Crane load charts - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Crane load charts? On this page you'll find 171 study documents about Crane load charts.
Page 2 out of 171 results
Sort by
-
OSHA 30 Questions and Answers Already Passed
- Exam (elaborations) • 36 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
OSHA 30 Questions and Answers 
 
Already Passed 
 
Those who work on a crane or near crane operations must be trained. Which of the following is 
true for this training? D. All of the above 
 
Certain inspections of crane equipment may be made by a(n) ___________ person; however, 
crane inspections are typically required to be made by a(n) __________ person. Competent, 
qualified 
 
After safety-related modifications have been made to crane equipment, the equipment must be 
inspected by ________...
-
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER there is 
no weight of the crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition 
should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER 
Separate the boom h...
-
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $14.49
- + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Operating a mobile crane with a long boom, on uneven ground, what support condition 
should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER 
Separate the boom hoist lines 
How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, 
before it should be removed from...
-
NCCCO Practice QUESTIONS & CORRECT ANSWERS(GRADED A)
- Exam (elaborations) • 10 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
D. drum rotation indicator, anti-two block, axle lock outs, and positive house lock - ANSWER A 
 
How does the operator determine the manufacturers recommended rope for the crane? 
A. count the sheav...
-
MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+. Where shall the hand signals for the machine in use be posted: On 
the job site 
2. Where is it best to connect slings to lift boom sections: End fittings 
3. All manufacturers load charts and operations manual shall be kept: 
On the machine 
4. When shall wire rope be taken out of service if used as a running line for 
hoisting: Six randomly distributed broken wires i...
Too much month left at the end of the money?
-
NCCCO CORE QUESTIONS AND ANSWERS
- Exam (elaborations) • 15 pages • 2023
-
- $12.99
- + learn more
The term "Superstructure or Upper works" refers to the area of the crane: 
Above the swing circle 
 
 
A crane must be level within _______% for the load chart ratings to be valid? 
1% 
 
 
On what principle is crane stability based? 
Leverage 
 
 
What would be the effect of moving the tipping axis closer to the cranes center of gravity? 
Reduced stability 
 
 
Which of the following matches the appropriate load chart to a particular crane? 
Serial number 
 
 
A durable rating chart with legi...
-
OECP Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED)
- Exam (elaborations) • 23 pages • 2024
-
- $15.49
- + learn more
What are the four different types of 
crane signals? 
Hand 
Voice 
Audible 
New 
2. The shaded area on a load chart 
indicates _______? 
A structural chart 
3. The minimum distance to a power 
line of unknown voltage is ? 
50' 
4. When hoisting personnel and have 
known voltage, can you use Table A 
and get closer than 20'? 
Never! 
5. What is the minimum tale swing 
clearance requirement 
2' 
6. What kind of rigger is required for 
A/D? 
Qualified Rigger 
7. Signal training is now required i...
-
NCCCO Telescopic Boom Crane- LOAD CHARTS Winter 2024 Exam Review Questions and Answers 100% Pass
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $14.99
- + learn more
NCCCO Telescopic Boom Crane- LOAD CHARTS Winter 2024 Exam Review Questions and Answers 100% Pass
-
OSHA 30 Questions & Answers Already Passed!!
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
Those who work on a crane or near crane operations must be trained. Which of the following is true for 
this training? - Answer-D. All of the above 
Certain inspections of crane equipment may be made by a(n) ___________ person; however, crane 
inspections are typically required to be made by a(n) __________ person. - Answer-Competent, qualified 
After safety-related modifications have been made to crane equipment, the equipment must be 
inspected by __________ prior to use. - Answer-A qualified ...
-
MA Hoisting License 1B Questions With Verified Answers Updated 2024/2025 | Graded A+.
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
MA Hoisting License 1B Questions With Verified Answers Updated 2024/2025 | Graded A+. Where shall the hand signals for the machine in use be posted: On 
the job site 
2. Where is it best to connect slings to lift boom sections: End fittings 
3. All manufacturers load charts and operations manual shall be kept: 
On the machine 
4. When shall wire rope be taken out of service if used as a running line for 
hoisting: Six randomly distributed broken wires in 1 la...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia