100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
Previously searched by you
ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST GRADED A+ When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middl$28.49
Add to cart
ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST GRADED A+ When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middl
3 views 0 purchase
Course
ACI CONCRETE FIELD TESTING
Institution
ACI CONCRETE FIELD TESTING
ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY
GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST GRADED A+
When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch -
ACI CONCRETE FI...
ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY
GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST
GRADED A+
When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced
intervals during discharge of the middle portion of the batch - ANSWER-2
The composite sample for a paving mixer must represent a minimum of _____ different portions of the
batch of concrete taken from the pile after discharge. - ANSWER-5
When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____
regularly spaced intervals during discharge of the middle portion of this batch. - ANSWER-2
Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the
mixer at the job site. True or False? - ANSWER-False
The composite samples from a truck mixer must be obtained from the _____ portion of the batch. -
ANSWER-Middle
When the concrete contains aggregate larger than that permitted for a particular test method, the
sample of concrete must be _____ _____ before making the test. - ANSWER-Wet sieved
The slump test is applicable to plastic concrete with a maximum size aggregate of _____. -
ANSWER-1.5
in. [37.5 mm]
When the concrete contains aggregate larger than allowed for the slump test, the large aggregate must
be _____. - ANSWER-Removed by wet sieving the sample over 1.5 in. [37.5 mm] sieve
,The mold for making the slump test is in the shape of _____. - ANSWER-The frustum of a cone
The height of the slump mold is _____. - ANSWER-12 in. [300 mm]
The interior surface of the slump mold is allowed to have minor irregularities. True or False? -
ANSWERFalse
For use in the slump test, the end or both ends of the tamping rod must be _____. - ANSWER-
Rounded to a hemispherical tip
The sample of concrete for use in making the slump test must be obained in accordance with ASTM
Standard _____. - ANSWER-C172, Standard Practice for Sampling Freshly Mixed Concrete
The slump mold should be in a dry condition before beginning the test. True or False? - ANSWER-
False
The surface on which the slump mold will be placed must be _____. - ANSWER-Flat, level, moist,
nonabsorbent, and free of vibration
The slump mold is filled in _____ layers. - ANSWER-3
Each layer should fill approximately _____ the volume of the mold. - ANSWER-One-third
The approximate concrete depth (in verticle distance) after placing the first layer is _____, and the
second layer is _____. - ANSWER-2 5/8 in. [70 mm], 6 1/8 in. [160 mm]
, What is the specified number of roddings for each layer? - ANSWER-25
How deep should the tamping rod penetrate into each layer? - ANSWER-Rod each layer throughout
its depth; on the second and final layers, the rod should penetrate into the previous layer approximately
1 in. [25 mm]
When rodding the bottom layer, the tamping rod must be _____ to uniformly distribute the strokes. -
ANSWER-Slightly inclined
What must be done if the concrete drops below the top of the slump mold while the top layer is being
rodded? - ANSWER-Add additional concrete to keep an excess of concrete above the top of the
mold at all times
Prior to lifting the mold, concrete must be removed from _____. - ANSWER-The area surrounding
the base of the mold
After the final rodding, the sides of the slump mold should should be tapped lightly with the tamping
rod. True or False? - ANSWER-False
When raising the slump mold, it should not be rotated or twisted, True or False? - ANSWER-True
How much time is allowed for lifting the slump mold? - ANSWER-5 +- 2 seconds
The measurement for slump is made from the top of the mold to what point of the concrete specimen?
- ANSWER-The displaced original center of the top surface of the specimen
The slump of the concrete is measured and reported to the nearest _____. - ANSWER-1/4 in. [5
mm]
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Settings. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $28.49. You're not tied to anything after your purchase.