Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
Test Bank For Project Management in Practice, 7th Edition Meredith Chapter 1-8 A+ €13,82   Ajouter au panier

Examen

Test Bank For Project Management in Practice, 7th Edition Meredith Chapter 1-8 A+

 2 vues  0 achat
  • Cours
  • Établissement

Test Bank For Project Management in Practice, 7th Edition Meredith Chapter 1-8 A+

Aperçu 4 sur 138  pages

  • 14 mars 2024
  • 138
  • 2023/2024
  • Examen
  • Questions et réponses
avatar-seller
Test Bank For
Project Management in Practice, 7th Edition Meredith
Chapter 1-8

Chapter 1: The World of Project Management
True/False
1. A primary purpose of forming projects is to assign the responsibility for
accomplishing some organizational task to a specific person or small group.

Answer: True
Response: See section 1.1
Level: easy



2. One of the few similarities between project management and general management
is that both exist in the well-defined organizational structure of
superior/subordinates in the overall organization.

Answer: False
Response: See section 1.2
Level: medium



3. Many recent developments in project management are being driven by changes in
the nature of the American workforce.

Answer: False
Response: See section 1.1
Level: medium



4. There has been a growing use of projects to achieve an organization’s strategic
goals

Answer: True
Response: See section 1.1
Level: medium




Copyright ©2017 John Wiley & Sons, Inc.

,5. While general managers have their authority limited to specific areas in the
overall organization, project managers have authority over any activity required
by the project.

Answer: False
Response: See section 1.2
Level: medium



6. Projects are always carried out under conditions of uncertainty.

Answer: True
Response: See section 1.3
Level: easy



7. One can trade-off time and cost when managing a project, but the project’s
technical specifications must be maintained exactly as the client initially specifies.

Answer: False
Response: See section 1.3
Level: medium



8. Nonnumeric project selection methods are only suitable if numeric methods are
not available.

Answer: False
Response: See section 1.5
Level: medium


9. When using financial methods for selecting projects, the payback period is the
simplest and best method to use.

Answer: False
Response: See section 1.5
Level: medium



10 Rank-ordering a large number of projects can be done with a Q-sort.



Copyright ©2017 John Wiley & Sons, Inc.

, Answer: True
Response: See section 1.5
Level: medium



11. A disadvantage of using the payback period method for selecting projects is that it
cannot reflect the time-value of money.

Answer: True
Response: See section 1.5
Level: medium




12. A disadvantage of using the discounted cash flow method (or net present value)
for selecting projects is that it ignores all non-monetary factors associated with the
project except risk.

Answer: True
Response: See section 1.5
Level: medium



13. A disadvantage of using scoring models rather than financial models for selecting
projects is that they cannot include the project’s profitability.

Answer: False
Response: See section 1.5
Level: medium



14. A PM does not need to understand why a project is selected for funding because
he did not initiate the process.

Answer: False
Response: See section 1.5
Level: medium



15. The main distinction between platform and breakthrough projects is that the
former usually depend on existing technology.


Copyright ©2017 John Wiley & Sons, Inc.

, Answer: True
Response: See section 1.6
Level: medium



16. The main distinction between platform and derivative projects is that the latter
depend on existing technology.

Answer: False
Response: See section 1.6
Level: medium




17. One reason for the emphasis on project management is that tasks fit neatly into
business-as-usual.

Answer: False
Response: See section 1.1
Level: easy



18. Programs are subdivisions of projects.

Answer: False
Response: See section 1.1
Level: easy



19. Projects are subdivisions of programs.

Answer: True
Response: See section 1.1
Level: easy



20. A similarity between project management and general management is the
tendency to ―manage by exception.‖


Copyright ©2017 John Wiley & Sons, Inc.

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur ASolution. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €13,82. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

73314 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€13,82
  • (0)
  Ajouter