Cslb requirements - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cslb requirements? On this page you'll find 185 study documents about Cslb requirements.

Page 2 out of 185 results

Sort by

CSLB Requirements Question And Answers 2023
  • CSLB Requirements Question And Answers 2023

  • Exam (elaborations) • 5 pages • 2023
  • CSLB Requirements Question And Answers 2023
    (0)
  • $13.99
  • + learn more
CSLB Practice Law B  / 230 PLUS Questions with 100% Correct Answers UPDATED 2023
  • CSLB Practice Law B / 230 PLUS Questions with 100% Correct Answers UPDATED 2023

  • Exam (elaborations) • 19 pages • 2023
  • CSLB B Practice Law Exam Questions and Answers 2022/2023, Correct Verified Answers A subcontractor or material supplier has _____ days to file a lien once a notice of completion has been recorded. 30 How must a client submit a claim for service or repair of a defect on fit and finish items after a remodel? By certified mail By overnight mail By personal delivery A contractor meets Mr. Jones at his home to discuss remodeling. The contractor and Mr. Jones sign a contract that includes a...
    (1)
  • $17.99
  • 1x sold
  • + learn more
CSLB Requirements Question And Answers 2023
  • CSLB Requirements Question And Answers 2023

  • Exam (elaborations) • 5 pages • 2023
  • CSLB Requirements Question And Answers 2023
    (0)
  • $13.49
  • + learn more
CSLB Concrete C8 License Practice Test #2 Already Passed
  • CSLB Concrete C8 License Practice Test #2 Already Passed

  • Exam (elaborations) • 21 pages • 2023
  • CSLB Concrete C8 License Practice Test #2 Already Passed The maximum size of the conduit or pipe shall NOT exceed _______ of the thickness of the concrete. 1/3 Which of the following tests for concrete is conducted at the site/field? Color Test Explanation: Rest of the above are laboratory tests. If the concrete compressive strength specified is less than 3600 psi, it has the option of being tested at 28 days and is able to accept the concrete if it attains ___________ percentage of the mini...
    (0)
  • $9.49
  • 1x sold
  • + learn more
CSLB B Trade 622 Questions with Correct Answers 2024/2025
  • CSLB B Trade 622 Questions with Correct Answers 2024/2025

  • Exam (elaborations) • 164 pages • 2024
  • CSLB B Trade 622 Questions with Correct Answers 2024/2025 Lightweight concrete is BEST used at the: A. curb & gutter B. second floor decking C. first floor slab on grade D. footings - Correct Answer B. Second floor decking. It is costly, but very strong. It offers greatest advantage when used for upper stories because it reduces the strength requirements for the supporting framework. What tool do you normally use for striking joints? A. haulk B. trowel C. jointer or jointing tool ...
    (0)
  • $7.99
  • + learn more
CSLB Practice Law B correctly answered graded A+ 2024/2025
  • CSLB Practice Law B correctly answered graded A+ 2024/2025

  • Exam (elaborations) • 24 pages • 2024
  • CSLB Practice Law B A subcontractor or material supplier has _____ days to file a lien once a notice of completion has been recorded. - correct answer 30 How must a client submit a claim for service or repair of a defect on fit and finish items after a remodel? - correct answer By certified mail By overnight mail By personal delivery A contractor meets Mr. Jones at his home to discuss remodeling. The contractor and Mr. Jones sign a contract that includes a three-day cancellation f...
    (0)
  • $19.99
  • + learn more
CSLB PRACTICE LAW B 2024 QUESTIONS WITH  COMPLETE SOLUTIONS ALREADY PASSED
  • CSLB PRACTICE LAW B 2024 QUESTIONS WITH COMPLETE SOLUTIONS ALREADY PASSED

  • Exam (elaborations) • 34 pages • 2024
  • A subcontractor or material supplier has _____ days to file a lien once a notice of completion has been recorded. - CORRECT ANSWER 30 How must a client submit a claim for service or repair of a defect on fit and finish items after a remodel? - CORRECT ANSWER By certified mail By overnight mail By personal delivery A contractor meets Mr. Jones at his home to discuss remodeling. The contractor and Mr. Jones sign a contract that includes a three-day cancellation form. After the cont...
    (0)
  • $18.49
  • + learn more
CSLB Practice Law B Questions  and Answers | 100% Correct  Answer | Grade A+
  • CSLB Practice Law B Questions and Answers | 100% Correct Answer | Grade A+

  • Exam (elaborations) • 45 pages • 2024
  • Available in package deal
  • A subcontractor or material supplier has _____ days to file a lien once a notice of completion has been recorded. Ans: 30 How must a client submit a claim for service or repair of a defect on fit and finish items after a remodel? Ans: By certified mail By overnight mail By personal delivery A contractor meets Mr. Jones at his home to discuss remodeling. The contractor and Mr. Jones sign a contract that includes a three-day cancellation form. After the contractor leaves, Mr. Jones d...
    (0)
  • $15.19
  • + learn more
CSLB B trade Exam Review Questions  and answers, rated A+| latest update 2024/25|
  • CSLB B trade Exam Review Questions and answers, rated A+| latest update 2024/25|

  • Exam (elaborations) • 165 pages • 2024
  • CSLB B trade Exam Review Questions and answers, rated A+ Lightweight concrete is BEST used at the: A. curb & gutter B. second floor decking C. first floor slab on grade D. footings - -B. Second floor decking. It is costly, but very strong. It offers greatest advantage when used for upper stories because it reduces the strength requirements for the supporting framework. What tool do you normally use for striking joints? A. haulk B. trowel C. jointer or jointing tool D. stiff brus...
    (0)
  • $12.49
  • + learn more