Cosc 275 palmer exam 1 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cosc 275 palmer exam 1? On this page you'll find 28 study documents about Cosc 275 palmer exam 1.
Page 2 out of 28 results
Sort by
-
COSC 275 Exam 1 Palmer Questions and Answers 100% Accurate
- Exam (elaborations) • 10 pages • 2024
-
Available in package deal
-
- $17.99
- + learn more
COSC 275 Exam 1 Palmer
-
COSC 275 Exam 1 Palmer Questions and Answers Latest Updated
- Exam (elaborations) • 10 pages • 2024
-
Available in package deal
-
- $15.49
- + learn more
COSC 275 Exam 1 Palmer
-
COSC 275 Exam 2 Palmer; Questions and Answers % Correct
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
COSC 275 Exam 2 Palmer; Questions and 
Answers % Correct 
Measures Correct answer-1" = 25.40 milimeters 
1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 
1 kg = 2.2046 lbs 
Geometric Formula: 
Circle Correct answer-Circumference =2r*pi 
Area = pi*r^2 
Geometric Formula: 
Triangle Correct answer-Area: B*1/2H
-
COSC 275 Final Exam Palmer Questions And Answers 100% Verified.
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
COSC 275 Final Exam Palmer Questions 
And Answers 100% Verified. 
Estimating - answerThe process of determining the anticipated cost of materials, labor, and 
equipment of a proposed project. 
Take-off - answerThe process in which detailed lists are compiled, based on drawings and 
specifications, of all the material and equipment necessary to construct a project. The cost 
estimator uses this list to calculate how much it will cost to build the project. 
Quantities - answerMeasured amounts of c...
-
COSC 275 Exam 1 Palmer Questions and answers rated A+ 2024/2025
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
COSC 275 Exam 1 Palmer Questions and answers rated A+ 2024/2025
As you read this, a fellow student has made another $4.70
-
COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
COSC 275 Exam 2 Palmer Questions And 
Answers 100% Verified. 
Measures - answer1" = 25.40 milimeters 
1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 
1 kg = 2.2046 lbs 
Geometric Formula: 
Circle - answerCircumference =2r*pi 
Area = pi*r^2 
Geometric Formula: 
Triangle - answerArea: B*1/2H 
Masterformat 2004: 
00 - answerProcurement and Contracting Requirements 
Masterformat 2004: 
01 - answerGeneral Requirements 
Masterformat 2004: 
02 - answerExisting Conditions 
Masterformat 2004: 
03 - ans...
-
COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025 | Graded A+
- Exam (elaborations) • 15 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
COSC 275 Exam 2 Palmer | Questions 
and Answers | Latest Update | 2024/2025 
 
| Graded A+ 
 
1 kg= ___ lbs 2.2046 
 
1 sq M= ___ sq ft 10.764 
 
1"= ___ millimeters 25.40 
 
4 types of envelope construction Tilt Wall 
Stud with veneer 
 
Masonry 
Glass 
 
A 10' W18x48 Beam weighs how much? (in tons) 10x48 = 480 lbs 
480/2000 = .24 tons 
 
Air Barrier A component of the envelop system that prohibits air leakage into a building and 
reduces the risk of condensation build up. House wrap and flui...
-
COSC 275 Palmer: Exam 1 Notes 2024
- Exam (elaborations) • 8 pages • 2024
-
- $12.49
- + learn more
COSC 275 Palmer: Exam 1 Notes 2024 
Estimating - Correct Answer️️ -The Process of determining the anticipated cost of 
material, labor and equipment of a proposed project. 
Take-off - Correct Answer️️ -The process in which detailed lists are compiled, based 
on drawings and specifications, of all the materials and equipment necessary to 
construct a project. The cost estimator uses this list to calculate how much it will cost to 
build the project. 
Quantities - Correct Answer️️ -Mea...
-
COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+
- Exam (elaborations) • 18 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
COSC 275 Final Exam Palmer | Latest 
Version | 2024/2025 | Rated A+ 
 
(Finish x Thickness)/27 CY of Concrete 
 
20/80 rule 80% of time is used for 20% of take-off 
 
30 amps with 2 breakers ex. 30/2 
 
43,560 1 acre of land = ? SF 
 
Active soil Soil that swells when it comes in contact with water. 
 
Addendum A document describing an addition, change, correction, or modification to 
contract documents. An addendum is issued by the design professional during the bidding period 
or prior to the ...
-
COSC 275 Exam 1 - TAMU Palmer Questions and Answers
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
COSC 275 Exam 1 - TAMU Palmer 
Questions and Answers 
Pounds per square inch - Correct Answer️️ -PSI 
Not in contract - Correct Answer️️ -NIC 
cubic yard - Correct Answer️️ -CY 
Linear Foot (feet) - Correct Answer️️ -LF 
Unless Noted Otherwise - Correct Answer️️ -UNO 
Square Foot (feet) - Correct Answer️️ -SF 
Each - Correct Answer️️ -EA 
Typical - Correct Answer️️ -TYP 
Not to scale - Correct Answer️️ -NTS 
.08 - Correct Answer️️ -1" 
.17 - Correct Answe...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia