Elin wicks Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Elin wicks? On this page you'll find 20 study documents about Elin wicks.

Page 2 out of 20 results

Sort by

HW3_Cost Concepts and Design Economics_EngEconomics HW3_Cost Concepts and Design Economics_EngEconomics
  • HW3_Cost Concepts and Design Economics_EngEconomics

  • Other • 3 pages • 2023
  • Available in package deal
  • Cost concepts refer to the various types of costs that are involved in a project, including direct costs (such as labor and materials) and indirect costs (such as overhead and administration expenses). These costs are analyzed and quantified in order to determine the total cost of a project. Understanding cost concepts is important for engineers because it allows them to accurately estimate the costs associated with a project and identify areas where cost savings can be made. Design economics...
    (0)
  • $2.99
  • + learn more
HW12 - Chapter 7: Depreciation and Income Taxes HW12 - Chapter 7: Depreciation and Income Taxes
  • HW12 - Chapter 7: Depreciation and Income Taxes

  • Other • 3 pages • 2023
  • It discusses the different methods of depreciation (such as straight-line, declining balance, and sum-of-the-years' digits), how to calculate depreciation expenses, and the impact of different depreciation methods on income taxes. The chapter also covers the basics of income taxes, including the different types of taxes and tax rates, tax deductions and credits, and how to calculate income tax expenses.
    (0)
  • $2.99
  • + learn more
HW7_Profitability Measures (PW, FW, AW)_EngEconomics HW7_Profitability Measures (PW, FW, AW)_EngEconomics
  • HW7_Profitability Measures (PW, FW, AW)_EngEconomics

  • Other • 2 pages • 2023
  • Available in package deal
  • The three most commonly used profitability measures are present worth (PW), future worth (FW), and annual worth (AW). Each measure provides a different perspective on the profitability of an investment, and engineers can use them in combination to make informed decisions about the use of resources. Present worth (PW) is the value of all future cash flows of an investment at the present time. Engineers use the present worth factor to calculate the present worth of an investment, taking into ac...
    (0)
  • $2.99
  • + learn more
HW4_Equivalence Calculations_P,F,A,N_EngEconomics HW4_Equivalence Calculations_P,F,A,N_EngEconomics
  • HW4_Equivalence Calculations_P,F,A,N_EngEconomics

  • Other • 2 pages • 2023
  • Available in package deal
  • Equivalence calculations using the four factors - present worth (P), future worth (F), annual worth (A), and nominal rate (N) - are commonly used to compare and evaluate alternative investment options. Present worth (P) is the value today of a series of future cash flows, calculated by discounting them using a given interest rate. Future worth (F) is the value at a future time of a series of present cash flows, calculated by compounding them using a given interest rate. Annual worth (A) is th...
    (0)
  • $2.99
  • + learn more
HW5_Deferred Annuities and More Complicated Equivalence Calculations_EE HW5_Deferred Annuities and More Complicated Equivalence Calculations_EE
  • HW5_Deferred Annuities and More Complicated Equivalence Calculations_EE

  • Other • 2 pages • 2023
  • Available in package deal
  • A deferred annuity is an annuity that does not begin making payments until a specified date in the future. In engineering economy, deferred annuities are often used to evaluate investments in which cash inflows or outflows are expected to occur at a future date. Engineers use present worth, future worth, annual worth, and nominal rate factors to calculate the value of deferred annuities and compare them to other investment options. In more complicated equivalence calculations, engineers may u...
    (0)
  • $2.99
  • + learn more
HW9_Multiple Alternatives_Engineering Economics HW9_Multiple Alternatives_Engineering Economics
  • HW9_Multiple Alternatives_Engineering Economics

  • Other • 2 pages • 2023
  • Multiple alternatives analysis is a decision-making tool used to compare and select the best alternative among several options. Multiple alternatives analysis involves evaluating different alternatives based on their costs, benefits, and risks.
    (0)
  • $2.99
  • + learn more
HW6_Uniform and Geometric Gradients_EngEconomics HW6_Uniform and Geometric Gradients_EngEconomics
  • HW6_Uniform and Geometric Gradients_EngEconomics

  • Other • 2 pages • 2023
  • Available in package deal
  • Uniform gradients are cash flows in which the payment or receipt is the same amount for each period. For example, a uniform gradient might be a series of annual payments of $10,000 over the next five years. Engineers use uniform gradient calculations to evaluate investments and financial decisions with constant cash flows. They can use the present worth factor to calculate the value of a uniform gradient, taking into account the time value of money and the interest rate. Geometric gradients, ...
    (0)
  • $2.99
  • + learn more
HW8_IRR (Internal Rate of Return) and Payback Period_EngEconomics HW8_IRR (Internal Rate of Return) and Payback Period_EngEconomics
  • HW8_IRR (Internal Rate of Return) and Payback Period_EngEconomics

  • Other • 2 pages • 2023
  • IRR (Internal Rate of Return) and Payback Period are two common methods used to evaluate the financial viability of a project. IRR is a financial metric used to determine the rate at which the net present value (NPV) of a project equals zero. It represents the discount rate at which the present value of the expected cash inflows equals the present value of the expected cash outflows. A project is considered financially viable if its IRR is greater than the required rate of return. In other wo...
    (0)
  • $2.99
  • + learn more
HW10_Break-even analysis HW10_Break-even analysis
  • HW10_Break-even analysis

  • Other • 2 pages • 2023
  • Break-even analysis is a tool used in engineering economy to determine the point at which total revenue equals total costs, resulting in neither a profit nor a loss. The break-even point is the level of production or sales at which the total revenue generated by a product or service equals the total cost of producing it.
    (0)
  • $2.99
  • + learn more
HW2_Engineering Economic Analysis_EE HW2_Engineering Economic Analysis_EE
  • HW2_Engineering Economic Analysis_EE

  • Other • 1 pages • 2023
  • Available in package deal
  • Engineering economic analysis is a branch of engineering that deals with the evaluation of engineering projects and investment options from a financial perspective. It involves the application of mathematical and economic principles to assess the feasibility, profitability, and risk of engineering projects.
    (0)
  • $2.99
  • + learn more