Leed bdc exam - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Leed bdc exam? On this page you'll find 46 study documents about Leed bdc exam.

Page 2 out of 46 results

Sort by

LEED AP BD+C Exam 3 |Questions and 100% Correct Verified Answers| Latest Update
  • LEED AP BD+C Exam 3 |Questions and 100% Correct Verified Answers| Latest Update

  • Exam (elaborations) • 29 pages • 2024
  • List the eight LEED BD+C adaptations an exam candidate must know - ANSWER New construction and major renovations, core and shell development schools retail data centers warehouses and distribution centers hospitality healthcare LEED Rating System - ANSWER Building Design and Construction Interior Design and Construction Building O&M Neighborhood Development Home
    (0)
  • $13.49
  • + learn more
LEED BD+C Actual Exam |Questions and 100% Correct Answers| Latest Update
  • LEED BD+C Actual Exam |Questions and 100% Correct Answers| Latest Update

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • When calculating occupied areas in an area of a building, what spaces must be excluded? - ANSWER Underground or structured parking Mechanical spaces are included How do you calculate default occupancy counts for Core and Shell projects? - ANSWER Using gross floor area, not net or leasable floor area Are hotel guests visitors or regular occupants of the building? - ANSWER Regular occupants Can boats and mobile homes be certified under LEED? - ANSWER No. Pre-fab or modular structures may be...
    (0)
  • $12.99
  • + learn more
LEED AP BD+C Practice Exam Pool E  2024 Questions and Answers 100% Verified
  • LEED AP BD+C Practice Exam Pool E 2024 Questions and Answers 100% Verified

  • Exam (elaborations) • 23 pages • 2024
  • LEED AP BD+C Practice Exam Pool E 2024 Questions and Answers 100% Verified
    (0)
  • $7.99
  • + learn more
LEED AP BD+C Exam 2024| Questions and 100% Correct Verified Answers| Latest Update
  • LEED AP BD+C Exam 2024| Questions and 100% Correct Verified Answers| Latest Update

  • Exam (elaborations) • 23 pages • 2024
  • What must your erosion control plan adhere to? - ANSWER 2003 EPA Construction General Permit (or local standards, whichever is more stringent) What is a Phase I Environmental Site Assessment? - ANSWER A report prepared for a real estate holding that identifies potential or existing environmental contamination liabilities How is a Phase II Environmental Site Assessment more in depth? - ANSWER A further investigation that collects original samples of soil, groundwater, or building materials t...
    (0)
  • $13.19
  • + learn more
LEED BD+C Exam  2024 Questions and Answers 100% Verified
  • LEED BD+C Exam 2024 Questions and Answers 100% Verified

  • Exam (elaborations) • 32 pages • 2024
  • LEED BD+C Exam 2024 Questions and Answers 100% Verified
    (0)
  • $7.99
  • + learn more
LEED AP BD+C Exam 2024 |Questions and 100% Correct Verified Answers| Latest Update
  • LEED AP BD+C Exam 2024 |Questions and 100% Correct Verified Answers| Latest Update

  • Exam (elaborations) • 29 pages • 2024
  • The project ________ process is designed to allow project teams to obtain technical guidance on how LEED requirements, including MPRs, prererqs and credits pertain to their projects. - ANSWER credit interpretation ruling process 3.15 ________ are precedent setting official answers to formal technical inquiries about implementing LEED on a project. - ANSWER LEED interpretations - are published to USGBC 3.16 ___________ incorporate changes and improvements to LEED rating systems and referen...
    (0)
  • $13.49
  • + learn more
LEED BD+C Exam 2024 |Questions and 100% Correct Verified Answers| Latest Update
  • LEED BD+C Exam 2024 |Questions and 100% Correct Verified Answers| Latest Update

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • When calculating occupied areas in an area of a building, what spaces must be excluded? - ANSWER Underground or structured parking Mechanical spaces are included How do you calculate default occupancy counts for Core and Shell projects? - ANSWER Using gross floor area, not net or leasable floor area Are hotel guests visitors or regular occupants of the building? - ANSWER Regular occupants Can boats and mobile homes be certified under LEED? - ANSWER No. Pre-fab or modular structures may be...
    (0)
  • $13.19
  • + learn more
LEED AP BD+C STUDY EXAM 1 2024 WITH 100% CORRECT ANSWERS
  • LEED AP BD+C STUDY EXAM 1 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 13 pages • 2024
  • Which of the following factors influence the recycling efforts within buildings? A) Lack of education B) Non-availability of recycling programs in town C) ignorance about recycling D) lack of convenient, physical spaces for recycling - correct answer D) lack of convenient, physical spaces for recycling A project team for a school project will reuse the shell of an existing building and recycle the rest of the construction and demolition debris. Which of the following MR credits will thi...
    (0)
  • $15.49
  • + learn more
LEED BD+C AP Exam 2024 Updated Questions And Advanced Correct Answers.
  • LEED BD+C AP Exam 2024 Updated Questions And Advanced Correct Answers.

  • Exam (elaborations) • 36 pages • 2024
  • (MR Credit) Building Product Disclosure and Optimization- Environmental Product Declarations - Opt. 2 Multi-Attribute Optimization. Exemplary Performance requirements? - correct answer Option 1. Source at least 40 qualifying products from five manufacturers. Option 2. Purchase 75%, by cost, of permanently installed building products that meet the required attributes What must be true of EPDs to qualify for MR Credit Building Product Disclosure and Optimization EPD? - correct...
    (0)
  • $13.99
  • + learn more
LEED BD+C Exam 2024| Questions and 100% Correct Verified Answers| Latest Update
  • LEED BD+C Exam 2024| Questions and 100% Correct Verified Answers| Latest Update

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • A LEED AP is tasked with registering a 6-story, C&S office building with a retail store located on the first two floors. How should the LEED AP proceed with registering the project since there are two applicable rating system adaptations? - ANSWER The LEED AP should use the 40/60 rule to choose the rating system that is appropriate for 60% or more of the LEED Project Which one of the following projects meets the MPRs and can pursue LEED certification? A. A temporary construction trailer B....
    (0)
  • $12.99
  • + learn more