Bim a - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Bim a? On this page you'll find 210 study documents about Bim a.

Page 2 out of 210 results

Sort by

CVEN 250 Exam 1 Verified A+
  • CVEN 250 Exam 1 Verified A+

  • Exam (elaborations) • 11 pages • 2024
  • CVEN 250 Exam 1 Verified A+ Standard ️️formal document that institutes a uniform method to perform an action or defines a criterion for a product. Standards are defined by organizations such as ANSI (American National Standards Institute) responsible for regulating many engineering standards used in the US Convention ️️methods and criteria used so extensively that they become dominant and generally accepted and adopted by the public. They are also known as "industry standard...
    (0)
  • $11.49
  • + learn more
Revit Test Questions and Answers  Graded A+
  • Revit Test Questions and Answers Graded A+

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • Revit Test Questions and Answers Graded A+ Which of the following workflows is not a way to begin a new Revit project? Pressing the Control-O on the keyboard In Revit, BIM provides a variety of model information. Which piece of information is not offered by BIM? Payroll Which of the following is a 2D representation of all the dimensional information contained on a specific level? Floor Plan Which of the following is not a function found under the Revit application menu? Propert...
    (0)
  • $9.99
  • + learn more
CM 1011 midterm-LSU Test Study Questions with 100% Correct Verified Answers
  • CM 1011 midterm-LSU Test Study Questions with 100% Correct Verified Answers

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • The creation of steel facilitated the construction of sky scrapers - True Conceptual estiamtes must be very accurate - false - conceptual estimates happen before a specific approach is decided for the project.Conceptual estimating is part art and part science. The estimator has to have a "big picture" view, looking for long-range solutions rather than shortsighted BIM stands for Business Industry Manufacturing - False - Business Info Management
    (0)
  • $12.49
  • + learn more
CSI CDT Questions And Correct Answers
  • CSI CDT Questions And Correct Answers

  • Exam (elaborations) • 11 pages • 2024
  • CSI CDT Questions And Correct Answers Integrated projects are distinguished by all of the following characteristics EXCEPT: a. Trust-based collaboration between project team members b. Maximized efficiency through design, fabrication, and construction c. "Just as needed" team involvement to reduce owner's pre-construction expenses d. Compensation structures supporting the early engagement of team members in design and project planning e. Development of virtual project model through ...
    (0)
  • $10.99
  • + learn more
ARE 5.0 - Construction & Evaluation Test with 100% Correct | Latest Updated Graded A+
  • ARE 5.0 - Construction & Evaluation Test with 100% Correct | Latest Updated Graded A+

  • Exam (elaborations) • 34 pages • 2024
  • Competitive bid - Can be public or private and involves more than 1 contractor Negotiated Bid - For privately funded projects, Owner and Architect work with 1 GC to reach a price Why would an Owner hire a Construction Manager as Adviser (CMa)? - To assist in project delivery by providing cost estimating, scheduling, and construction contract management services to the Owner Which project delivery limits the role and responsibilities of the Architect during preconstruction? - IPD Who is r...
    (0)
  • $11.99
  • + learn more
UT High School BIM B | Questions with 100% Correct Answers | Latest Update 2024 | Verified
  • UT High School BIM B | Questions with 100% Correct Answers | Latest Update 2024 | Verified

  • Exam (elaborations) • 13 pages • 2024
  • UT High School BIM B | Questions with 100% Correct Answers | Latest Update 2024 | Verified Jeannette created a document detailing the events of a seminar. She just realized that the events are not in the correct order. How could she quickly edit the document to correct the mistake? - Cut first, then paste In a formal business letter, what would be the proper line spacing between two paragraphs in the body of the text? - Double space Zane needs to show data in a class presentation. He's ...
    (0)
  • $9.99
  • + learn more
Architecture 2: Revit test Questions and  Answers Already Passed
  • Architecture 2: Revit test Questions and Answers Already Passed

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • Architecture 2: Revit test Questions and Answers Already Passed In revit, BIM provides a variety of madel information. Which piece of information is not offered by BIM? Payroll Which of the following is a 2D representation of all the dimensional information contained on a specific level? floor plan Which of the following is not a function under the Revit application menu? properties panel Which of the following workflows is not a way to begin a new Revit project? Pressing the C...
    (0)
  • $9.99
  • + learn more
PDD Review Exam 1 Questions & Answers 2024/2025
  • PDD Review Exam 1 Questions & Answers 2024/2025

  • Exam (elaborations) • 17 pages • 2024
  • PDD Review Exam 1 Questions & Answers 2024/2025 About 80% of the way through the construction documents phase, the architect learns that the authority having jurisdiction (AHJ) will not allow the fire protection drawings to be handled as a deferred submittal. In addition to submitting the construction documents, what is the order of correspondence for getting the deferred submittals approved? - ANSWERSThe International Building Code (2018) 107.3.4.1 states that the documents for the deferr...
    (0)
  • $9.49
  • + learn more
 CON 151 Midterm Exam Questions Well Answered Ready To Pass.
  • CON 151 Midterm Exam Questions Well Answered Ready To Pass.

  • Exam (elaborations) • 10 pages • 2024
  • In general, which of the following is NOT a responsibility of the design team? - Answer Hire sub-contractors A project requires the strength of concrete rebar to be at least 60,000 psi. What type of standard is this? - Answer Material Which of the following organizations does NOT produce standards? - Answer BIM Which of the following are covered by zoning codes (select all that apply)? - Answer Maximum height of the building Building location Setback from property lines ...
    (0)
  • $10.09
  • + learn more
CM 443 Procore Quiz Questions and Answers Already Passed
  • CM 443 Procore Quiz Questions and Answers Already Passed

  • Exam (elaborations) • 14 pages • 2023
  • Available in package deal
  • CM 443 Procore Quiz Questions and Answers Already Passed Once you decide on a name for your business, which of the following is the first action you should take? Form a corporation or a limited liability company Which of the following is the first step in business planning? Performing a SWOT analysis Before entering a joint venture or partnership it is important to establish terms on: Both a & b (Management & Capital Contribution) What is the basis for a strategic plan? Both b & c (It should...
    (0)
  • $9.99
  • + learn more