Estimates - correct answer Approximation, projection or prediction of a quantity of work
Detailed estimate of Construction Cost - correct answer forecast of construction cost prepared based on a detailed analysis of materials and labor for all items of work, as contrasted with an estim...
Estimates - correct answer Approximation, projection or prediction of a quantity of work
Detailed estimate of Construction Cost - correct answer forecast of construction cost prepared based
on a detailed analysis of materials and labor for all items of work, as contrasted with an estimate based
on current area, volume or similar unit costs
Bill of Materials - correct answer Used to describe the materials, sub-components needed to
manufacture a finished product
Quantity survey - correct answer term describing the detailed calculation of all components necessary
to construct a building generated by quantity of materials, labor and other parameters; a detailed
analysis and listing of all items of materials and equipment necessary to construct and complete a
project
User-unit Method - correct answer estimating method involving the determination of user or
occupants to quantify space and to establish cost (e.g. number of students, patient beds, inmates, etc.)
Area Method - correct answer estimating method involving costing and quantification using area and
multiplier/factor; commonly used to provide a rough estimate of project cost by multiplying area by cost
per unit area
Volume Method - correct answer estimating method involving a three-dimensional aspect of the
project; an extension of the area method but involves the height of the building project as height affects
cost of the project; also used when estimating small to medium project cost since it involves a standard
height and deviation may be considered minimal
Parametric Method - correct answer estimating method involving the identification of several major
factors in estimating such as architectural, structural, electrical, etc. components of the project, each
with a corresponding project cost
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Rechga. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.99. You're not tied to anything after your purchase.