Nccco tower cranes exam - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco tower cranes exam? On this page you'll find 42 study documents about Nccco tower cranes exam.

Page 2 out of 42 results

Sort by

NCCCO TOWER CRANE EXAM 2024-2025  NEWEST ACTUAL EXAM 155 QUESTIONS AND  GUARANTEED ANSWERS HIGHLY  RECOMMENDED BY EXPERTS ALREADY  GRADED A+.NEW
  • NCCCO TOWER CRANE EXAM 2024-2025 NEWEST ACTUAL EXAM 155 QUESTIONS AND GUARANTEED ANSWERS HIGHLY RECOMMENDED BY EXPERTS ALREADY GRADED A+.NEW

  • Exam (elaborations) • 21 pages • 2024
  • NCCCO TOWER CRANE EXAM NEWEST ACTUAL EXAM 155 QUESTIONS AND GUARANTEED ANSWERS HIGHLY RECOMMENDED BY EXPERTS ALREADY GRADED A+.NEW Cranes lifting personnel platform must have the platform and rigging inspected: - ANSWER- Prior to each shift ASME 3-3.2.2(c)(1) Crane hooks must not be twisted in excess of: - ANSWER- 10 degrees OSHA 1910.180(d)(3)(v) A Crane hooks throat open must not exceed - ANSWER- 15% of its original size OSHA 1910.180(d)(3)(v) By order of hitch strength which...
    (0)
  • $23.99
  • + learn more
NCCCO tower crane Exam Complete  Questions and Answers 100% Passed!
  • NCCCO tower crane Exam Complete Questions and Answers 100% Passed!

  • Exam (elaborations) • 11 pages • 2024
  • NCCCO tower crane Exam Complete Questions and Answers 100% Passed! Splices in rall tracks shall have - CORRECT ANSWER-Smooth Joints Hydraulic systems should have their proper fluid level checked - CORRECT ANSWERDaily If power fails during operations, the following shouldn't apply - CORRECT ANSWER-Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be l...
    (0)
  • $12.99
  • + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)
  • NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)

  • Exam (elaborations) • 16 pages • 2024
  • Splices in rall tracks shall have - ANSWER Smooth Joints Hydraulic systems should have their proper fluid level checked - ANSWER Daily If power fails during operations, the following shouldn't apply - ANSWER Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER Person responsible for lift Where should climbing instructions be kept - ANSWER ...
    (0)
  • $14.49
  • + learn more
NCCCO Tower Crane EXAM  2023-2024 ACTUAL EXAM 100  QUESTIONS AND CORRECT  DETAILED ANSWERS  ANSWERS ALREADY GRADED  A FINAL UPDATE PASS A
  • NCCCO Tower Crane EXAM 2023-2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS ANSWERS ALREADY GRADED A FINAL UPDATE PASS A

  • Exam (elaborations) • 28 pages • 2024
  • NCCCO Tower Crane EXAM ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS ANSWERS ALREADY GRADED A FINAL UPDATE PASS A+ Splices in rall tracks shall have - ANSWER-Smooth Joints Hydraulic systems should have their proper fluid level checked - ANSWER-Daily If power fails during operations, the following shouldn't apply - ANSWER-Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed cra...
    (0)
  • $20.49
  • + learn more
NCCCO tower crane exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
  • NCCCO tower crane exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • NCCCO tower crane exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ Splices in rall tracks shall have - Answer -Smooth Joints Hydraulic systems should have their proper fluid level checked - Answer -Daily If power fails during operations, the following shouldn't apply - Answer - Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is...
    (0)
  • $12.49
  • + learn more
Tower Crane Questions and Answers  NCCCO Practice Exam Latest
  • Tower Crane Questions and Answers NCCCO Practice Exam Latest

  • Exam (elaborations) • 9 pages • 2024
  • Tower Crane Questions and Answers NCCCO Practice Exam Latest Which of the following OSHA regulations govern suspended personnel platforms? - CORRECT ANSWER-OSHA 1926.1431 According to ASME B30.3 The prohibited zone for power lines that are 60 kV is - CORRECT ANSWER-15 ft According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of - CORRECT ANSWER-5 to 1 According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardwar...
    (0)
  • $12.99
  • + learn more
NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A
  • NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A

  • Exam (elaborations) • 4 pages • 2024
  • NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A OSHA 1910 - CORRECT ANSWER-General Industry Standards OSHA 1926 - CORRECT ANSWER-Construction Industry Standards OSHA 1910.180 - CORRECT ANSWER-Crawler, Locomotive and Truck Cranes OSHA 1910.184 - CORRECT ANSWER-Slings OSHA 1926.251 - CORRECT ANSWER-Rigging Equipment used for material handling OSHA 1926.1400 - CORRECT ANSWER-Cranes and Derricks used in construction ASME B30.3 - CORRECT ANSWER-Tower Cranes ASME B30.5 - CORRECT ANSWER-Mobi...
    (0)
  • $11.99
  • + learn more
NCCCO tower crane Exam Complete  Questions and Answers 100% Passed!
  • NCCCO tower crane Exam Complete Questions and Answers 100% Passed!

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • NCCCO tower crane Exam Complete Questions and Answers 100% Passed! Splices in rall tracks shall have - CORRECT ANSWER-Smooth Joints Hydraulic systems should have their proper fluid level checked - CORRECT ANSWERDaily If power fails during operations, the following shouldn't apply - CORRECT ANSWER-Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be l...
    (0)
  • $13.49
  • + learn more
Tower Cranes NCCCO Study Guide Final  Exam with Verified Solutions
  • Tower Cranes NCCCO Study Guide Final Exam with Verified Solutions

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • Tower Cranes NCCCO Study Guide Final Exam with Verified Solutions T or F Very few areas in either the US or Canada require certification to operate a tower crane - CORRECT ANSWER-false T or F Self erecting tower cranes are easier to erect than a conventional tower crane, but erection time takes longer - CORRECT ANSWER-false How does the crane rotate with a fixed tower base? - CORRECT ANSWER-slewing ring beneath the jib T or F A mono type of tower can be either fixed or slewing - ...
    (0)
  • $10.49
  • + learn more
NCCCO Tower Crane EXAM  2023-2024 ACTUAL EXAM 100  QUESTIONS AND CORRECT  DETAILED ANSWERS  ANSWERS ALREADY GRADED  A FINAL UPDATE PASS A+
  • NCCCO Tower Crane EXAM 2023-2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS ANSWERS ALREADY GRADED A FINAL UPDATE PASS A+

  • Exam (elaborations) • 13 pages • 2024
  • NCCCO Tower Crane EXAM ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS ANSWERS ALREADY GRADED A FINAL UPDATE PASS A+ Splices in rall tracks shall have - ANSWER-Smooth Joints Hydraulic systems should have their proper fluid level checked - ANSWER-Daily If power fails during operations, the following shouldn't apply - ANSWER-Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed cra...
    (0)
  • $21.49
  • + learn more