ACQ 1010
National Defense University
Page 3 out of 29 results
Sort by
-
ACQ 1010 Module 8 Exam_Test and Evaluation Overview
- Exam (elaborations) • 1 pages • 2022
- Available in package deal
-
- $9.49
- + learn more
ACQ 1010 MODULE 8 EXAM: TEST AND EVALUATION OVERVIEW 
The Test and Evaluation Master Plan (TEMP) must be developed prior to which of the 
following? 
Answer: Milestone A and updated before each subsequent review 
Test and Evaluation (T&E) is used to identify technical risk, verify performance, and 
validate system utility throughout the defense system acquisition life cycle. 
Answer: True 
Which type of test supports the systems engineering process by measuring the technical 
performance against...
-
ACQ 1010 Module 5 Exam_Financial Management
- Exam (elaborations) • 2 pages • 2022
- Available in package deal
-
- $8.49
- + learn more
ACQ 1010 MODULE 5 EXAM: FINANCIAL MANAGEMENT 
Below Threshold Reprogramming for procurement is limited to the lesser of $20 million 
or 20%, into or out of a program. Thresholds vary by appropriations category. 
Incorrect Answer: True 
Approval for reprogramming must always involve Congress. 
Incorrect Answer: True 
Which major appropriations category below is NOT included in the Life Cycle Cost 
Estimate? 
Answer: Investment 
Select the term that best fits the following definition: “The legal...
-
ACQ 1010 Module 6 Exam_Contract Management.
- Exam (elaborations) • 1 pages • 2022
- Available in package deal
-
- $9.49
- + learn more
ACQ 1010 MODULE 6 EXAM: CONTRACT MANAGEMENT 
What is one purpose of contract administration? 
Answer: Avoiding or eliminating overlap and duplication of Government contract administration effort 
Which of the following describes an Indefinite-Quantity contract? 
Answer: Provides an indefinite quantity, within stated limits, of supplies or services to be furnished during a fixed 
period, within stated limits 
Who oversees the source selection process and selects the source whose proposal is 
the ...
-
ACQ 1010 Module 4 Exam_Resource Allocation Process.
- Exam (elaborations) • 2 pages • 2022
- Available in package deal
-
- $9.49
- + learn more
ACQ 1010 MODULE 4 EXAM: RESOURCE ALLOCATION PROCESS 
Each phase of the Planning, Programming, Budgeting, and Execution (PPBE) process 
answers a different question. Which of the following questions does the Programming 
Phase answer? 
Answer: How much defense can we afford? 
Who can approve the realignment of funds between activities that are below the level of 
control for that appropriation category and that does not require a reprogramming 
action? 
Incorrect Answer: Congress 
Which of the fo...
-
ACQ 1010 Module 3 Exam_Defense Acquisition System
- Exam (elaborations) • 3 pages • 2022
- Available in package deal
-
- $9.49
- 2x sold
- + learn more
ACQ 1010 MODULE 3 EXAM: DEFENSE ACQUISITION SYSTEM 
What decision authorizes entry into the Production and Deployment phase? 
Answer: Milestone C decision 
Before a project enters the TMRR phase, the AoA must be completed and the Acquisition 
Strategy (AS) is approved by the MDA. 
Answer: True 
The Acquisition Strategy (AS) is: 
Answer: Prepared by the Program Manager (PM) during the Materiel Solution Analysis Phase (MSA) and is submitted 
to the Milestone Decision Authority (MDA) at Milestone A...
Fear of missing out? Then don’t!
-
ACQ 1010 MODULE 2 EXAM: JOINT CAPABILITIES INTEGRATION AND DEVELOPMENT SYSTEM
- Exam (elaborations) • 1 pages • 2022
- Available in package deal
-
- $7.49
- + learn more
Assuring that material approaches are refined and key technologies are being matured, 
what JCIDS document is used to build upon the Initial Capabilities Document (ICD)? 
Answer: Capability Development Document (CDD) 
What is the purpose of a Capabilities Based-Assessment (CBA)? 
Answer: To analyze the military's capability needs and gaps and recommend both materiel and non-materiel solutions 
The primary objective of the Joint Capabilities Integration and Development System 
(JCIDS) is to ensu...
-
ACQ 1010 Fundamentals of Systems Acquisition Management Module 2
- Exam (elaborations) • 57 pages • 2022
-
- $8.49
- + learn more
ACQ 1010 Fundamentals of 
Systems Acquisition 
Management 
Module 2
-
ACQI0I0 Fundamentals of Systems Acquisition Management
- Exam (elaborations) • 164 pages • 2022
-
- $10.49
- + learn more
ACQI0I0 Fundamentals of Systems Acquisition Management 
Lesson 3.1 - Defense Acquisition System Overview 
Lesson Introduction 
Welcome [FIRST NAME] to the Defense Acquisition System Overview 
lesson. 
Industry conducts most of the development and acquisition programs 
production under contract to the Government. 
This lesson provides insight into policies and principles that govern 
the defense acquisit on system and the phases that form the 
foundation for all DoD programs. 
After completing th...
-
Defense Acquisition University ACQ 1010_MOD 4.
- Exam (elaborations) • 42 pages • 2022
-
- $9.99
- + learn more
All resources for DoD activities, whether for weapons, information systems, people, buildings, or operating 
and support costs, are provided through the resource allocat ion process. 
Select each of the process phases to learn more. 
Resource Allocation Phase 1 Phase 2 Phase 3 Phase 4 
The four phases of the Resource Allocation process are: 
• Phase 1: Planning, Programming, Budgeting, and Execution (PPBE) Process 
• Phase 2: Enactment Process 
• Phase 3: Apportionment Pr ocess 
• Phase ...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia