Condensate drain - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Condensate drain? On this page you'll find 323 study documents about Condensate drain.
Page 2 out of 323 results
Sort by
-
ABSA: 4th Class Part B - Comprehensive Exam 4 New Update Actual Test with complete solution
- Exam (elaborations) • 43 pages • 2024
- Available in package deal
-
- $9.69
- + learn more
One of the legal responsibilities of the engineer during an inspection is: 
Select one: 
a. To notify the Workers Compensation Board of the inspection 
b. Point out any known or suspected defects to the inspector 
c. To have at least two staff members present at all times 
d. To be in possession of an inspection certificate - Answer-b 
The _____ tubes of a fired hot oil heater have fins on their outer surfaces. 
Select one: 
a. Water 
b. Radiant 
c. Extended type 
d. Fire - Answer-c 
The injecti...
-
NATE Air Conditioning and Heat Pump Exam Questions and Answers Updated 2024/2025 (GRADED)
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $15.99
- + learn more
NATE Air Conditioning and Heat Pump Exam Questions and Answers Updated 2024/2025 (GRADED) The combined output of a heatpump and its auxiliary heat should not exceed the 
calculated heat loss of a home by more than ____%. - ANSWER-15% 
What amount of auxiliary electronic heat is needed when the output of a heat pump on a 
design day equals 18,800 Btuh and the heat loss of a home is 29,700 Btuh? - 
ANSWER-3.2 kWh 
The three processes that transfer heat energy are conduction, convection, and 
_____...
-
Texas Mold Assessment Consultant (MAC) State Exam 2023
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
Texas Mold Assessment Consultant (MAC) State Exam 2023 
 
 
 
What does IICRC stand for? 
Institute of Inspection Cleaning and Restoration Certification 
 
 
What are the 5 principles of Mold Remediation? 
1. Safety and Health Workers and Occupants 
2. Document the Conditions and Work Processes 
3. Control the Contaminate at is Source 
4. Physically Remove the Contamination(Source Removal) 
5. Correct the Moisture Problem to Prevent Recontamination 
 
 
What does SBS stand for? 
Sick Building S...
-
Massachusetts Journeyman Pipefitter Exam (Heating, Cooling) PJ-01 Exam Questions and Answers
- Exam (elaborations) • 7 pages • 2023
-
Available in package deal
-
- $10.09
- 1x sold
- + learn more
1/2" - ANSWER-Sight Glass Minimum Connection 
 
3/4" - ANSWER-Low Water Cut-off Draw Minimum Connection 
 
1" - ANSWER-Water Column Minimum Connection 
 
3/4" - ANSWER-Control Manifold Minimum Connection 
 
1/4" - ANSWER-Sight Glass Drain Minimum Connection 
 
1" - ANSWER-Bottom Blow-Off Minimum Connection 
 
2 1/2" - ANSWER-Bottom Blow-Off Maximum Connection 
 
2 1/2" - ANSWER-Surface Blow-Down Maximum Connection 
 
3" - ANSWER-Threaded Safety Valve Maximum Connection 
 
4 1/2" - ANSW...
-
3rd Class Stationary Steam Engineer License Prep
- Exam (elaborations) • 29 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
3rd Class Stationary Steam Engineer 
 
License Prep 
 
________ are necessary for complete combustion - time, temperature, mixture, and 
atomization 
 
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - 214.7 
 
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The 
blowdown is______psi - 12 
 
an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo- 
generator - steam turbine 
 
a boi...
Make study stress less painful
-
ABSA: 4th Class Part B - Comprehensive Exam 4| 150 Questions| Correct Answers!!
- Exam (elaborations) • 28 pages • 2024
-
Available in package deal
-
- $14.99
- + learn more
One of the legal responsibilities of the engineer during an inspection is: 
Select one: 
 
a. To notify the Workers Compensation Board of the inspection 
b. Point out any known or suspected defects to the inspector 
c. To have at least two staff members present at all times 
d. To be in possession of an inspection certificate - ANSWER b 
 
The _____ tubes of a fired hot oil heater have fins on their outer surfaces. 
Select one: 
 
a. Water 
b. Radiant 
c. Extended type 
d. Fire - ANSWER c 
 
The...
-
TEXAS MOLD REMEDIATION CONTRACTOR STATE EXAM 2024 WITH GUARANTEED CORRECT ANSWERS
- Exam (elaborations) • 22 pages • 2024
-
- $14.49
- + learn more
What does IICRC stand for? - correct answer Institute of Inspection Cleaning and Restoration Certification 
 
What are the 5 principles of Mold Remediation? - correct answer 1. Safety and Health Workers and Occupants 
2. Document the Conditions and Work Processes 
3. Control the Contaminate at is Source 
4. Physically Remove the Contamination(Source Removal) 
5. Correct the Moisture Problem to Prevent Recontamination 
 
What does SBS stand for? - correct answer Sick Building Syndrome 
 
What do...
-
3RD CLASS STATIONARY STEAM ENGINEER LICENSE EXAM QUESTIONS WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 42 pages • 2024
-
- $16.59
- + learn more
_________ are necessary for complete combustion - correct answer time, temperature, mixture, and atomization 
 
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - correct answer 214.7 
 
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The blowdown is______psi - correct answer 12 
 
an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-generator - correct answer steam turbine 
 
a b...
-
4th Class Power Engineering Unit A12 Chapter 4: Feed water Systems Already Passed
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
4th Class Power Engineering Unit A12 
Chapter 4: Feed water Systems Already 
 
Passed 
 
With this system, not electrical power is required to feed make-up water to the boiler: 
Select one: 
a. gravity return system 
b. pump return system 
c. low flow return system 
d. high side return system a 
 
These are similar to combined feedwater feeder/cut-offs, with the exception that they do not have 
integral mechanically operated control valves: 
Select one: 
a. float control feeders 
b. float contro...
-
3rd Class Stationary Steam Engineer License Prep Exam 2024 Questions and Answers.
- Exam (elaborations) • 15 pages • 2024
-
- $12.99
- + learn more
3rd Class Stationary Steam Engineer License Prep Exam 2024 Questions and Answers. 
_________ are necessary for complete combustion - Answer<>time, temperature, 
mixture, and atomization 
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - 
Answer<>214.7 
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 
398 PSI. The blowdown is______psi - Answer<>12 
an oil cooler is commonly used with a(n) ________ when operatin...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia