Nerc test 1 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc test 1? On this page you'll find 120 study documents about Nerc test 1.

Page 3 out of 120 results

Sort by

NERC text 130 questions with complete solutions Graded A+ (LATEST 2024/2025_)
  • NERC text 130 questions with complete solutions Graded A+ (LATEST 2024/2025_)

  • Exam (elaborations) • 33 pages • 2024
  • NERC text 130 questions with complete solutions Graded A+ (LATEST 2024/2025_)NERC text 130 questions with complete solutions Graded A+ (LATEST 2024/2025_)NERC text 130 questions with complete solutions Graded A+ (LATEST 2024/2025_)
    (0)
  • $17.99
  • + learn more
NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct
  • NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct

  • Exam (elaborations) • 54 pages • 2024
  • Available in package deal
  • If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of the follow...
    (0)
  • $16.49
  • + learn more
NERC PREP TEST 101| 200 Questions| accurate Answers| Latest Update
  • NERC PREP TEST 101| 200 Questions| accurate Answers| Latest Update

  • Exam (elaborations) • 38 pages • 2024
  • NERC PREP TEST 101| 200 Questions| accurate Answers| Latest Update 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - ANSWER a. Generator MVAR output would increase 2. When system conditions are s...
    (0)
  • $13.99
  • + learn more
NERC Test 1questions With Complete Solutions
  • NERC Test 1questions With Complete Solutions

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • NERC Test 1questions With Complete Solutions
    (0)
  • $11.49
  • + learn more
NERC Test | 222 Questions| WITH COMPLETE SOLUTIONS
  • NERC Test | 222 Questions| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • NERC Test | 222 Questions| WITH COMPLETE SOLUTIONS What percentage of load gives a 1 Hz change in an island condition? Answer-6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? Answer-Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? Answer-Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done wi...
    (0)
  • $12.49
  • + learn more
HSI Final Test Questions with Correct Answers 100% Pass
  • HSI Final Test Questions with Correct Answers 100% Pass

  • Exam (elaborations) • 40 pages • 2024
  • HSI Final Test Questions with Correct Answers 100% Pass The initial response to a frequency deviation is due to which of the following 1. Load / frequency response 2. AGC 3. Governor action 4. Interchange schedules •3 and 4 •1 and 2 •2 and 3 •1 and 3 - ANSWER-•1 and 3 EMS and AGC have failed at 12:25 and generation must be controlled manually. The operator calculates ACE to be +25 MWs. Load is expected to increase 100 MWs, and imports will increase by 75 MWs at the top of ...
    (0)
  • $12.49
  • + learn more
NERC PREP TEST 101 Questions With 100% Verified Answers
  • NERC PREP TEST 101 Questions With 100% Verified Answers

  • Exam (elaborations) • 61 pages • 2024
  • Available in package deal
  • NERC PREP TEST 101 Questions With 100% Verified Answers 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - ANS-a. Generator MVAR output would increase 2. When system conditions are such that emergency ...
    (0)
  • $20.49
  • + learn more
NERC Test Questions & Answers(Latest Update 2024)
  • NERC Test Questions & Answers(Latest Update 2024)

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • What percentage of load gives a 1 Hz change in an island condition? - ANSWER 6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? - ANSWER Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? - ANSWER Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? - ANSWER All load breakers should be ...
    (0)
  • $11.99
  • + learn more
NERC PREP TEST 101 With Verified Solution (200 Quiz)
  • NERC PREP TEST 101 With Verified Solution (200 Quiz)

  • Exam (elaborations) • 38 pages • 2023
  • Available in package deal
  • NERC PREP TEST 101 With Verified Solution (200 Quiz) 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system a. Generator MVAR output would increase 2. When system conditions are such that emergency procedu...
    (0)
  • $14.99
  • + learn more
My NERC TEST 1| 125 QUESTIONS| WITH COMPLETE SOLUTIONS
  • My NERC TEST 1| 125 QUESTIONS| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 13 pages • 2022
  • Available in package deal
  • A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation plans...
    (0)
  • $10.49
  • + learn more