Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
CUSP - T&D Questions & Answers | 150 Questions with 100% Correct Answers | Verified | 24 Pages €15,20   Ajouter au panier

Examen

CUSP - T&D Questions & Answers | 150 Questions with 100% Correct Answers | Verified | 24 Pages

 85 vues  3 achats
  • Cours
  • CUSP - T&D
  • Établissement
  • CUSP - T&D

As per CAN/ULC S801, on an electrical distribution overhead utility line circuit, verification of voltage absence can be achieved by: - Using an approved voltage detector. Isolation and tagging (no locks) is acceptable on an overhead distribution circuit under some of the following conditions, E...

[Montrer plus]

Aperçu 3 sur 24  pages

  • 25 mai 2023
  • 24
  • 2022/2023
  • Examen
  • Questions et réponses
  • CUSP - T&D
  • CUSP - T&D
avatar-seller
CUSP - T&D Questions & Answers As per CAN/ULC S801, on an electrical distribution overhead utility line circuit, verification of voltage absence can be achieved by: - ✔✔Using an approved voltage detector. Isolation and tagging (no locks) is acceptable on an overhead distribu tion circuit under some of the following conditions, EXCEPT for: - ✔✔The isolation can be operated from the ground directly at the base of a structure. Isolation and tagging (no locks) is acceptable for an overhead distribution circuit under some of the following conditions: - ✔✔1. The isolation point is a physical and visual like a line cut or riser removed. 2. The isolation point can only be operated by the operating authority or qualified worker. 3. The isolation point is protected from unauthorized access such as vertical height spacing. Consider that a circuit has been isolated, tagged and grounded. workers returning the next day must: - ✔✔Visually check grounds to verify they are in good order, secure and test for voltage. For lockout purposes, energy isolating devices shall be labelled or marked using a standardized nomenclature and format to indicate their function. Identification shall include: - ✔✔The equipment type, energy type, and magnit ude. Utilities often use a permitting system due to special circumstances of which conventional lockout is impracticable. The following is NOT a justified approach to this process: - ✔✔The isolation points are only simple single step actions. A high volt age utility or electrical company is authorized to use Complex Lockout (tag permitting) under what regulatory condition: - ✔✔A variance application has been approved by the provincial authority. Utilities often use a permitting system due to special circu mstances of which conventional lockout is impracticable. The following are justified approaches to this process: - ✔✔1. The isolation points are located in remote areas with difficult or restricted access. 2. The length of time to perform the lockout is im practicable. 3. Excessive numbers of persons required to lockout. Work on a distribution line must consider the following items when performing isolation and de -
energizing of the circuit.: - ✔✔1. Whether there are multiple sources of energy (loop feed) o n the circuit. 2. Is the line isolating device capable of interrupting load. 3. Is the line to be subject to inductive or capacitive charge. According to the CAN/ULC S801, what is the LEAST DESIRABLE type of fall protection: - ✔✔Fall Arrest System (FAS) Within Z259.14 standards fall restriction equipment (FRE) may only be leather in subcomponents or elements that are NOT exposed to: - ✔✔A dynamic load. As per Z259 standards, energy absorbing lanyards shall be classified according to their ability to absorb the kinetic energy from a fall as follows: - ✔✔Class E4 (4.0 kN) and Class E6 (6.0 kN) energy absorbing lanyards. Assuming that the fall protection system is correctly being used, in what scenario might the worker still contact the ground if they fell: - ✔✔Working 16 feet up in a bucket truck on distribution secondary services using a six foot shock absorbing lanyard, connected to the approved bucket anchor. What is NOT defined as a requirement of temporary vertical life lines as per Z259 standards: - ✔✔100% polypropylene fibers provide the greatest breaking strength. Requirements of temporary vertical life lines, as per Z259 standards: - ✔✔1. Shall be made from synthetic fibers with breaking strength of 27 kN or greater. 2. They shall be free of splices and knots, except at the terminations. 3. They shall be installed to protect against abrasion and sharp edges. Working on an energized lattice tower requires emergency response consistent with the associated hazards. What is NOT required as part of the emergency planning: - ✔✔Daily practice of tower rescue method.

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur Tulloch. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €15,20. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

73314 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€15,20  3x  vendu
  • (0)
  Ajouter