learn more
NERC PREP TEST 101 Questions With 100% Verified Answers
  • NERC PREP TEST 101 Questions With 100% Verified Answers

  • Exam (elaborations) • 61 pages • 2024
  • Available in package deal
  • NERC PREP TEST 101 Questions With 100% Verified Answers 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - ANS-a. Generator MVAR output would increase 2. When system conditions are such that emergency ...
    (0)
  • $20.49
  • + learn more
NERC PREP TEST 101 With Verified Solution (200 Quiz)
  • NERC PREP TEST 101 With Verified Solution (200 Quiz)

  • Exam (elaborations) • 38 pages • 2023
  • NERC PREP TEST 101 With Verified Solution (200 Quiz) 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system a. Generator MVAR output would increase 2. When system conditions are such that emergency procedu...
    (0)
  • $14.99
  • + learn more
NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct
  • NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct

  • Exam (elaborations) • 54 pages • 2024
  • If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of the follow...
    (0)
  • $16.49
  • + learn more
NERC PREP TEST 101| 200 QUESTIONS| WITH COMPLETE SOLUTIONS
  • NERC PREP TEST 101| 200 QUESTIONS| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 55 pages • 2024
  • Available in package deal
  • NERC PREP TEST 101| 200 QUESTIONS| WITH COMPLETE SOLUTIONS 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system Answer-a. Generator MVAR output would increase 2. When system conditions are such that emer...
    (0)
  • $12.49
  • + learn more
NERC PREP TEST 101 Questions with complete solution 2023
  • NERC PREP TEST 101 Questions with complete solution 2023

  • Exam (elaborations) • 38 pages • 2023
  • NERC PREP TEST 101 Questions with complete solution 20231. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - correct answer a. Generator MVAR output would increase 2. When system conditions are such ...
    (0)
  • $13.49
  • + learn more