100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CESSWI - General Principles questions and answers(already passed) $14.99   Add to cart

Exam (elaborations)

CESSWI - General Principles questions and answers(already passed)

 4 views  0 purchase
  • Course
  • CESSWI Reading Material
  • Institution
  • CESSWI Reading Material

401 Section ___ of the Clean Water Act requires that any applicant for a federal permit to conduct any activity, including the construction or operation of a facility that may result in the discharge of any pollutant, must obtain certification of those activities from the state in which the disc...

[Show more]

Preview 2 out of 11  pages

  • September 6, 2024
  • 11
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CESSWI Reading Material
  • CESSWI Reading Material
avatar-seller
BRAINBOOSTERS
CESSWI - General
Principles questions
and answers(already
passed)
401 - answer Section ___ of the Clean Water Act requires that any
applicant for a federal permit to conduct
any activity, including the construction or operation of a facility that
may result in the discharge of any
pollutant, must obtain certification of those activities from the state
in which the discharge originates.
This is known as the Water Quality Certification for a project.


402 - answer The 1972 amendments to the Federal Water Pollution
Control Act established the National
Pollutant Discharge Elimination System (NPDES) permit program to
control discharges of pollutants from
point sources, which focused on industrial process wastewater and
municipal sewage, and emphasized
technology-based controls. As process and publicly owned
treatment works (POTW) discharges were
brought increasingly under control, stormwater discharges
containing pollutants became the focus of
greater attention. These regulations are generally referred to as
Section ___, NPDES regulations.

, 404 - answer Section ___ of the Clean Water Act established a permit
program to regulate the discharge of
dredged or fill material into waters of the United States. The
program's scope also includes the regulation
of discharges of dredged or fill material onto wetlands adjacent to
national waters. This permit program
is administered by the Secretary of the Army through the U.S. Army
Corps of Engineers.


Phase 1 - answer Facilities already covered by an NPDES permit for
stormwater;
Facilities that engage in industrial activity (including heavy
manufacturing facilities, large
construction sites and transportation facilities, among others)
Large (>250,000 population) municipal separate storm drain
systems;
Medium (100,000> population <250,000) municipal separate storm
drain systems;
Facilities that the EPA administrator determines to have
stormwater discharges contributing
to a violation of water quality, or that are "significant contributors"
of pollutants to waters of
the United States.


Phase 2 - answer Small Industrial Facilities
Small (<5 acres) construction sites
Small (<100,000 population) MS4's


Waters of the United States - answer 1. All waters that are currently
used, were used in the past, or may be susceptible to use in
interstate or foreign commerce, including all waters that are subject
to the ebb and flow of the tide;

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller BRAINBOOSTERS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78252 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.99
  • (0)
  Add to cart