Cosc 2 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cosc 2? On this page you'll find 478 study documents about Cosc 2.
Page 2 out of 478 results
Sort by
-
COSC 2436 ALL CHAPTER FINAL EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 53 pages • 2024
-
Available in package deal
-
- $14.49
- + learn more
COSC 2436 ALL CHAPTER FINAL EXAM QUESTIONS AND ANSWERS
-
COSC 253 Exam 1 || Already Passed.
- Exam (elaborations) • 15 pages • 2024
-
Available in package deal
-
- $11.99
- + learn more
A _____ of______ is an individual authorization by TCEQ allowing you to proceed with construction. correct answers Notice, Intent 
 
A Construction Site Notice is required for all sites greater than____ acre. correct answers one 
 
TCEQ stands for_______. correct answers Texas Commission on Environmental Quality 
 
SWPPP stands for_______. correct answers Stormwater Pollution Prevention Plan 
 
(T/F) The SWPPP must remain on site at all times. correct answers T 
 
SWPPP inspections are required ...
-
COSC 253 Final Exam Review || with 100% Errorless Answers.
- Exam (elaborations) • 27 pages • 2024
-
Available in package deal
-
- $13.39
- + learn more
In the United States building operation and construction consumes correct answers •between a third and a half of the nation's energy 
•70 percent of its electricity 
•12 percent of its potable water 
•30 percent of raw materials 
 
Life-Cycle Analysis (LCA) correct answers Embodied energy: The sum total of energy consumed during the materials life cycle 
 
Why is this important? Generally, materials with lower embodied energy are better for the environment than those with greater embodi...
-
COSC 275 Exam 1 Palmer Questions with verified Answers fully solved 2024
- Exam (elaborations) • 14 pages • 2024
-
- $27.99
- + learn more
COSC 275 Exam 1 Palmer Questions with verified Answers fully solved 2024 
 
1.	Estimating- Correct Answer - The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
2.	Take-off- Correct Answer - The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project.
-
COSC 275 Exam 2 Palmer Study Guide
- Exam (elaborations) • 7 pages • 2024
-
- $13.49
- + learn more
COSC 275 Exam 2 Palmer Study Guide
Fear of missing out? Then don’t!
-
COSC 253 - Concrete - Exam 1 || Already Graded A+.
- Exam (elaborations) • 17 pages • 2024
-
Available in package deal
-
- $12.89
- + learn more
Concrete Timeline correct answers 1. *200BC-100AD*: Romans 
2. *1824*: Portland Cement 
3. *1850s*:Reinforcement 
4. *1872*: Portland Cement comes to US 
5. *1920s*: Pre-stressing Concrete 
 
Who invented concrete? correct answers The Romans 
 
The Romans correct answers • used longer spans in sitecast concrete 
• the Pantheon built by the Romans around 50AD had a concrete dome that spans 150 feet. 
• Longer spans in concrete are achieved by using very thin layers 
 
What is meant by "spa...
-
COSC 2 Exam Questions with All Correct Answers
- Exam (elaborations) • 6 pages • 2024
-
Available in package deal
-
- $12.49
- + learn more
COSC 2 Exam Questions with All Correct Answers 
Most languages allow you to use a variation of the decision structure called the ____ structure when you must nest a series of decisions about a single variable. - Answer-case 
 
For maximum efficiency, a good rule of thumb in an AND decision is to ____. - Answer-first ask the question that is more likely to be false 
 
Most programming languages allow you to ask two or more questions in a single comparison by using a(n) ____ operator that joins de...
-
COSC 275 Exam 2 Palmer; Questions and Answers % Correct
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
COSC 275 Exam 2 Palmer; Questions and 
Answers % Correct 
Measures Correct answer-1" = 25.40 milimeters 
1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 
1 kg = 2.2046 lbs 
Geometric Formula: 
Circle Correct answer-Circumference =2r*pi 
Area = pi*r^2 
Geometric Formula: 
Triangle Correct answer-Area: B*1/2H
-
COSC 275 Exam 1 Palmer Questions with Correct Answers
- Exam (elaborations) • 19 pages • 2024
-
- $12.49
- + learn more
COSC 275 Exam 1 Palmer Questions with Correct Answers
-
COSC 253 FINAL EXAM REVIEW || WITH 100% VERIFIED SOLUTIONS.
- Exam (elaborations) • 17 pages • 2024
-
Available in package deal
-
- $12.79
- + learn more
A _____________________ code requirement contains detailed information, is simpler to implement, and provides certainty for designers and builders. 
descriptive 
prescriptive 
performance 
functioning correct answers prescriptive 
 
Which statement below is correct regarding the construction manager project delivery method? 
It is best suited for simple, straight forward projects 
The CM is involved in the project prior to construction 
The CM has very limited influence on the project 
It elimin...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia