Basics covered in Level 1 -Correct Answer Nuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? -Correct Answer Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? -Correct An...

[Montrer plus]

Aperçu 2 sur 6  pages

  • 5 novembre 2024
  • 6
  • 2024/2025
  • Examen
  • Questions et réponses
  • FDOT
  • FDOT
avatar-seller
FDOT Earthwork Level 1



FDOT Earthwork Level 1 Exam
Questions and Answers
Basics covered in Level 1 -Correct Answer ✔Nuclear Testing
Speedy Moisture
Report Forms

Earthwork has to do with the roadway in what way? -Correct Answer ✔Earthwork is the
excavation and placement of soils and materials supporting the proposed roadway.

In Earthwork what is a lift? -Correct Answer ✔6" of compacted depth at full width

In Earthwork what is a Lot? -Correct Answer ✔A lot is 1 lift at 500 ft or within compacted
area. Isolated compaction operations are separate lots.

Sampling at the roadway is done for -Correct Answer ✔Done for base, sub grade, and
embankment.

Sampling is determined how -Correct Answer ✔generated with random numbers usually
by a Verification Inspector

What is important about sampling at the roadway -Correct Answer ✔Minimum of three
representative sample combined.

What is LIMS? -Correct Answer ✔Laboratory Info Management System

The proctor theory is when compaction is achieved how -Correct Answer ✔by inputting
energy to expel air and water in the soil voids

Compaction causes -Correct Answer ✔An increase in unit weight, decrease in
compressibility and permeability.

The proctor is determined where and creates what -Correct Answer ✔In a laboratory
and establishes a density standard to be used on the roadway

Lab proctors are created how -Correct Answer ✔Material is gathered from the road and
prepared with different amounts of water then placed in molds and hammered

What is a modified proctor used in -Correct Answer ✔It is used in base, sub grade, MSE
wall back fill materials




FDOT Earthwork Level 1

, FDOT Earthwork Level 1


Modified proctors are created how -Correct Answer ✔With a 10lb hammer(rammer) on a
18" drop with 56 blows per layers with 5 layers in total.

What is a standard proctor used in -Correct Answer ✔It is used in embankment and
structure back fill materials

Standard proctors are created how -Correct Answer ✔With a 5.5lb hammer(rammer) on
a 12" drop with 25 blows per layer with 3 layers in total

Comparison between VT and QC density test tolerance -Correct Answer ✔2 lbs/pcf

What is the STRG -Correct Answer ✔Sampling, Testing, and Reporting Guide (state
wide)

A job guide schedule is -Correct Answer ✔project specific

The material identification number for embankment in the laboratory is -Correct Answer
✔004L

The material identification number for embankment in the field is -Correct Answer
✔004F

The material identification number for base is -Correct Answer ✔030

PP is short for -Correct Answer ✔project personel

Sampling in the field it is important to -Correct Answer ✔sample each type of material
and have enough for a representative sample

When to secure samples -Correct Answer ✔After material is placed but before
compaction effort is applied

Sample transmittal card the source uses what code for the jobsite -Correct Answer ✔08

For material description the minimum is always -Correct Answer ✔Color and texture

On sample bags be sure to put -Correct Answer ✔Project #
Sample #
Location

What is the document that itemizes the minimum requirements for sampling and
testing? -Correct Answer ✔Sampling, testing, reporting guide

Unit weight is -Correct Answer ✔the weight of a material occupying a volume


FDOT Earthwork Level 1

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur PossibleA. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €11,50. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

80467 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!

Récemment vu par vous


€11,50
  • (0)
  Ajouter