Breaker failure relay - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Breaker failure relay? On this page you'll find 42 study documents about Breaker failure relay.

Page 2 out of 42 results

Sort by

Stationary Engineer Electric Exam Questions and Answers Latest 2024/2025 (Graded A+)
  • Stationary Engineer Electric Exam Questions and Answers Latest 2024/2025 (Graded A+)

  • Exam (elaborations) • 43 pages • 2024
  • Available in package deal
  • Stationary Engineer Electric Exam Questions and Answers Latest 2024/2025 (Graded A+) An AC circuit consists only of a pure inductance and a power source. The relationship between the voltage and the current in this circuit is that the - Answer current lags the voltage The power factor of a load is equal to the ____________ power divided by the ____________ power. - Answer True ; apparent A 10-ohms and 20-ohms resistor are connected in parallel. The total line current drawn by this parallel...
    (0)
  • $13.99
  • + learn more
NERC Test 1questions With Complete Solutions
  • NERC Test 1questions With Complete Solutions

  • Exam (elaborations) • 18 pages • 2023
  • NERC Test 1questions With Complete Solutions A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed a...
    (0)
  • $9.49
  • + learn more
NERC Certification Practice Questions and Answers (Already GRADED A)
  • NERC Certification Practice Questions and Answers (Already GRADED A)

  • Exam (elaborations) • 13 pages • 2023
  • A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing Area...
    (0)
  • $9.99
  • + learn more
Stationary Engineer Electric Exam Questions and Answers Latest 2024/2025 (Graded)
  • Stationary Engineer Electric Exam Questions and Answers Latest 2024/2025 (Graded)

  • Exam (elaborations) • 43 pages • 2024
  • Stationary Engineer Electric Exam Questions and Answers Latest 2024/2025 (Graded) An AC circuit consists only of a pure inductance and a power source. The relationship between the voltage and the current in this circuit is that the - Answer current lags the voltage The power factor of a load is equal to the ____________ power divided by the ____________ power. - Answer True ; apparent A 10-ohms and 20-ohms resistor are connected in parallel. The total line current drawn by this parallel co...
    (0)
  • $15.49
  • + learn more
NERC SOS quiz Questions and Answers (Already GRADED A)
  • NERC SOS quiz Questions and Answers (Already GRADED A)

  • Exam (elaborations) • 60 pages • 2023
  • If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? Regulation of other services related to control performance 1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection Burden A Balancing Authority is performing Overlap Regul...
    (0)
  • $11.49
  • + learn more
NERC book quiz Questions and Answers (100% Correct Elaborations)
  • NERC book quiz Questions and Answers (100% Correct Elaborations)

  • Exam (elaborations) • 29 pages • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? -4MW Net actual interchange minus Net scheduled interchange is what? Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
    (0)
  • $10.49
  • + learn more
SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A
  • SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A

  • Exam (elaborations) • 109 pages • 2023
  • The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net Interchange Schedule by 20 MWs. D) Increase Net Interchange Sche...
    (0)
  • $11.99
  • + learn more
Practice Test NERC Questions and Correct Answers (GRADED A+)
  • Practice Test NERC Questions and Correct Answers (GRADED A+)

  • Exam (elaborations) • 48 pages • 2023
  • A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? The phase angle will increase. When load is increased phase angle will increase. A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 90 pf= mw/mva The high side of a delta-wye connection transformer is connected to a power s...
    (0)
  • $11.99
  • + learn more
NERC QUESTIONS AND ANSWERS
  • NERC QUESTIONS AND ANSWERS

  • Exam (elaborations) • 14 pages • 2023
  • A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation plans...
    (0)
  • $12.49
  • + learn more
+DALE CRANE'S ORAL AND PRACTICAL EXAM GUIDE AIRFRAME AIRCRAFT ELECTRICAL SYSTEMS WITH VERIFIED SOLUTIONS ALREADY GRADED A=
  • +DALE CRANE'S ORAL AND PRACTICAL EXAM GUIDE AIRFRAME AIRCRAFT ELECTRICAL SYSTEMS WITH VERIFIED SOLUTIONS ALREADY GRADED A=

  • Exam (elaborations) • 6 pages • 2023
  • Why must a switch be derated if it is used in a circuit that supplies incandescent lamps? The high-inrush current caused by the low resistance of the cold filament requires that the switches be derated What is an SPDT switch? A single-pole, double-throw switch Where could you find the part number of a switch in an aircraft electrical system? In the equipment table or bill of materials on the electrical circuit diagram for the aircraft If no specific instructions are avail...
    (0)
  • $14.49
  • + learn more