BUS 660 (BUS660)

Grand Canyon University

Here are the best resources to pass BUS 660 (BUS660). Find BUS 660 (BUS660) study guides, notes, assignments, and much more.

Page 3 out of 238 results

Sort by

BUS 660 Topic 7 Assignment; Benchmark - Data Analysis Case Study
  • BUS 660 Topic 7 Assignment; Benchmark - Data Analysis Case Study

  • Other • 5 pages • 2023
  • BUS 660 Topic 7 Assignment; Benchmark - Data Analysis Case Study
    (0)
  • $16.49
  • + learn more
BUS 660 Topic 7 Assignment; Benchmark - Data Analysis Case Study (Managerial Report).docx
  • BUS 660 Topic 7 Assignment; Benchmark - Data Analysis Case Study (Managerial Report).docx

  • Other • 5 pages • 2023
  • BUS 660 Topic 7 Assignment; Benchmark - Data Analysis Case Study (Managerial Report).docx
    (0)
  • $15.49
  • + learn more
BUS 660 Topic 6 Integer Linear Programming and Advanced Optimization Applications - Homework (v2).docx
  • BUS 660 Topic 6 Integer Linear Programming and Advanced Optimization Applications - Homework (v2).docx

  • Other • 16 pages • 2023
  • BUS 660 Topic 6 Integer Linear Programming and Advanced Optimization Applications - Homework (v2).docx
    (0)
  • $16.49
  • + learn more
BUS 660 Topic 6 Integer Linear Programming and Advanced Optimization Applications - Homework (v1).docx
  • BUS 660 Topic 6 Integer Linear Programming and Advanced Optimization Applications - Homework (v1).docx

  • Other • 10 pages • 2023
  • Problem 11-13: The Martin-Beck Company operates a plant in St. Louis with an annual capacity of 30,000 units. Product is shipped to regional distribution centers located in Boston, Atlanta, and Houston. Because of an anticipated increase in demand, Martin-Beck plans to increase capacity by constructing a new plant in one or more of the following cities: Detroit, Toledo, Denver, or Kansas City. The estimated annual fixed cost and the annual capacity for the four proposed plants are as follows: T...
    (0)
  • $21.49
  • + learn more
BUS 660 Topic 6 DQ 2
BUS 660 Topic 6 DQ 1
BUS 660 Topic 6 DQ 1, DQ 2
  • BUS 660 Topic 6 DQ 1, DQ 2

  • Other • 4 pages • 2023
  • Available in package deal
  • BUS 660 Topic 6 DQ 1, DQ 2
    (0)
  • $18.49
  • + learn more
BUS 660 Topic 6 DQ 1, DQ 2 & Participation
  • BUS 660 Topic 6 DQ 1, DQ 2 & Participation

  • Other • 4 pages • 2023
  • Available in package deal
  • BUS 660 Topic 6 DQ 1, DQ 2 & Participation
    (0)
  • $18.49
  • + learn more
BUS 660 Topic 5 Linear Programming Distribution and Network Models - Homework
  • BUS 660 Topic 5 Linear Programming Distribution and Network Models - Homework

  • Other • 20 pages • 2023
  • Problem 10-05: Premier Consulting’s two consultants, Avery and Baker, can be scheduled to work for clients up to a maximum of 160 hours each over the next four weeks. A third consultant, Campbell, has some administrative assignments already planned and is available for clients up to a maximum of 140 hours over the next four weeks. The company has four clients with projects in process. The estimated hourly requirements for each of the clients over the four-week period are as follows: Hourly ra...
    (0)
  • $18.49
  • + learn more
BUS 660 Topic 5 DQ 2