2023/2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 300 QUESTIONS & 100% CORRECT VERIFIED ANSWERS WITH RATIONALES | AGRADE| MOST RECENT A Subcontractor's employee incorrectly performs the Work. Who is responsible (to the Owner) for the error? 1- Subcontractor employee 2- Architect 3- Subcontractor 4- Contractor -ANSWER -A201: 3.3.2 Article 3) Contractor 3.3 Supervision and Construction Procedures 4- Contractor Which of the following is NOT a cause for the Owner to terminate the Contract? 1- The Contractor experiences delays due to a Stop Work order through an act of government 2- The Contractor fails to make payment to Subcontractors for labor 3- The Contractor is guilty of substantial breach of a provision of the Contract Documents 4- The Co ntractor repeatedly fails to supply enough properly skilled workers -
ANSWER -A201: 14.2.1 Article 14) Termination or Suspension of the Contract 14.2 Termination by the Owner for Cause 1- The Contractor experiences delays due to a Stop Work order through an act of government Which of the following is owner of all drawings and specifications? 1- Contractor 2- Owner 3- Architect 4- Supplier -ANSWER -A201: 1.5.1 Article 1) General Provisions 1.5 Ownership and Use of Drawings, Specifications and Other Instruments of Service 3- Architect Except for those Claims excluded by this AIA A201 Section 15,2,1, an initial decision shall be required as a condition precedent to mediation of any Claim arising prior to the date final payment is due, unless 3 0 days have passed after the Claim has been referred to the Initial Decision Maker with no decision having been rendered. 1- 10 2- 20 3- 15 4- 30 -ANSWER -A201: 15.2.1 Article 15) Claims and Disputes 15.2 Initial Decision 4- 30 The ____________ will on request furnish to a ____________ information regarding percentages of completion or amounts applied for by the Contractor 1- Subcontractor; Owner 2- Architect; Subcontractor 3- Owner; Subcontractor 4- Owner; Architect -ANSWER -A201: 9.6.3 Articl e 9) Payments and Completiong 9.6 Progress Payments 2- Architect; Subcontractor To whom is the Subcontractor bound to by the Contract Documents? 1- Architect 2- Owner 3- Themselves 4- Contractor -ANSWER -A201: 5.3 Article 5) Subcontractors 5.3 Subco ntractual Relations 4- Contractor The Initial Decision Maker will review claims within 10 days of the receipt of the Claim take one or more of the following actions. Which of the following actions will NOT be taken? 1- Approve the Claim 2- Request additional supporting data from the Claimant 3- Reject the Claim 4- Ignore the request -ANSWER -A201: 15.2.2 Article 15) Claims and Disputes 15.2 Initial Decision 4- Ignore the request A Sub -subcontractor is a person or entity who has a direct or i ndirect contract with a/an ________________ to perform a portion of the Work at the site 1- Contractor 2- Subcontractor 3- Architect 4- Supplier -ANSWER -A201: 5.1.2 Article 5) Subcontractors 5.1 Definitions 2- Subcontractor If the Work is stopped for a period of ______ consecutive days through no fault of the Contractor, or Subcontractor, agents, employees or any other persons performing portions of the Work under contract with the Contractor, the Contractor may terminate the Contract and recover f rom the Owner 1- 120 2- 60 3- 30 4- 45 -ANSWER -A201: 14.1.4 Article 14) Termination or Suspension of the Contract 14.1 Termination by the Contractor 2- 60 What is the maximum amount of time after Substantial Completion of the Work shall all clai ms (by Owner and Contractor) regarding the Contract by commenced? 1- Six months
Les avantages d'acheter des résumés chez Stuvia:
Qualité garantie par les avis des clients
Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.
L’achat facile et rapide
Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.
Focus sur l’essentiel
Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.
Foire aux questions
Qu'est-ce que j'obtiens en achetant ce document ?
Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.
Garantie de remboursement : comment ça marche ?
Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.
Auprès de qui est-ce que j'achète ce résumé ?
Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur muriithikelvin098. Stuvia facilite les paiements au vendeur.
Est-ce que j'aurai un abonnement?
Non, vous n'achetez ce résumé que pour €25,38. Vous n'êtes lié à rien après votre achat.