Cosc 275 exam 2 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cosc 275 exam 2? On this page you'll find 63 study documents about Cosc 275 exam 2.
Page 2 out of 63 results
Sort by
-
COSC 275 Exam 2 (Palmer) Questions And Answers 100% Verified.
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
COSC 275 Exam 2 (Palmer) Questions And 
Answers 100% Verified. 
Hard bid low price - answerOwner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
Competitive sealed proposals - answerInvolves criteria other than price when awarding 
contract 
Weight given to each criteria that will be considered 
Construction Manager at Risk CMAR - answerConstruction manager hired in design phase 
to assist designer in constructibility. Also gives the owner a good handle on the cost. 
...
-
COSC 275 Exam 2 Palmer | Comprehensive Questions and Answers Latest Updated 2024/2025 With 100% Verified Solutions
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $13.48
- + learn more
COSC 275 Exam 2 Palmer | Comprehensive Questions and Answers Latest Updated 2024/2025 
With 100% Verified Solutions
-
COSC 275 Exam 2 Palmer Questions and Correct Answers
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Hard bid low price 
Answer- Owner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
Competitive sealed proposals 
Answer- Involves criteria other than price when awarding contract 
Weight given to each criteria that will be considered 
Criteria: (changes) 
- Cost 
- Previous experience 
- Qualification of staff 
- Financial stability 
- Project schedule 
Construction Manager at Risk CMAR 
Answer- Construction manager hired in design phase to assist designer in 
const...
-
COSC 275 Exam 2 (Palmer) | Comprehensive Questions and Answers Latest Updated 2024/2025 With 100% Verified Solutions
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $13.48
- + learn more
COSC 275 Exam 2 (Palmer) | Comprehensive Questions and Answers Latest Updated 2024/2025 
With 100% Verified Solutions
-
COSC 275 Exam 2 WOD & Study Materials- Palmer | Questions And Answers Latest {2024- 2025} A+ Graded | 100% Verified
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $13.48
- + learn more
COSC 275 Exam 2 WOD & Study Materials- Palmer | Questions And Answers Latest 
{} A+ Graded | 100% Verified
Make study stress less painful
-
Cosc 275 Exam 2 Test With Solution
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Cosc 275 Exam 2 Test With Solution...
-
COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
COSC 275 Exam 2 Palmer Questions And 
Answers 100% Verified. 
Measures - answer1" = 25.40 milimeters 
1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 
1 kg = 2.2046 lbs 
Geometric Formula: 
Circle - answerCircumference =2r*pi 
Area = pi*r^2 
Geometric Formula: 
Triangle - answerArea: B*1/2H 
Masterformat 2004: 
00 - answerProcurement and Contracting Requirements 
Masterformat 2004: 
01 - answerGeneral Requirements 
Masterformat 2004: 
02 - answerExisting Conditions 
Masterformat 2004: 
03 - ans...
-
COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025 | Graded A+
- Exam (elaborations) • 15 pages • 2024
-
Available in package deal
-
- $10.00
- + learn more
COSC 275 Exam 2 Palmer | Questions 
and Answers | Latest Update | 2024/2025 
 
| Graded A+ 
 
1 kg= ___ lbs 2.2046 
 
1 sq M= ___ sq ft 10.764 
 
1"= ___ millimeters 25.40 
 
4 types of envelope construction Tilt Wall 
Stud with veneer 
 
Masonry 
Glass 
 
A 10' W18x48 Beam weighs how much? (in tons) 10x48 = 480 lbs 
480/2000 = .24 tons 
 
Air Barrier A component of the envelop system that prohibits air leakage into a building and 
reduces the risk of condensation build up. House wrap and flui...
-
COSC 275 Exam 2 Palmer quizzes and answers 2024
- Exam (elaborations) • 11 pages • 2024
-
Available in package deal
-
- $13.49
- + learn more
Hard bid low price - Owner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
 
Competitive sealed proposals - Involves criteria other than price when awarding contract 
Weight given to each criteria that will be considered 
Criteria: (changes) 
- Cost 
- Previous experience 
- Qualification of staff 
- Financial stability 
- Project schedule 
 
Construction Manager at Risk CMAR - Construction manager hired in design phase to assist designer in constructability. 
CM a...
-
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023
- Exam (elaborations) • 10 pages • 2023
-
Available in package deal
-
- $30.49
- 3x sold
- + learn more
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 
Estimating: 
The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
 
 
 
Take-off: 
The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. 
 
 
 
Quantities: 
Measured amounts of construction...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia