SWT-HungLD Complete Solutions
Evaluating testability of the requirements and system are a part of which phase
Select one:
a. Evaluating exit criteria and reporting
b. Test Planning and control
c. Test Implementation and execution
d. Test Analysis and Design ️️D
The difference bet...
Evaluating testability of the requirements and system are a part of which phase
Select one:
a. Evaluating exit criteria and reporting
b. Test Planning and control
c. Test Implementation and execution
d. Test Analysis and Design ✔️✔️D
The difference between re-testing and regression testing is
Select one:
a. re-testing uses different environments, regression testing uses the same environment
b. re-testing is running a test again; regression testing looks for unexpected side effects
c. re-testing is done after faults are fixed; regression testing is done earlier
d. re-testing looks for unexpected side effects; regression testing is repeating those tests
e. re-testing is done by developers, regression testing is done by independent testers ✔️✔️b
What can static analysis NOT find?
Select one:
a. Array bound violations
b. Whether the value stored in a variable is correct
c. The use of a variable before it has been defined
d. The re-definition of a variable before it has been used
e. Unreachable ("dead") code ✔️✔️b
In case of Large Systems
Select one:
a. Only few tests should be run
,b. Testing should be on the basis of Risk
c. Only Good Test Cases should be executed.
d. Test Cases written by good test engineers should be executed. ✔️✔️b
Success Factors for a review include :
Select one or more:
a. Each Review does not have a predefined objective
b. Management supports a good review process.
c. There is an emphasis on learning and process improvement.
d. Defects found are welcomed and expressed objectively ✔️✔️bcd
Which of the following could be a coverage measure for state transition testing?
V All states have been reached.
W The response time for each transaction is adequate.
X Every transition has been exercised.
Y All boundaries have been exercised.
Z Specific sequences of transitions have been exercised.
Select one:
a. V, X and Z
b. V, X, Y and Z
c. X, Y and Z
d. W, X and Y ✔️✔️c
Peer Reviews are also called as
Select one:
a. Technical Review
b. Formal Review
c. Walkthrough
,d. Inspection ✔️✔️a
The place to start if you want a (new) test tool is:
Select one:
a. Search the internet
b. Analyse your needs and requirements
c. Invite a vendor to give a demo
d. Attend a tool exhibition
e. Find out what your budget would be for the tool ✔️✔️b
According to the ISTQB Glossary, regression testing is required for what purpose?
Select one:
a. To verify the success of corrective actions.
b. To motivate better unit testing by the programmers.
c. To prevent a task from being incorrectly considered completed.
d. To ensure that defects have not been introduced by a modification. ✔️✔️d
When do you stop testing?
Select one:
a. When the specified number of faults are found.
b. When all statements have been executed.
c. When the test completion criteria are met.
d. When all high and medium priority tests are complete. ✔️✔️c
The structure of an incident report is covered in the Standard for Software Test Documentation IEEE 829
and is called as : -
Select one:
a. Anomaly Report
b. Test Incident Report
, c. Test Defect Report
d. Defect Report ✔️✔️b
One of the following is not a part of white box testing .
Select one:
a. Boundary value analysis.
b. Random testing
c. Data Flow testing
d. Statement testing. ✔️✔️b
A tool that supports traceability, recording of incidents or scheduling of tests is called:
Select one:
a. a dynamic analysis tool
b. a debugging tool
c. a test execution tool
d. a test management tool ✔️✔️d
Which is not a testing principle?
Select one:
a. Exhaustive testing
b. Pesticide paradox
c. Early testing
d. Defect clustering ✔️✔️a
The review and approved document (i.e. Test plan, System Requirement Specification's) is called as
Select one:
a. Delivery Document
b. Baseline Document
Les avantages d'acheter des résumés chez Stuvia:
Qualité garantie par les avis des clients
Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.
L’achat facile et rapide
Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.
Focus sur l’essentiel
Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.
Foire aux questions
Qu'est-ce que j'obtiens en achetant ce document ?
Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.
Garantie de remboursement : comment ça marche ?
Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.
Auprès de qui est-ce que j'achète ce résumé ?
Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur CertifiedGrades. Stuvia facilite les paiements au vendeur.
Est-ce que j'aurai un abonnement?
Non, vous n'achetez ce résumé que pour €10,71. Vous n'êtes lié à rien après votre achat.