Swppp stormwater epa - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Swppp stormwater epa? On this page you'll find 25 study documents about Swppp stormwater epa.
Page 2 out of 25 results
Sort by
-
CESSWI Certification - PART 1 Questions and Answers 2023
- Exam (elaborations) • 29 pages • 2023
- Available in package deal
-
- $19.99
- + learn more
CESSWI Certification - PART 1 Questions and Answers 2023 
CESSWI Certification 
Identifies Professional with a comprehensive knowledge and understanding of erosion, sediment and stormwater regulations. 
 
 
 
Certified inspectors 
Recognized by state and federal regulators as qualified professionals in their fields 
 
 
 
NPDES 
National Pollutant Discharge Elimination System 
 
 
 
Regulations Governing Erosion and Sediment Control and Stormwater 
The Clean Water Act (CWA) 
National Pollutant D...
-
CEPSCI PRACTICE TEST Exam Questions With 100% Verified Answers
- Exam (elaborations) • 11 pages • 2024
-
- $11.49
- + learn more
CEPSCI PRACTICE TEST Exam Questions 
With 100% Verified Answers 
1972 clean water act - answerAdministered by the US environmental protection agency 
(EPA) Created the NPDES 
1987 - answerAmendment to CWA CALLED WATER QUALITY ACT 
NPDES in south carolina - answerSouth Carolina is NPDES delegated state. 
NPDES regulations are administered by - answerSCDHEC 
CGP authorizes - answerstormwater discharges from construction sites 
Who must obtain NPDES coverage - answerland disturbing activities great...
-
CESSWI - General Principles questions and answers(already passed)
- Exam (elaborations) • 11 pages • 2024
-
- $14.99
- + learn more
401 
Section ___ of the Clean Water Act requires that any applicant for a federal permit to conduct 
any activity, including the construction or operation of a facility that may result in the discharge of any 
pollutant, must obtain certification of those activities from the state in which the discharge originates. 
This is known as the Water Quality Certification for a project. 
 
 
 
402 
The 1972 amendments to the Federal Water Pollution Control Act established the National 
Pollutant Dischar...
-
CPSWQ Section 2: US Rules and Regulations Exam Questions And Answers
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $8.39
- + learn more
What are examples of priority pollutants? - ANS Nutrients, pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons, and oxygen-adsorbing substances. 
 
When was the Federal Water Pollution Control Act established? - ANS 1948 (prior to CWA). 
 
When was the Clean Water Act (CWA) established? - ANS 1972 - established NPDES permit. 
 
When was the CWA amended? - ANS 1987. 
 
What did 1972 amendments focus on? - ANS Industrial process waste...
-
CPSWQ Updated Exam Questions And Answers
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $9.89
- + learn more
Cornerstone Fundamental Principles - ANS Integrity 
Objectivity 
Confidentiality 
Competence 
Professionalism 
 
When was Phase II established and when did permits begin? - ANS Established in 1999 and permits began in 2003. 
 
6 Minimum control measures and what are they for? - ANS SWMPs (Stormwater management programs) 
-Public Outreach 
-Public involvement and participation 
-Illicit Discharge Detection and elimination 
-Construction stormwater runoff control 
-Post Con...
Make study stress less painful
-
SPD – SWPPP Questions And Answers 100% Correct!
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
What's Federal Requirement for stormwater runoff from construction site - ANSWERSany activities disturb one acre or more, including a smaller site in the larger common plan of development or sale, to obtain permits under a National Pollutant Discharge Elimination System (NPDES), which authorized by states or EPA. 
 
What construction activities don't require NPDES permit coverage - ANSWERS- Construction activities that don't disturb land 
 
- routine maintenance, such as landscaping, road mai...
-
CPESC Section 1 & 2 Questions and Answers 2023
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- $17.99
- + learn more
CPESC Section 1 & 2 Questions and Answers 2023 
What does the acronym NPDES stand for? 
National Pollutant Discharge Elimination System 
 
 
 
True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a municipal separate storm drain system, to waters of the US. 
2.1.1.6 
True 
 
 
 
What does the acronym TMDL stand for? Define it? 
2.1.1.10 
Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily ba...
-
CEPSCI PRACTICE TEST Exam Questions With 100% Verified Answers
- Exam (elaborations) • 11 pages • 2024
-
- $12.49
- + learn more
CEPSCI PRACTICE TEST Exam Questions 
With 100% Verified Answers 
1972 clean water act - answerAdministered by the US environmental protection agency 
(EPA) Created the NPDES 
1987 - answerAmendment to CWA CALLED WATER QUALITY ACT 
NPDES in south carolina - answerSouth Carolina is NPDES delegated state. 
NPDES regulations are administered by - answerSCDHEC 
CGP authorizes - answerstormwater discharges from construction sites 
Who must obtain NPDES coverage - answerland disturbing activities great...
-
CEPSCI PRACTICE TEST WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 18 pages • 2023
- Available in package deal
-
- $12.99
- + learn more
1972 clean water act correct answer: Administered by the US environmental protection agency (EPA) Created the NPDES 
 
1987 correct answer: Amendment to CWA CALLED WATER QUALITY ACT 
 
NPDES in south carolina correct answer: South Carolina is NPDES delegated state. 
 
NPDES regulations are administered by correct answer: SCDHEC 
 
CGP authorizes correct answer: stormwater discharges from construction sites 
 
Who must obtain NPDES coverage correct answer: land disturbing activities greater...
-
Cesswi Questions and Answers 2023
- Exam (elaborations) • 4 pages • 2023
- Available in package deal
-
- $14.99
- + learn more
Cesswi Questions and Answers 2023 
Certified erosion sediment and stormwater inspector 
CESSWI 
 
 
 
Offers no mitigation 
Ignorance 
 
 
 
Controls water pollution by regulating point sources that discharge pollutants into waters of the US 
NPDES National pollutant discharge elimination system 
 
 
 
MS4 
Municipal Separate Storm Sewer System 
 
 
 
ESCP 
Erosion and sediment control plan 
 
 
 
Has regulatory authority over the cwa 
EPA 
 
 
 
Return flow from irrigated agriculture or their r...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia