Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
SCMN 4770 APICS/CPIM EXAM 2 2024/2025 €17,11   Ajouter au panier

Examen

SCMN 4770 APICS/CPIM EXAM 2 2024/2025

 3 vues  0 fois vendu
  • Cours
  • SCMN 4770 APICS/CPIM
  • Établissement
  • SCMN 4770 APICS/CPIM

SCMN 4770 APICS/CPIM EXAM 2 2024/2025

Aperçu 3 sur 19  pages

  • 11 novembre 2024
  • 19
  • 2024/2025
  • Examen
  • Questions et réponses
  • SCMN 4770 APICS/CPIM
  • SCMN 4770 APICS/CPIM
avatar-seller
SCMN 4770 APICS/CPIM EXAM 2
2024/2025

Which of the following are prerequisites to implementing a master production sched-uling system?



I. Define master production schedule (MPS) unit

II. Install an enterprise resource planning (ERP) system

III. Train an employee in MPS concepts and techniques



a. I only

b. I and II only

c. I and III only

d. I, II, and III - Precise Answer ✔✔I and III only



The master production schedule (MPS) translates the sales and operations plan (SOP) into



a. Specific production orders

b. Forecast demand

c. A specific production plan

d. Efficient lot sizes - Precise Answer ✔✔A specific production plan



The master production schedule (MPS) shows when products will physically be avail-able to ship.

a. True b. False - Precise Answer ✔✔False



The master production schedule (MPS) is

a. A statement of current production b. A statement of current demand

c. A statement of both current production and current demand

,d. Neither a statement of current production nor current demand - Precise Answer ✔✔Neither a
statement of current production nor current demand



The master production schedule (MPS) differs from the forecast by considering



I. Capacity limits

II. Production costs

III. The sales and operations plan (SOP)



a. I only

b. I and II only

c. I and III only

d. I, II, and III - Precise Answer ✔✔I, II, and III



The master production schedule (MPS) must be stated in terms that relate to a pro-ducible product.

a. True b. False - Precise Answer ✔✔True



The master production schedule (MPS) must be stated in terms of actual products.

a. True b. False - Precise Answer ✔✔False



In which environment is a planning bill of materials most likely to be used?

a. Make-to-stock

b. Assemble-to-order

c. Engineer-to-order

d. All are equally likely - Precise Answer ✔✔Assemble-to-order



The master production schedule (MPS) considers preferred lot sizes when construct-ing the plan.

a. True b. False - Precise Answer ✔✔True

, Cycle stock is

a. Inventory created to fulfill demand in a seasonal cycle

b. Inventory carried as a result of lot size requirements

c. The total stock built during a given period

d. Inventory carried to cover emergency or unforeseen demand - Precise Answer ✔✔Inventory carried
as a result of lot size requirements



Available-to-promise (ATP) is likely to be least useful in which environment?

a. Make-to-stock

b. Make-to-order

c. Assemble-to-order

d. All are equally likely - Precise Answer ✔✔Make-to-stock



Which formula is used to calculate the projected available inventory balance?

a. Projected available inventory = Previous available inventory + Master production schedule -
AVG(Forecast, Actual orders)

b. Projected available inventory = Previous available inventory + Master production schedule +
AVG(Forecast, Actual orders)

c. Projected available inventory = Previous available inventory + Master production schedule +
MAX(Forecast, Actual orders)

d. Projected available inventory = Previous available inventory + Master production schedule -
MAX(Forecast, Actual orders) - Precise Answer ✔✔Projected available inventory = Previous available
inventory + Master production schedule - MAX(Forecast, Actual orders)



A planning bill of materials is

a. Any bill of materials used in planning activities

b. A bill of materials for new products

c. A bill of materials for products still in development

d. A bill of materials that represents probable usage in an assemble-to-order environment - Precise
Answer ✔✔A bill of materials that represents probable usage in an assemble-to-order environment

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur YANCHY. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €17,11. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

80796 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€17,11
  • (0)
  Ajouter