Package deal
NCCCO tower cranes Questions And Answers(Guaranteed Sucess)Best Price!!!
NCCCO tower cranes Questions And Answers(Guaranteed Sucess)Best Price!!
[Show more]NCCCO tower cranes Questions And Answers(Guaranteed Sucess)Best Price!!
[Show more]NCCCO tower crane Questions With 100%Verified AnswersA+GRADED 
	 
Splices in rall tracks shall have - correct answer...Smooth Joints 
 
Hydraulic systems should have their proper fluid level checked - correct answer...Daily 
 
If power fails during operations, the following shouldn't apply - correc...
Preview 2 out of 12 pages
Add to cartNCCCO tower crane Questions With 100%Verified AnswersA+GRADED 
	 
Splices in rall tracks shall have - correct answer...Smooth Joints 
 
Hydraulic systems should have their proper fluid level checked - correct answer...Daily 
 
If power fails during operations, the following shouldn't apply - correc...
Tower Crane Sample Questions With Complete Solutions(100% Pass!!!!) 
 
Which OSHA regulation governs suspended personnel platforms? - correct answer...OSHA 1926.1431 
 
According to ASME B30.3, the prohibited zone for power lines that are 60 kv is: - correct answer...15 ft (ASME 3-3.4.3-1) 
 
Accord...
Preview 2 out of 11 pages
Add to cartTower Crane Sample Questions With Complete Solutions(100% Pass!!!!) 
 
Which OSHA regulation governs suspended personnel platforms? - correct answer...OSHA 1926.1431 
 
According to ASME B30.3, the prohibited zone for power lines that are 60 kv is: - correct answer...15 ft (ASME 3-3.4.3-1) 
 
Accord...
NCCCO MOBILE CRANE Questions With 100%Verified Solutions A+GRADED 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - correct ...
Preview 2 out of 12 pages
Add to cartNCCCO MOBILE CRANE Questions With 100%Verified Solutions A+GRADED 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - correct ...
NCCCO tower crane Questions With Complete Solutions(Guaranteed Success) 
 
Splices in rall tracks shall have - correct answer...Smooth Joints 
 
Hydraulic systems should have their proper fluid level checked - correct answer...Daily 
 
If power fails during operations, the following shouldn't apply...
Preview 2 out of 12 pages
Add to cartNCCCO tower crane Questions With Complete Solutions(Guaranteed Success) 
 
Splices in rall tracks shall have - correct answer...Smooth Joints 
 
Hydraulic systems should have their proper fluid level checked - correct answer...Daily 
 
If power fails during operations, the following shouldn't apply...
Crane Course Questions With Correct Answers Download To Pass Rated A+ 
 
According to OSHA, when traveling a crane at a jobsite with no load under or near power lines, a spotter is required if any part of the crane will get closer than? - correct answer...20 feet 
 
Within what percentage of level d...
Preview 3 out of 22 pages
Add to cartCrane Course Questions With Correct Answers Download To Pass Rated A+ 
 
According to OSHA, when traveling a crane at a jobsite with no load under or near power lines, a spotter is required if any part of the crane will get closer than? - correct answer...20 feet 
 
Within what percentage of level d...
NCCCO CORE Questtions And Answers 100%Solved Already Passed Rated A+ 
 
What is prohibited by OSHA 1926 Subpart cc regarding wire rope on a crane? - correct answer...Splicing 
 
What should be of major concern when considering surfaces for crane set up locations? - correct answer...Voids, tanks, loo...
Preview 2 out of 6 pages
Add to cartNCCCO CORE Questtions And Answers 100%Solved Already Passed Rated A+ 
 
What is prohibited by OSHA 1926 Subpart cc regarding wire rope on a crane? - correct answer...Splicing 
 
What should be of major concern when considering surfaces for crane set up locations? - correct answer...Voids, tanks, loo...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller agradesolutions. Stuvia facilitates payment to the seller.
No, you only buy these notes for $15.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
75323 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now