100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Florida Fire Inspector Questions And Correct Answers $21.99   Add to cart

Exam (elaborations)

Florida Fire Inspector Questions And Correct Answers

 0 view  0 purchase
  • Course
  • FIRE INSTRUCTOR
  • Institution
  • FIRE INSTRUCTOR

Florida Fire Inspector Questions And Correct Answers

Preview 4 out of 39  pages

  • November 26, 2024
  • 39
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • FIRE INSTRUCTOR
  • FIRE INSTRUCTOR
avatar-seller
LeCrae
Florida Fire Inspector Questions And Correct Answers

Traditional fire and building codes are called? Right Ans - descriptive codes

Contour line that are close together on a plan indicate _______? Right Ans - a
steep slope

At what height can water be effectively pumped from the ground level with
adequate pressure? Right Ans - 300 ft

A set of architectural drawings must contain a __________ to be considered a
valid set of plans. Right Ans - architects signature

A _______ is a collection or body of rules pertaining to one subject area such as
buildings, fires, and motor vehicles. Right Ans - code

Fire codes typically address membrane structures with a life of how many
days? Right Ans - >180 days

Fire rated walls are examples of _____ fire protection features. Right Ans -
passive

What is an exploded Pictorial Drawing? Right Ans - used to clarify
assembly

One unavoidable problem with standpipe systems is the variation of ____ with
building height. Right Ans - pressure

Where are the notes placed for a welding symbol? Right Ans - in the
welding schedule

Buildings constructed without final occupancy in mind are called? Right
Ans - spec buildings

A ________ plans shows the overall project layout including features such as
building areas, location, setbacks, etc. Right Ans - plot

,What term is used to define the final set of plans or drawings that are saved as
a permanent record? Right Ans - as-built plans

Contemporary Sprinkler systems are designed using ____________ calculations.
Right Ans - hydraulic

What type of plan would a HVAC system be shown? Right Ans - mechanical

What is the purpose of a PRV? Right Ans - Device designed to limit the
standpipe pressure for 2 1/2 inch outlets when the pressure exceeds 175 PSI

Wiring is sometime referred to as a? Right Ans - run

It is common for codes to require a __________ fire-resistive rating for corridor
walls in health care facilities. Right Ans - 1 hour

Any load that is applied at one point or over a small area such as a safe or
heavy piece of equipment is considered a Right Ans - concentrated load

True or Flase, Fire and emergency service plans examiner may not be
involved in the review of structural plans. Right Ans - true

What type of occupancy is considered those in which the quantity or
combustibility of the contents is low and heat-release rates expected are also
low? Right Ans - light hazard

Any effect that a structure must be designed to prevent is best described as a
________? Right Ans - load

_________ plans show where plumbing systems and heating, ventilation and air
conditioning systems. Right Ans - mechanical

The purpose of the ___________ beneath the foundation is to distribute the
buildings weight? Right Ans - footing

What type of force is produced in a structural member when it is twisted,
creating shear stresses in the material? Right Ans - torsional

,What type of load would the impact of wind against a buildings wall is known
as? Right Ans - direct pressure load

An alarm system where each part of the system has its own unique address
and talks to the main control panel is known as? Right Ans - addressable

What is the maximum travel distance from any point in a structure to an
extinguisher location? Right Ans - 75ft

What type of drawing provides the most realistic view of how equipment
looks as well as how it is connected? Right Ans - pictorial/rendering

Fire alarms are required to have emergency power systems that may consist
of storage batteries or a combination of an emergency generator and storage
batteries. When an emergency generator is used, storage batteries capable of
supplying the fire alarm system for? Right Ans - 5 min

_____ is a term generally applied to vertical supply pipes used to supply water
to the upper floors. Right Ans - risers

Class 1 standpipe connections must be located in what part of the building?
Right Ans - stairwells

What is the term used to describe equalizing static electrical charge between
an object and the earth? Right Ans - grounding

An _____________ indicates where an alarm or other condition has originated on
the fire alarm system. Right Ans - annunciator panel

What class of standpipe is designed for use by either fire department
personnel or building occupants? Right Ans - class 2

NFPA 14 requires a minimum residual pressure of ________ PSI at the most
remote 2 1/2 " hose valve for Class I and Class III standpipes. Right Ans -
100psi

What term is used to describe equalizing static electrical charges between two
object such as a drum and container? Right Ans - bonding

, Modern elevators that rise more than __________ feet are required to be
equipped with a key operated manual recall or fireman's service systems.
Right Ans - 25ft

PRV devices typically limit the system pressure to a maximum of ________ to
prevent damage to the system. Right Ans - 175psi

In high-rise structures, what is the minimum fire protection rating/separation
for an indoor stationary fire-pump? Right Ans - 2 hours or 50ft from the
building

Gauges not accurate to within ____ of the full scale shall be recalibrated or
replaced. Right Ans - 3%

A method to indicate the elevation of carious building features above an
established reference point is normally called a ______? Right Ans - datum

The most fundamental reason for requiring construction permits is? Right
Ans - protect community health & safety

___________ on water supplies to fire protection systems is required to prevent
potential contamination of domestic water by cross-connection to a non-
domestic source. Right Ans - backflow prevention

An easement is the right or privilege of one party to use the property of
another for a specific and limited purpose. One of the most common easement
uses is the? Right Ans - public utility easement

What term is involved in the permitting process stage of construction or
remodeling of a building? Right Ans - planning & zoning review

Outlet ports on a hydrant must be at least ______ above grade? Right Ans -
1ft 6in above grade (18 inches)

___________are a form of graphic shorthand used to represent both object and
materials. Right Ans - symbols

A section taken parallel to the shorter dimension of a building is known as a
__________ section. Right Ans - transverse

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller LeCrae. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $21.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67163 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$21.99
  • (0)
  Add to cart