Oecp - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Oecp? On this page you'll find 91 study documents about Oecp.

All 91 results

Sort by

OECP Exam Questions With 100% Complete Solutions Popular
  • OECP Exam Questions With 100% Complete Solutions

  • Exam (elaborations) • 18 pages • 2024
  • OECP Exam Questions With 100% Complete Solutions What are the four different types of crane signals? - Answer- Hand Voice Audible New The shaded area on a load chart indicates _______? - Answer- A structural chart The minimum distance to a power line of unknown voltage is ? - Answer- 50' When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? - Answer- Never! What is the minimum tale swing clearance requirement - Answer- 2' What kind of rigger is r...
    (0)
  • $12.49
  • 1x sold
  • + learn more
OECP Test Questions And Answers With Complete Solutions
  • OECP Test Questions And Answers With Complete Solutions

  • Exam (elaborations) • 31 pages • 2024
  • OECP Test Questions And Answers With Complete Solutions
    (0)
  • $12.99
  • + learn more
OECP FINAL EXAM WITH ALL QUESTIONS AND CORRECT ANSWERS
  • OECP FINAL EXAM WITH ALL QUESTIONS AND CORRECT ANSWERS

  • Exam (elaborations) • 29 pages • 2024
  • Available in package deal
  • OECP FINAL EXAM WITH ALL QUESTIONS AND CORRECT ANSWERS...
    (0)
  • $11.49
  • + learn more
OECP Test Questions with All Correct Answers
  • OECP Test Questions with All Correct Answers

  • Exam (elaborations) • 19 pages • 2024
  • OECP Test Questions with All Correct Answers When taking a side strain on a boom, what concerns the operator most? A. No concern B. Boom damage C. Tipping D. Boom tip damage - Answer- B. Boom damage The primary purpose for a rooster sheave or auxiliary boom point sheave is to: A. Separate the hoist lines B. Add height to the boom C. Increase the load radius D. Decrease the load radius - Answer- A. Separate the hoist lines Eccentric main boom tip reeving causes: A. increase...
    (0)
  • $12.99
  • + learn more
OECP TEST QUESTIONS AND 100 % VERIFIED ANSWERS 2024-2025
  • OECP TEST QUESTIONS AND 100 % VERIFIED ANSWERS 2024-2025

  • Exam (elaborations) • 39 pages • 2024
  • Available in package deal
  • OECP TEST QUESTIONS AND 100 % VERIFIED ANSWERS ...
    (0)
  • $11.49
  • + learn more
OECP TEST (TERMS AND QUESTIONS) SOLVED 100% CORRECT!!
  • OECP TEST (TERMS AND QUESTIONS) SOLVED 100% CORRECT!!

  • Exam (elaborations) • 18 pages • 2024
  • OECP TEST (TERMS AND QUESTIONS) SOLVED 100% CORRECT!!
    (0)
  • $15.99
  • + learn more
OECP TEST QUESTIONS AND ANSWERS
  • OECP TEST QUESTIONS AND ANSWERS

  • Exam (elaborations) • 19 pages • 2024
  • OECP TEST QUESTIONS AND ANSWERS
    (0)
  • $12.49
  • + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED)
  • OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED)

  • Exam (elaborations) • 23 pages • 2024
  • OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED) The shaded area on a load chart indicates _______? A structural chart 3. The minimum distance to a power line of unknown voltage is ? 50' 4. When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? Never! 5. What is the minimum tale swing clearance requirement 2' 6. What kind of rigger is required for A/D? Qualified Rigger 7. Signal training is now required in the construction...
    (0)
  • $15.99
  • + learn more
OECP Exam Test Questions and Accurate Solutions  for Exam Rated.
  • OECP Exam Test Questions and Accurate Solutions for Exam Rated.

  • Exam (elaborations) • 38 pages • 2024
  • OECP Exam Test Questions and Accurate Solutions for Exam Rated.
    (0)
  • $15.49
  • + learn more
OECP OECP Exam (elaborations) Questions & answers
  • OECP OECP Exam (elaborations) Questions & answers

  • Exam (elaborations) • 36 pages • 2024
  • OECP OECP Exam (elaborations) Questions & answers
    (0)
  • $7.99
  • + learn more