Leed ap bdc exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Leed ap bdc exam? On this page you'll find 28 study documents about Leed ap bdc exam.
Page 2 out of 28 results
Sort by
-
LEED AP BD+C Practice Exam Pool E 2024 Questions and Answers 100% Verified
- Exam (elaborations) • 23 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
LEED AP BD+C Practice Exam Pool E 2024 Questions and Answers 100% Verified
-
LEED AP BD+C Exam 2024| Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 23 pages • 2024
-
- $13.19
- + learn more
What must your erosion control plan adhere to? - ANSWER 2003 EPA Construction General 
Permit (or local standards, whichever is more stringent) 
What is a Phase I Environmental Site Assessment? - ANSWER A report prepared for a real estate 
holding that identifies potential or existing environmental contamination liabilities 
How is a Phase II Environmental Site Assessment more in depth? - ANSWER A further 
investigation that collects original samples of soil, groundwater, or building materials t...
-
LEED AP BD+C Exam 2024 |Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 29 pages • 2024
-
- $13.49
- + learn more
The project ________ process is designed to allow project teams to obtain technical guidance 
on how LEED requirements, including MPRs, prererqs and credits pertain to their projects. - 
ANSWER credit interpretation ruling process 
3.15 
________ are precedent setting official answers to formal technical inquiries about 
implementing LEED on a project. - ANSWER LEED interpretations - are published to USGBC 
3.16 
___________ incorporate changes and improvements to LEED rating systems and referen...
-
LEED AP BD+C STUDY EXAM 1 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 13 pages • 2024
-
- $15.49
- + learn more
Which of the following factors influence the recycling efforts within buildings? 
 
A) Lack of education 
B) Non-availability of recycling programs in town 
C) ignorance about recycling 
D) lack of convenient, physical spaces for recycling - correct answer D) lack of convenient, physical spaces for recycling 
 
A project team for a school project will reuse the shell of an existing building and recycle the rest of the construction and demolition debris. Which of the following MR credits will thi...
-
LEED BD+C AP Exam 2024 Updated Questions And Advanced Correct Answers.
- Exam (elaborations) • 36 pages • 2024
-
- $13.99
- + learn more
(MR Credit) Building Product Disclosure and Optimization- Environmental Product Declarations - Opt. 2 Multi-Attribute Optimization. Exemplary Performance requirements? - correct answer Option 1. Source at least 40 qualifying products from five manufacturers. 
Option 2. Purchase 75%, by cost, of permanently installed building products that meet the required attributes 
 
What must be true of EPDs to qualify for MR Credit Building Product Disclosure and Optimization EPD? - correct...
Too much month left at the end of the money?
-
LEED AP BD+C v4 Exam Study Guide with complete solution
- Exam (elaborations) • 9 pages • 2024
-
- $10.49
- + learn more
LEED AP BD+C v4 Exam Study Guide with complete solution
-
LEED AP BD+C v4 Exam 2024 With 100% Correct Answers
- Exam (elaborations) • 12 pages • 2024
-
- $13.49
- + learn more
What does the acronym "LEED" stand for? - correct answer Leadership in Energy and Environmental Design 
 
What does the acronym "GBCI" stand for? - correct answer Green Business Certification Inc. 
 
Buildings are __________ and people are __________ - correct answer certified; credentialed 
 
What are the knowledge domains? - correct answer 1. LEED Process, 2. Integrative Strategies, 3. Location and Transportation, 4. Sustainable Sites, 5. Water Efficiency, 6. Energy and Atmosphere, 7. Mate...
-
LEED AP BD+C Study Exam 1| Questions and answers | Latest 2024/25
- Exam (elaborations) • 10 pages • 2024
-
- $11.49
- + learn more
LEED AP BD+C Study Exam 1| Questions and answers | Latest 2024/25
-
LEED AP BD+C EXAM |GUARANTEED PASS |ACCURATE
- Exam (elaborations) • 43 pages • 2024
-
- $15.99
- + learn more
What must your erosion control plan adhere to? - ACCURATE ANSWERS Erosion control plans must adhere to the 2003 EPA Construction General Permit (or local standards, whichever is more stringent). 
 
What is a Phase I Environmental Site Assessment? - ACCURATE ANSWERS A Phase I Environmental Site Assessment is a report prepared for a real estate holding that identifies potential or existing environmental contamination liabilities. 
 
How is a Phase II Environmental Site Assessment more in depth? - ...
-
LEED Green Associate V4 Exam Ch. 1 Questions with 100% Correct Answers | Verified | Latest Update
- Exam (elaborations) • 3 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
LEED Green Associate V4 Exam Ch. 1 Questions with 100% Correct Answers | Verified | Latest Update
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia