C857 Software Quality Assurance Pre Assessment (C857)

Western Governors University

Here are the best resources to pass C857 Software Quality Assurance Pre Assessment (C857). Find C857 Software Quality Assurance Pre Assessment (C857) study guides, notes, assignments, and much more.

All 19 results

Sort by

Western Governors University C 857 / C857 Software Quality Assurance - Study Guide
  • Western Governors University C 857 / C857 Software Quality Assurance - Study Guide

  • Exam (elaborations) • 8 pages • 2023
  • Western Governors University C 857 / C857 Software Quality Assurance - Study Guide •Detect defects. •Remove defects as close to the point of insertion as possible. •Determine product progress/status. •Identify potential improvements. •Produce technical work of a more uniform and predictable quality. •Assist employees with cross-training. •Reduce costs to build and maintain better products. •Reduce development time. •Reduce testing cost and time. •Reduce total sy...
    (0)
  • $10.49
  • + learn more
C857: True/False Quiz Questions & Answers, 100% Accurate. VERIFIED.
  • C857: True/False Quiz Questions & Answers, 100% Accurate. VERIFIED.

  • Exam (elaborations) • 3 pages • 2023
  • Available in package deal
  • C857: True/False Quiz Questions & Answers, 100% Accurate. VERIFIED. True or False: System validation is an end-to-end process that ensures that the completed and integrated system will operate as needed in the environment for which it was intended? - -True True or False: Process improvements helps software development build and retain product and service quality. - -True True or False: Bugs that are found and fixed early in the process will cost more to fix when compared to finding th...
    (0)
  • $8.49
  • + learn more
Software Quality Assurance - C857 Questions & Answers. 100% Accurate. Rated A+
  • Software Quality Assurance - C857 Questions & Answers. 100% Accurate. Rated A+

  • Exam (elaborations) • 53 pages • 2023
  • Available in package deal
  • Software Quality Assurance - C857 Questions & Answers. 100% Accurate. Rated A+ Select the deductive debugging process steps from the lists. Use elimination process Prove remaining hypothesis Enumerate possible causes Refine remaining hypothesis Collect more data Fix the error - -Enumerate possible causes Use elimination process Refine remaining hypothesis Prove remaining hypothesis Fix the error Collect more data Indicate if the following statements about module testing ...
    (0)
  • $12.49
  • + learn more
Software Quality Assurance - C857 Questions & Accurate Answers. Rated A+
  • Software Quality Assurance - C857 Questions & Accurate Answers. Rated A+

  • Exam (elaborations) • 9 pages • 2023
  • Available in package deal
  • Software Quality Assurance - C857 Questions & Accurate Answers. Rated A+ A bug base is a system for keeping track of every bug logged in a database system. Most important consideration when deciding on a bug base is simple so users can easily report bugs - - A test case management system is the best way to document and keep track of test cases! Test cases are supplemented by applying black-box methods to the module's specification. - -The most important consideration in program testing ...
    (0)
  • $8.49
  • + learn more
Software Quality Assurance (C857), Exam Questions & Answers, Rated A+
  • Software Quality Assurance (C857), Exam Questions & Answers, Rated A+

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • Software Quality Assurance (C857), Exam Questions & Answers, Rated A+ What makes a test run successful? - -A test that discovers a new error User-based testing requires the user to know the inner workings of a program. - -False True or False: Jakob Nielsen's usability research depicts that incurring extra cost and complexity of working with many testers for an application check is not required. - -True Which step in the software development process defines the exact representation...
    (0)
  • $10.49
  • + learn more
C857 - Software QA, Top Questions and answers, 100% Accurate. Rated A+
  • C857 - Software QA, Top Questions and answers, 100% Accurate. Rated A+

  • Exam (elaborations) • 14 pages • 2023
  • Available in package deal
  • C857 - Software QA, Top Questions and answers, 100% Accurate. Rated A+ What is a dangling reference? - A reference to an object that no longer exists. What is stack overflow? - A stack overflow is an undesirable condition in which a particular computer program tries to use more memory space than the call stack has available. What is a bit string? - A bit string is a sequence of bits. Occurs when a variable has an unset or uninitialized value. - Data reference error. Comes when c...
    (0)
  • $10.49
  • + learn more
Software Quality Assurance - C857 Questions. 100% Accurate answers. VERIFIED.
  • Software Quality Assurance - C857 Questions. 100% Accurate answers. VERIFIED.

  • Exam (elaborations) • 53 pages • 2023
  • Available in package deal
  • Software Quality Assurance - C857 Questions. 100% Accurate answers. VERIFIED. Select the deductive debugging process steps from the lists. Use elimination process Prove remaining hypothesis Enumerate possible causes Refine remaining hypothesis Collect more data Fix the error - -Enumerate possible causes Use elimination process Refine remaining hypothesis Prove remaining hypothesis Fix the error Collect more data Indicate if the following statements about module testing i...
    (0)
  • $11.49
  • + learn more
C857 Software Quality Assurance – CMMI, Exam Questions and answers, rated A+.
  • C857 Software Quality Assurance – CMMI, Exam Questions and answers, rated A+.

  • Exam (elaborations) • 9 pages • 2023
  • Available in package deal
  • C857 Software Quality Assurance – CMMI, Exam Questions and answers, rated A+. anomaly - -A(n) ____________ is any condition that deviates from expectations based on requirements specifications, design documents, standards, plans, and so on, or from someone's experiences. These ________________ are most often called defects. review - -A(n) _____________ is an evaluation of a life-cycle work product or project status to determine if there are any deviations from planned results and to ...
    (0)
  • $9.49
  • + learn more
WGU C857 Software Quality Assurance, Overview. Exam Review, 100% Accurate. Rated A+
  • WGU C857 Software Quality Assurance, Overview. Exam Review, 100% Accurate. Rated A+

  • Exam (elaborations) • 26 pages • 2023
  • Available in package deal
  • WGU C857 Software Quality Assurance, Overview. Exam Review, 100% Accurate. Rated A+ Less costly - -Finding and fixing bugs early in the development process rather than finding and fixing bugs all at once near the end of a project is more or less costly? [Best Practices, Lesson 1: Process Improvement] Having clearly defined goals for every milestone - -What key best practice bring the development process together in order to meet the deliverable deadline? [Best Practices, Lesson 1: ...
    (0)
  • $11.49
  • + learn more
C857 Quizzes and Pre Assessment Questions - ALL OF THEM IN ONE PLACE. 100% Accurate. VERIFIED.
  • C857 Quizzes and Pre Assessment Questions - ALL OF THEM IN ONE PLACE. 100% Accurate. VERIFIED.

  • Exam (elaborations) • 44 pages • 2023
  • Available in package deal
  • C857 Quizzes and Pre Assessment Questions - ALL OF THEM IN ONE PLACE. 100% Accurate. VERIFIED. What does the specification for a module typically define? A - Input True or False: Bugs that are found and fixed early in the process will cost more to fix when compared to finding them later and fixing all the bugs at once? False When is the appropriate time to include the people responsible in the development cycle? A - When formal testing begins B - When requirements are form...
    (0)
  • $11.49
  • + learn more