Tie line frequency bias - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Tie line frequency bias? On this page you'll find 208 study documents about Tie line frequency bias.

Page 2 out of 208 results

Sort by

NERC SOS Pre-Assessment questions with correct answers
  • NERC SOS Pre-Assessment questions with correct answers

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • What are three primary AGC control models? CORRECT ANSWER-Tie-Line Bias, Constant Frequency, Constant Net Interchange When a balancing Authority's ACE is zero, what is true? CORRECT ANSWER-The BA load-interchange-generation balancing while supporting Interconnection Frequency In a 3-phase AC generator... CORRECT ANSWER-Each phase is physically offset by 120 degrees Inductance is a property of an electric circuit that opposes the change in ___ CORRECT ANSWER-current What three values...
    (0)
  • $13.49
  • + learn more
PJM Test Questions & Correct Answers | Latest  Update |Already Graded A+
  • PJM Test Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 52 pages • 2024
  • Which of the following balancing control modes is used by PJM under normal operations? : Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? : Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability : Dynamic Instability If PJM experienced an event that caused the loss of a 1,000 MW generato...
    (0)
  • $13.49
  • + learn more
NERC text 130 questions with complete solutions Graded A+
  • NERC text 130 questions with complete solutions Graded A+

  • Exam (elaborations) • 33 pages • 2023
  • Available in package deal
  • NERC text 130 questions with complete solutions Graded A+ Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads -AnswerD. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a single control area B. Proving regulation service for neighboring RSGs C. Ensuring each control area in the group maintains 50% blackstart capability ...
    (0)
  • $9.49
  • + learn more
Sos Nerc Prep - Reliability Exam With 100 Questions with Correct Answers.
  • Sos Nerc Prep - Reliability Exam With 100 Questions with Correct Answers.

  • Exam (elaborations) • 54 pages • 2023
  • Sos Nerc Prep - Reliability Exam With 100 Questions with Correct Answers. The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decreas...
    (0)
  • $12.99
  • + learn more
PJM Test Prep | 200 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 33 Pages
  • PJM Test Prep | 200 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 33 Pages

  • Exam (elaborations) • 33 pages • 2023
  • Available in package deal
  • Which of the following balancing control modes is used by PJM under normal operations? - Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? - Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability - Dynamic Instability If PJM experienced an event that caused the loss of a 1,000 MW generator, whic...
    (0)
  • $20.49
  • + learn more
PJM Test Questions & Answers 2024
  • PJM Test Questions & Answers 2024

  • Exam (elaborations) • 33 pages • 2024
  • Available in package deal
  • PJM Test Questions & Answers 2024 Which of the following balancing control modes is used by PJM under normal operations? - ANSWER-Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? - ANSWER-Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability - ANSWER-Dynamic Instability If PJM exper...
    (0)
  • $10.99
  • + learn more
NERC RC TEST 64 QUESTIONS WITH COMPLETE SOLUTIONS
  • NERC RC TEST 64 QUESTIONS WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 4 pages • 2022
  • Available in package deal
  • System studies identify what correct answer: Predict operations and identify constraints If ACE remains the same and frequency goes up what has happened? correct answer: Someone lost load When a generator has its AVR in service it is a? correct answer: Dynamic source of reactive power Black start resource testing is done every? correct answer: 3 years Each BA shall operate its AGC on? correct answer: Tie line Frequency Bias When is voltage reduction reportable? correct answer...
    (0)
  • $5.49
  • 1x sold
  • + learn more
NERC Exam Study Guide  601 Questions With Correct Answers
  • NERC Exam Study Guide 601 Questions With Correct Answers

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • What is the ACE equation? - Answer (NIa-NIs)-10B(Fa-Fs) What effect does an internal loss of load have on frequency and ACE? - Answer Frequency increases, ACE increases What effect does an external loss of load have on frequency and ACE? - Answer Frequency increases, No change in ACE What happens to your frequency, ACE value, and Tie-line flow when you experience a loss of generation external to your area? - Answer Frequency drops, No change in ACE, Tie-line flows increase out of your s...
    (0)
  • $11.49
  • + learn more
PJM Test Questions with 100% Correct Answers Latest Update 2024/ Verified
  • PJM Test Questions with 100% Correct Answers Latest Update 2024/ Verified

  • Exam (elaborations) • 33 pages • 2024
  • Available in package deal
  • PJM Test Questions with 100% Correct Answers Latest Update 2024/ Verified Which of the following balancing control modes is used by PJM under normal operations? - Correct Answer Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? - Correct Answer Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Inst...
    (0)
  • $10.99
  • + learn more
SOS NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST 2023-2024
  • SOS NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST 2023-2024

  • Exam (elaborations) • 69 pages • 2023
  • Available in package deal
  • Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties, actual frequency, and all __________. A) Tie lines readings B) Generators output C) Scheduled frequency indications SOS NERC RELIABILITY EXAM QUESTIONS & ANSWERS LATEST GRADED A+ D) Transformer load - A) Tie lines readings Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If Balancing Authority...
    (0)
  • $16.49
  • + learn more