100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
HSI Final Test Questions with Correct Answers 100% Pass $12.49   Add to cart

Exam (elaborations)

HSI Final Test Questions with Correct Answers 100% Pass

 0 view  0 purchase
  • Course
  • Prep Tests
  • Institution
  • Prep Tests

HSI Final Test Questions with Correct Answers 100% Pass The initial response to a frequency deviation is due to which of the following 1. Load / frequency response 2. AGC 3. Governor action 4. Interchange schedules •3 and 4 •1 and 2 •2 and 3 •1 and 3 - ANSWER-•1 and 3 EMS and A...

[Show more]

Preview 4 out of 40  pages

  • November 11, 2024
  • 40
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Prep Tests
  • Prep Tests
avatar-seller
OliviaWest
Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED




HSI Final Test Questions with Correct

Answers 100% Pass


The initial response to a frequency deviation is due to which of the following


1. Load / frequency response


2. AGC


3. Governor action


4. Interchange schedules




•3 and 4


•1 and 2


•2 and 3


•1 and 3 - ANSWER✔✔-•1 and 3


EMS and AGC have failed at 12:25 and generation must be controlled manually. The operator calculates

ACE to be +25 MWs. Load is expected to increase 100 MWs, and imports will increase by 75 MWs at the

top of the hour. What should the operator do?




•Maintain current generation level



Copyright ©Stuvia International BV 2010-2024 Page 1/40

, Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED


•Decrease generation by 25 MWs


•Decrease generation by 50 MWs


•Increase generation by 25 MW - ANSWER✔✔-•Decrease generation by 25 MWs


How is the Frequency Response Measure (FRM) of a Balancing Authority determined?




•lt is the average of the BA's frequency response for all the frequency deviations of the previous year


•lt is the change in the BA's Net Interchange Actual for the largest frequency deviation during the

previous year


•lt is the previous year's Control Performance Standard 1 ( CPS1 ) score


•It is the median of the BA's frequency response for the frequency deviation events identified by NERC

for the previous year - ANSWER✔✔-•It is the median of the BA's frequency response for the frequency

deviation events identified by NERC for the previous year


Sufficient Operating Reserve is defined as the capacity required to meet what?




•DOE specifications


•CPS and DCS


•CPS 1 & 2 only


•Capacity Standard - ANSWER✔✔-•CPS and DCS




Copyright ©Stuvia International BV 2010-2024 Page 2/40

, Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED


In your Interconnection , a generator tripped that was large enough to reduce the frequency from 60.00

Hz to 59.94 Hz . Your Balancing Authority's Frequency Bias is -200 MW / 0.1 Hz . How many MW would

your system initially contribute to frequency support?




•120 MW


•80 MW


•100 MW


•200 MW - ANSWER✔✔-•120 MW


Interconnection frequency is 59.80 Hz . Your ACE is a large negative value and your AGC is pulsing your

units down . What should you do




•Leave AGC in operation but investigate


•Place AGC in constant frequency control


•Place AGC in flat tie line control


•Suspend AGC and investigate - ANSWER✔✔-•Suspend AGC and investigate


When a Balancing Authority's ACE value is the same sign as the frequency deviation , which NERC control

performance score is affected negatively




•DCS




Copyright ©Stuvia International BV 2010-2024 Page 3/40

, Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED


•CPS 1


•TEC


•BAAL - ANSWER✔✔-•CPS 1


Correct Of the following , which control system would be affected by a difference in Net Actual

Interchange and Net Scheduled Interchange




•Reactive Control


•Turbine Governor Control


•Automatic Generation Control


•Automatic Voltage Regulator - ANSWER✔✔-•Automatic Generation Control


Balancing Authority A is currently reading a system frequency of 59.98 Hz . Its Net Actual Interchange is

+100 MW and its Net Scheduled Interchange is +100 MW . If Balancing Authority A's frequency bias

setting is 100 MW / 0.1 HZ , what is ACE




• -20


•20


•2


•0 - ANSWER✔✔-• -20




Copyright ©Stuvia International BV 2010-2024 Page 4/40

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller OliviaWest. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart