Npdes - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Npdes? On this page you'll find 387 study documents about Npdes.
Page 4 out of 387 results
Sort by
-
WALMART / SAM'S SAFETY, EMPLOYMENT, WASTE, STORMWATER COMPLIANCE CERTIFICATION EXAM 2024
- Exam (elaborations) • 8 pages • 2024
-
- $15.49
- + learn more
WALMART / SAM'S SAFETY, EMPLOYMENT, WASTE, STORMWATER COMPLIANCE CERTIFICATION EXAM 2024 
 
 
The 1970's law that set into place the regulation of stormwater is: 
-the federal pollution discharge elimination rule 
-the stormwater pollution control act 
-the national water control act 
-the clean water act - correct answer the clean water act 
 
Requirements for managing stormwater activity on a construction site are outlined in the following regulation 
-NOI 
-NPDES 
-NOT 
-DOT - correct a...
-
CISEC abbreviations fully solved graded A+ 2024/2025
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $17.99
- + learn more
CISEC abbreviations 
EPA 
Environmental Protection Agency 
 
 
S&EC Drawings 
Sediment and Erosion Control Drawings 
 
 
 
Brainpower 
Read More 
CWA 
Clean Water Act 
 
 
NPDES 
National Pollutant Discharge Elimination System 
 
 
BMPs 
Best Management Practices 
 
 
SW 
Stormwater
-
Wastewater D License Exam Study Questions and Answers 2024-2025
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
How many PPB equals one PPM? - One thousand parts per billion equals one part per million 
 
If the bubbler system air supply line at the wet well is clogged, what will this cause the pump to do? - Pressure build up in the supply line would signal more water column then there really was, causing the pump to run longer than necessary, possibly not kick off and run continually 
 
If the bubbler system air supply line at the wet well has a hole in it above the water level, what will this cause the ...
-
TEST FROM BIGSWPPP Questions & answers 100% Correct!
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
Motives for staying in compliance with stormwater objectives include: 
 
A. Staying out of trouble with the law 
B. Appeasing environmental groups 
C. Making your boss happy 
D. None of these answers - ANSWERSA 
 
NPDES stands for: 
 
A. National Pollution Division of Environmental Science 
B. Non Pollution Discharge Elimination Standards 
C. National Pollution Development Erosion Standards 
D. National Pollutant Discharge Elimination System - ANSWERSD 
 
The law that set into place stormwater r...
-
Certified Storm Water Operator Training Questions and Answers 100% Correct
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
Certified Storm Water Operator Training Questions and Answers 100% CorrectCertified Storm Water Operator Training Questions and Answers 100% CorrectCertified Storm Water Operator Training Questions and Answers 100% CorrectWhat are the three criteria to consider when determining if storm water discharge coverage is needed under the National Pollutants Discharge Elimination System (NPDES) industrial storm water permits? - ANSWER-1. The industry is identified in the federal storm water regulations ...
Want to regain your expenses?
-
CESSWI Part 2 Exam Questions And Answers All Verified
- Exam (elaborations) • 35 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
CESSWI Part 2 Exam Questions And Answers All Verified 
 
Multiple Hat Role 
Primary Role - Determine Regulatory Compliance of site 
Official Representative On-Site 
Fact Finder and Record Keeper 
Enforcement Case Developer 
Technical Instructor 
 
 
CESSWI 
Certified Erosion, Sediment and StormWater Inspector 
 
 
Good Inspectors Skills 
Inquisitiveness, Thoroughness, Consistency, Integrity, Conflict Resolution, and Communication 
 
 
Plan Types 
SWPPP, ESCP, Drainage/Grading Plan, SPCC, SWMP 
...
-
CESSWI PART I QUESTIONS WITH COMPLETE SOLUTIONS 100% VERIFIED 2024/2025
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
CESSWI PART I QUESTIONS WITH COMPLETE SOLUTIONS 100% VERIFIED 2024/2025 
CESSWI is qualified to preform what inspections? - Correct Answer Construction, post construction, industrial, MS4 
 
Clean Water Act year of creation and intent of law - Correct Answer 1972, enacted to restore and maintain the physical, bio, chem integrity of the waters of the US 
 
CWA Section 402 - Correct Answer Est. NPDES System, originally focused on industrial process waste water and POTW 
 
CWA Section 404 - Correct...
-
CESSWI QUESTIONS WITH 100 % CORRECT ANSWERS | VERIFIED
- Exam (elaborations) • 36 pages • 2024
- Available in package deal
-
- $8.39
- + learn more
Erosion - Answer-process in which, by the actions of wind and/or water, soil particles detached and 
transported 
Sediment - Answer-eroded material suspended in wind or water 
Sedimentation - Answer-deposition of eroded material 
Types of Erosion - Answer-splash 
sheet 
rill 
gully 
channel 
Splash erosion - Answer-raindrop impact energy is enough to dislodge surface sediments 
sheet erosion - Answer-caused by rain splash detaching soil particles lifting them up and removing 
them by shallow "s...
-
CESSWI Certification Sections 1 & 2 Questions with Approved Answers |Latest 2024/2025
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Why was the CWA enacted? To restore and maintain the chemical, physical and biological integrity of the waters of the U.S. 
 
A copy of the SWPPP must be kept... at the site from the time construction begins until the site is stabilized. 
 
Stormwater is, as defined under EPA's NPDES rules,... stormwater runoff, snow melt runoff, and surface runoff or drainage 
 
What is a point source? Conveyance such as a pipe, ditch, channel, tunnel, conduit, discrete fissure or container, floating...
-
CESSWI Certification, Part 1 Knowledge Check with complete solutions |Latest 2024/2025
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Key goals for NPDES Program Implementation Reduce the discharge of pollutants to "maximum extent practicable"; protect water quality; satisfy requirements of CWA 
 
SWPPP Addresses operations that come in contact with stormwater/precipitation and the specific BMPs for reduction or elimination of pollutant discharges. 
 
ESCP Shows all required erosion and sediment controls including design, placement and details of BMPs. 
 
Grading and Grading Plan -Component of SWPPP 
-Used for in...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia