When core sampling, where should nuclear density gauge test be taken? - ANSWER-Test should be taken prior to coring in same location
What is a "Lot" compris...
NICET LEVEL 2: ASPHALT WITH
COMPLETE SOLUTIONS
How many samples are required to create a composite sample? - ANSWER-3 samples
When core sampling, where should nuclear density gauge test be taken? - ANSWER-
Test should be taken prior to coring in same location
What is a "Lot" comprised of? - ANSWER-A lot is split up in 5 different samples called
"Sublots"
When sampling from a paver auger, where should the sample be taken? - ANSWER-
Sample should be taken from the end of the auger
When sampling from roadway, where should sample be taken? - ANSWER-Immediately
behind paver and Infront of breakdown roller
When sampling from roadway, how far away should rollers stay away? - ANSWER-
Rollers should be 10' away from sampling area
When sampling from the roadway, what're the type of sampling methods? - ANSWER-
Plate with cookie cutter, Plate method, non-plate method
What is the requirement when using plate method for sampling from roadway? -
ANSWER-1. Plate is placed 10' Infront of paver and at least 2' on the inside edge of the
mat
2. 3 samples must be acquired
What are the requirements when sampling from a paver? - ANSWER-1. Trim 8-12"
before taking sample
2. Remove 6-10" of material in center of hopper
3. Take sample directly into vertical face
What are the requirements for sampling from stockpiles? - ANSWER-1. Remove 4" of
outermost layer
2. Obtain sample as close as possible to the intersection of horizontal and vertical face.
How many sections should be split from a sample container when " sample splitting"? -
ANSWER-4
What are the requirements for sampling from a loaded truck? - ANSWER-1. Truck
should be split into 4 different quadrants
2. Remove 4" of outermost layer
, 3. 3 increments placed on sample container
What is open-graded Asphalt? - ANSWER-Top course permeable layer that supports
drainage, tire dampening and road spray
What is dense-graded Asphalt? - ANSWER-Base or binder course that have larger
nominal size aggregates. Low water impermeability, strength and improves freeze/thaw
cycles
Existing surface preparation inspection: Structurally Sound - ANSWER-Cracks and
other structural defects must be prepared to minimize reflective cracking. surface must
be non-compressible and capable of bearing traffic loads
Existing surface preparation: Well Drained - ANSWER-1. Surface must not be
undermined by water intrusion.
2. Water should not collect around roadbed
3. Roadbed should promote positive drainage
Existing Surface Preparation: Properly Graded - ANSWER-Elevation prepared to proper
slope and crown
When is paving on subgrade not recommended? - ANSWER-When optimum moisture
content is over 4% or area is frozen
What is the required compaction rating? - ANSWER-95% compaction
What can be done is soil conditions are to dry when compacting? - ANSWER-Water can
be applied, but must be closely monitored
What equipment is recommended for sandy/granular soil conditions? - ANSWER-
Vibratory rollers/ compactors
What equipment is recommended for silt/clay soil conditions? - ANSWER-Tamping Foot
Rollers
What is another method to test soil compaction besides nuclear density gauge? -
ANSWER-Proof Rolling: Method of utilizing a loaded truck and measuring indentations.
Soils that exhibit proper compaction should reveal 1/8" indentation. Poorly compacted
areas reveal more than a 1/8"
What equipment should be utilized around drainage structures, tight spaces or turns to
achieve compaction? - ANSWER-Hand tamps or plate tampers
What type of amplitude compaction is recommended for crushed stone bases? -
ANSWER-High to low frequencies
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller NursingTutor1. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $11.99. You're not tied to anything after your purchase.