100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NCCCO tower crane Questions With Complete Solutions(Guaranteed Success) $10.99   Add to cart

Exam (elaborations)

NCCCO tower crane Questions With Complete Solutions(Guaranteed Success)

 7 views  0 purchase
  • Course
  • NCCCO Crane
  • Institution
  • NCCCO Crane

NCCCO tower crane Questions With Complete Solutions(Guaranteed Success) Splices in rall tracks shall have - correct answer...Smooth Joints Hydraulic systems should have their proper fluid level checked - correct answer...Daily If power fails during operations, the following shouldn't apply...

[Show more]

Preview 2 out of 12  pages

  • August 23, 2024
  • 12
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NCCCO Crane
  • NCCCO Crane
avatar-seller
agradesolutions
NCCCO tower crane Questions With
Complete Solutions(Guaranteed
Success)
Splices in rall tracks shall have - correct answer...✔✔Smooth Joints

Hydraulic systems should have their proper fluid level checked - correct answer...✔✔
Daily

If power fails during operations, the following shouldn't apply - correct answer...✔✔Do
your best to finish moving load where it was designated to go

If load is undetermined who is to find out if load weight does not exceed crane rating at
radius at which the load is to be lifted - correct answer...✔✔Person responsible for lift

Where should climbing instructions be kept - correct answer...✔✔ON Site

All climbing operations shall be performed under the supervision of - correct answer...✔
✔Qualified person

When cranes are erected, load limiting devices shall be tested for proper setting and
operation - correct answer...✔✔Before crane is placed in service

Hooks shall be equipped with latches unless the application makes the use of the latch -
correct answer...✔✔Impractical

Size and position of signs or panels must satisfy the limitations of - correct answer...✔
✔Manufacturer

Fall prevention measures are needed for working at locations where you are exposed -
correct answer...✔✔To a fall of 6ft or more

Travel distance on hand levers shall not be greater - correct answer...✔✔than 14
inches from neutral position

For power lines rated 175KV the minimum clearance between the lines and any part of
the crane or load is - correct answer...✔✔15ft

All controls shall be tested by the operator at the - correct answer...✔✔start of new shift




AGRADESOLUTIONS

, Before each climbing operation all load members of the support system shall be -
correct answer...✔✔Inspected

Chain slings are required to be - correct answer...✔✔ID tagged

Welding on loads suspended by the crane can only be done if the load has - correct
answer...✔✔Insulated slings

How much does an average cubic yard of concrete weight - correct answer...✔✔4,000
lbs

Main power switch for tower crane is - correct answer...✔✔At base of crane

Items not listed in the frequent inspection checklist are - correct answer...✔✔Hydraulic
pumps and valves for excessive wear or damage

When is it necessary to determine that there is no practical alternative way to perform
the needed work or to gain access to the area - correct answer...✔✔Personnel Lift

Each series of voice signals shall contain three elements stated in the following order -
correct answer...✔✔Function and Direction - Distance and speed - Function stop

When lifting personnel communication shall be maintained between three of the next
four - correct answer...✔✔Person(s) being lifted - Operator - Signal person

The condition when the tower load block or hook assembly comes in contact with the
upper - correct answer...✔✔Two-blocking

Load bearing members of the climbing and support system shall be inspected before
each - correct answer...✔✔Climbing operation

Where shall a wind velocity indicating device be mounted - correct answer...✔✔At or
near the top of crane

A velocity readout shall be provided - correct answer...✔✔At the operators station

The area inside the self erecting tower cranes tail swing must be - correct answer...✔✔
Barricaded

The self erecting tower crane must be properly grounded according with the - correct
answer...✔✔National electric code (NEC)

Self Erecting tower crane erection must be performed by - correct answer...✔✔
Qualified person



AGRADESOLUTIONS

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller agradesolutions. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart