Bicsi - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Bicsi? On this page you'll find 1748 study documents about Bicsi.

Page 3 out of 1.748 results

Sort by

BICSI Installer 2: Fiber Module (Q/A)
  • BICSI Installer 2: Fiber Module (Q/A)

  • Exam (elaborations) • 9 pages • 2023
  • Available in package deal
  • BICSI Installer 2: Fiber Module (Q/A)
    (0)
  • $10.99
  • 1x sold
  • + learn more
BICSI - Installer 1 – Exam Review | 120 Questions | 100% Correct Answers
  • BICSI - Installer 1 – Exam Review | 120 Questions | 100% Correct Answers

  • Exam (elaborations) • 27 pages • 2022
  • B - - - - A third 90-degree bend may be permitted in a conduit run if the run does NOT exceed ______? A 5 m (16.5') B 10 m (33') C 15 m (50') D 30 m (100') C - - - - Which of the following is a property of an electromagnetic field built around a conductor that opposes any changes in current flow in a circuit? A Impedance B Capacitance C Inductance D Resistance A - - - - Which of the following markings is used for non-conductive optical fiber general-purpose cables? A OFNG B OF...
    (2)
  • $10.49
  • 22x sold
  • + learn more
BICSI OSP, Exam Review Questions & Answers, 100% Accurate. VERIFIED.
  • BICSI OSP, Exam Review Questions & Answers, 100% Accurate. VERIFIED.

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • BICSI OSP, Exam Review Questions & Answers, 100% Accurate. VERIFIED. If lead to height ratio is between 1/2 and 3/4 and only 2 or 3 spans the head guy should be_____ than suspension strand. - -One SIze Larger
    (0)
  • $9.49
  • 1x sold
  • + learn more
BICSI Installer 1 Exam Questions with 100% correct Answers
  • BICSI Installer 1 Exam Questions with 100% correct Answers

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • 25-pair color code - ANSWER-White - Blue, orange, green, brown, slate Red - Blue, orange, green, brown, slate Black - Blue, orange, green, brown, slate Yellow - Blue, orange, green, brown, slate Violet - Blue, orange, green, brown, slate Fiber color code - ANSWER-Blue, Orange, Green, Brown, Slate, White, Red, Black, Yellow, Violet, Rose, Aqua NVP - ANSWER-Nominal Velocity of Propagation Insertion loss - ANSWER-The difference in the amount of power received before and after something...
    (0)
  • $10.39
  • 2x sold
  • + learn more
BICSI Installer 2: Fiber Module questions and verified correct answers
  • BICSI Installer 2: Fiber Module questions and verified correct answers

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • Code - correct answer Addresses the safety of persons, property and the environment associated with the ITS cabling Installation NEC - correct answer National electric code Frequency conversion chart - correct answer One thousand hertz = 1KHz One million Kilohertz = 1 MHz One billion Megahertz = 1 GHz NFPA - correct answer National Fire protection association AHJ - correct answer Authorities having jurisdiction TIA/EIA - correct answer - Telecommunications Industry ass...
    (0)
  • $11.99
  • 1x sold
  • + learn more
BICSI OSP Exam questions with correct Answers
  • BICSI OSP Exam questions with correct Answers

  • Exam (elaborations) • 9 pages • 2023
  • BICSI OSP Exam questions with correct Answers
    (0)
  • $11.49
  • 1x sold
  • + learn more
BICSI IN225 7.0, Installer 2, Copper 2017(BICSI IN225, Installer 2, Copper Training 7.0 Workbook and ITSIMM material)
  • BICSI IN225 7.0, Installer 2, Copper 2017(BICSI IN225, Installer 2, Copper Training 7.0 Workbook and ITSIMM material)

  • Exam (elaborations) • 25 pages • 2022
  • BICSI IN225 7.0, Installer 2, Copper 2017(BICSI IN225, Installer 2, Copper Training 7.0 Workbook and ITSIMM material)
    (0)
  • $15.99
  • 1x sold
  • + learn more
BICSI RTPM EXAM QUESTIONS AND ANSWERS
  • BICSI RTPM EXAM QUESTIONS AND ANSWERS

  • Other • 28 pages • 2023
  • design and implementation/installation - Answer- Telecommunications project management (TPM) typically consists of two distinct processes: Design PM Tasks - Answer- Review expression of interest for client Perform a user needs analysis Perform site surveys and meet with client Generate preliminary design submittals Respond to/incorporate client comments Prepare final bid documents/RFP and engineer's cost estimate Issue final RFP package to client Client makes RFP available to po...
    (0)
  • $13.99
  • 1x sold
  • + learn more
BICSI RTPM Study Guide Latest 2023/2024
  • BICSI RTPM Study Guide Latest 2023/2024

  • Exam (elaborations) • 59 pages • 2024
  • Available in package deal
  • BICSI RTPM Study Guide Latest 2023/2024 BICSI RTPM Study Guide Latest 2023/2024 BICSI RTPM Study Guide Latest 2023/2024
    (0)
  • $10.99
  • + learn more