ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE SOLUTIONS GRADED A+ Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False B. False ASTM C172 -Para (4.1.2) - Start mold...

[Montrer plus]

Aperçu 4 sur 43  pages

  • 1 mai 2024
  • 43
  • 2023/2024
  • Examen
  • Questions et réponses
avatar-seller
ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM
QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE
SOLUTIONS GRADED A+


Q1. Start molding specimens for strength tests within 30 minutes after fabricating
the composite sample.


A. True
B. False
B. False


ASTM C172 -Para (4.1.2) - Start molding.
specimens for strength tests within 15 min after fabricating the
composite sample.
Q2. The maximum allowable time between obtaining the first and last portions of
the composite sample may not exceed 5 minutes.


A. True
B. False
B. False


ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obtaining
the first and final portions of the composite sample.
Q3. The composite concrete sample must be protected from sun, wind,
contamination and rapid evaporation.

,A. True
B. False
A. True


ASTM C172 - Para (4.1.2)
Q4. If the concrete contains aggregates larger than those that are appropriate for
a size of mold or equipment used, the sample should be wet sieved before
making the test.


A. True
B. False
A. True


ASTM C172- Para (6.1)
Q5. The composite sample should not be remixed before beginning any tests.


A. True
B. False
B. False


ASTM C172-Para (4.1.1) -The sample shall be combined and remixed with a shovel the
minimum amount necessary to ensure uniformity and compliance with the maximum
time limits
Q6. Sampling should normally be performed, as the concrete is discharged from
the mixer.


A. True
B. False
B. False


ASTM C172-Para (5). NOTE 2—Sampling should normally be performed as the

,concrete is delivered from the mixer.


To the conveying vehicle used to transport the
concrete to the forms; however, specifications may require other points of sampling,
such as the discharge of a concrete pump.
Q7. ASTM Method C172 includes sampling from stationary mixers, paving mixers,
truck mixers, agitators, and non-agitating equipment.


A. True
B. False
A. True


ASTM C172- Para (1.1)
Q8. After sampling is completed, start the tests for slump and air content within:


A. 2 ½ minutes
B. 10 minutes
C. 15 minutes
D. None of the above
D. None of the above


ASTM C172- Para (4.1.2) Start tests for slump, temperature, and air content within 5
min after obtaining the final portion of the composite sample.
Q9. In any case, do not obtain samples until:


A. All the water and admixtures have been added to the concrete
B. 200 revolutions of the drum have been obtained
C. ½ of the water has been added
D. None of the above
A. All the water and admixtures have been added to the concrete.

, ASTM C172- Para (5.2.3). In any case do not obtain samples until after all of the water
has been added to the mixer.
Q10. No samples shall be taken before_________ or after_________ of the batch
has been discharged.


A. 10% or after 90%
B. 20% or after 90%
C. 20% or after 80%
D. None of the above
A. 10% or after 90%


ASTM C172- Para (5.2.1).


NOTE 3—No samples should be taken before 10 % or after 90 % of the batch has been
discharged.


Due to the difficulty of determining the actual quantity of concrete discharged, the intent
is to provide samples that are representative of widely separated portions, but not the
beginning and the end of the load.
Q11. When strength tests are to be made, the minimum size of the composite
sample shall be:


A. ¼ cubic foot
B. 1 cubic foot
C. Any convenient size
D. 1 Wheelbarrow
B. 1 cubic foot


ASTM C172- Para (5.1).


Make the samples to be used for strength tests a minimum of 28 L (1 ft3).

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur NurseAdvocate. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €11,22. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

77988 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€11,22  2x  vendu
  • (0)
  Ajouter