[Show more]An EXCITER on a traditional generator does what? - Voltage regulation (AVR) if you change the 
excitation current, you change the voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - Limits 
When synchronizing to the interconnection, what needs to be synchronized? - Frequency,...
Preview 2 out of 6 pages
Add to cartAn EXCITER on a traditional generator does what? - Voltage regulation (AVR) if you change the 
excitation current, you change the voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - Limits 
When synchronizing to the interconnection, what needs to be synchronized? - Frequency,...
Real time transmission constraints or contingencies may be alleviated with generators operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) - D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. system...
Preview 2 out of 10 pages
Add to cartReal time transmission constraints or contingencies may be alleviated with generators operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) - D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. system...
Control center facilities must have a minimum of how many days of fuel for the backup generator? - 
5 days 
If PJM ACE shows overgeneration, actual imports are: - Less than scheduled 
Who should a generator contact at PJM to clear an outage ticket? - Master Coordinator 
To correct for a slow or fast...
Preview 2 out of 7 pages
Add to cartControl center facilities must have a minimum of how many days of fuel for the backup generator? - 
5 days 
If PJM ACE shows overgeneration, actual imports are: - Less than scheduled 
Who should a generator contact at PJM to clear an outage ticket? - Master Coordinator 
To correct for a slow or fast...
2x sold
PJM Generator Exam | 60 Questions with 100% Correct Answers | Verified | Latest Update 2024
Preview 2 out of 6 pages
Add to cartPJM Generator Exam | 60 Questions with 100% Correct Answers | Verified | Latest Update 2024
Which of the following statements is correct concerning PJM assuming frequency control of the 
restoration process? 
A) PJM assumes control once an external transmission tie has been established. 
B) Once an Area Control Error can be calculated, PJM will assume control. 
C) Whenever it becomes too m...
Preview 4 out of 61 pages
Add to cartWhich of the following statements is correct concerning PJM assuming frequency control of the 
restoration process? 
A) PJM assumes control once an external transmission tie has been established. 
B) Once an Area Control Error can be calculated, PJM will assume control. 
C) Whenever it becomes too m...
Which of the following balancing control modes is used by PJM under normal operations? - Tie-Line 
Bias 
Which of the following influences does PJM consider when performing their system load forecast? - 
Weather Conditions & Day of the Week 
All of the following are limits that must be submitted to ...
Preview 4 out of 33 pages
Add to cartWhich of the following balancing control modes is used by PJM under normal operations? - Tie-Line 
Bias 
Which of the following influences does PJM consider when performing their system load forecast? - 
Weather Conditions & Day of the Week 
All of the following are limits that must be submitted to ...
Real time transmission constraints or contingencies may be alleviated with generators 
operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of 
merit). - off cost (out of merit) 
What is the minimum size for a solar park to be required to have real and...
Preview 2 out of 6 pages
Add to cartReal time transmission constraints or contingencies may be alleviated with generators 
operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of 
merit). - off cost (out of merit) 
What is the minimum size for a solar park to be required to have real and...
Real time transmission constraints or contingencies may be alleviated with generators operating 
______________ - off cost out of merit. 
Monitoring ___________ may give insights into system constraints. - Monitoring LMP's 
PJM calls for _____________ reserves to recover ace so that tie line schedu...
Preview 2 out of 15 pages
Add to cartReal time transmission constraints or contingencies may be alleviated with generators operating 
______________ - off cost out of merit. 
Monitoring ___________ may give insights into system constraints. - Monitoring LMP's 
PJM calls for _____________ reserves to recover ace so that tie line schedu...
When is Manual Load Dump Warning issued? - available primary reserve capacity is less than the 
largest operating generator or the loss of a transmission facility jeopardizes reliable operations after all 
other possible measures are taken to increase reserve 
Why is a Voltage Reduction used? - PJM ...
Preview 2 out of 5 pages
Add to cartWhen is Manual Load Dump Warning issued? - available primary reserve capacity is less than the 
largest operating generator or the loss of a transmission facility jeopardizes reliable operations after all 
other possible measures are taken to increase reserve 
Why is a Voltage Reduction used? - PJM ...
1x sold
During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - 500 to 550 kV 
When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (G...
Preview 3 out of 30 pages
Add to cartDuring System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - 500 to 550 kV 
When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (G...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller Preach. Stuvia facilitates payment to the seller.
No, you only buy these notes for $40.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
77858 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now