Disciplined Agile Scrum Master (DASM) (Answered) Complete Solution
What does a well-written user story describe?
A fixed outcome.
The needs of all users.
The expectations of the product owner.
The customers' perspective.
The customers' perspective.
Which is not a feature of a user story?
...
disciplined agile scrum master dasm answered complete solution what does a well written user story describe a fixed outcome the needs of all users the expectations of the product owner the c
École, étude et sujet
Disciplined Agile Scrum Master
Tous les documents sur ce sujet (20)
Vendeur
S'abonner
LectDan
Avis reçus
Aperçu du contenu
Disciplined Agile Scrum Master (DASM)
(Answered) Complete Solution
What does a well-written user story describe?
A fixed outcome.
The needs of all users.
The expectations of the product owner.
The customers' perspective.
The customers' perspective.
Which is not a feature of a user story?
Achievable
Estimable
Testable
Negotiable
Achievable
A company is introducing new features to a large, existing product. Which
technique should the product team employ?
Continuous integration
Pull system
Minimum business increment (MBI)
Minimum viable product (MVP)
Minimum business increment (MBI)
What is Epic?
A collection of smaller user stories
Large stories that take a lot of effort, often multiple iterations, to complete.
Great way to visually work through the analysis of a high-level requirement or
strategy.
A simple way to explore the entities and their relationships.
Large stories that take a lot of effort, often multiple iterations, to complete.
A scrum master needs to set up a team for a long-term project that has the
potential for significant budgeting and tracking overhead. What type of team
should the scrum master set up?
A long-standing team
A cross-functional team
A project team
A shared services team
A long-standing team
What are the three categories of process blades, according to Disciplined Agile
(DA)? (Choose three)
Disciplined Project Management Office (PMO)
Disciplined Kanban
Disciplined DevOps
Disciplined Agile IT
Disciplined Agile Delivery (DAD)
,Disciplined DevOps
Disciplined Agile IT
Disciplined Agile Delivery (DAD)
The team lead notices that a team member is falling behind on their work. What
would a good Disciplined Agile team lead do?
Provide time management training to the team member.
Have a conversation with the team member to better understand what is getting
in their way and look for solutions together.
Have a one-to-one meeting with the team member about their recent failures.
Redistribute the team member's work across the team to avoid embarrassing the
team member.
Have a conversation with the team member to better understand what is getting in their
way and look for solutions together.
In Team Estimation...
You first estimate the relative sizes of all stories, then assign numbers to them.
Each team is ranked in order of importance for completing a task.
Members of a group define what criteria will be used for determining the
"Definition of Done".
You estimate what roles will be necessary in order to complete user stories.
You first estimate the relative sizes of all stories, then assign numbers to them.
A team is about to begin work on a project that will face rapidly changing with
releases only every six months or so. The team does not have an agile mindset,
and does not want to release often. Which lifecycle should the scrum master
select?
Agile
Traditional
Program
Lean
Lean
The Kaizen feedback loop can be summarized as:
Plan, Do, Monitor, Study
Study, Act, React, Demo
Plan, Implement, Demo, Study
Plan, Do, Study, Act
Plan, Do, Study, Act
What are Disciplined Agile milestones based on?
Documentation
Lean governance
Continuous integration
Lifecycle
Lifecycle
What goal diagrams should a team select first?
The goals in which the team has the least experience.
The goals that are selected by the customer and stakeholders.
The goals that are the easiest to complete.
Goals that are most relevant to the team's context and life cycle.
, Goals that are most relevant to the team's context and life cycle.
How should iterations for an agile project be planned?
At the beginning of each iteration by pulling from product backlog.
Iteratively by the product owner to ensure global optimization.
Throughout the project by using iteration reviews to continuously improve
quality.
At the retrospective meetings to ensure nothing is missed from one iteration to
the next.
At the beginning of each iteration by pulling from product backlog.
What is the main role of the team lead?
Ensure that the team builds the product right
Ensure that the team builds the right product
Build the product
Coordinate the building of the product.
Coordinate the building of the product.
Which phase of the project life cycle develops a consumable solution in a
collaborative and incremental manner?
Execution
Inception
Construction
Transition
Construction
Push is when work is:
Delayed until later.
Given to people.
Expedited to meet a deadline.
Outsourced to a vendor.
Given to people.
Which of these tools or techniques should be used to sequence work to deliver
value quickly?
Planning Poker
Minimum business increment (MBI)
Work in process (WIP) limits
Minimum viable product (MVP)
Minimum business increment (MBI)
During which iterative ceremony should someone obtain feedback?
Iteration demo.
Daily stand-up/coordination meeting.
Iteration planning.
Retrospective.
Iteration demo.
What are the three phases of DAD's delivery life cycle?
Introduction, Substance. Alteration.
Initiation, Foundation, Conversion.
Commencement, Creation, Evolution.
Inception, Construction, Transition.
Les avantages d'acheter des résumés chez Stuvia:
Qualité garantie par les avis des clients
Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.
L’achat facile et rapide
Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.
Focus sur l’essentiel
Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.
Foire aux questions
Qu'est-ce que j'obtiens en achetant ce document ?
Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.
Garantie de remboursement : comment ça marche ?
Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.
Auprès de qui est-ce que j'achète ce résumé ?
Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur LectDan. Stuvia facilite les paiements au vendeur.
Est-ce que j'aurai un abonnement?
Non, vous n'achetez ce résumé que pour €11,05. Vous n'êtes lié à rien après votre achat.