Maine Fuel Board "Rules" Study Guide Questions And Answers Guaranteed Success. ENT Flexible Conduit - correct answer. Electrical Non-metallic Tubing GPH - correct answer. gallons per hour Listed - correct answer. meets standards by a nationally-recognized testin...

[Show more]

Preview 2 out of 5  pages

  • November 4, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Maine Fuel Board "Rules"
  • Maine Fuel Board "Rules"
avatar-seller
techgrades
Maine Fuel Board "Rules" Study Guide
Questions And Answers Guaranteed
Success.



ENT Flexible Conduit - correct answer. Electrical Non-metallic Tubing

GPH - correct answer. gallons per hour

Listed - correct answer. meets standards by a nationally-recognized testing agency

Submitted in writing with detailed facts, Rulings in writing, Assent of 4 members
required - correct answer. Advisory Rulings

Notify owner in writing of any code violations, dispensing station has valid license, data
plate needs to be in compliance, no delivery if dangerous conditions exist - correct
answer. Responsibilities of Licensure

Equal Responsibility of Supervision - correct answer. When scope of work is
subcontracted

Direct supervision required at all times, Minimum age is 18 years old - correct answer.
Helper

Every 2 years - correct answer. Renewal of License

more than 90 days must reapply as new applicant - correct answer. Renewal of
Helper License

Satisfy all requirements and Board's rule - correct answer. Renewal more than 2
years

Chimney's - correct answer. must be listed and approved by UL or National Testing
Laboratory

, Chimney Disclosure - correct answer. Filed prior to starting work, constructed to
NFPA 211

Existing Chimney's - correct answer. Clearances not required when replacing oil or
gas-fired appliances

Permits - Storage Tanks - correct answer. over 2000 gallons individually or 4000
gallons aggregate must be approved by Board prior to installation

Permits - Roof Top Unit - correct answer. "propane containers" submitted to the
Board for approval and permitting. Same is for "compressed natural gas".

Application Procedure - correct answer. form provided board, detailed plans, cross-
sectional view, front/side elevations, plot plan. Permit must be obtained prior to
installation

Board Inspection - correct answer. required prior to operation

Workmanship - correct answer. neat and professional manner, competent

Repair or Replacement - correct answer. installed in accordance with specific
purposes and listings

Combustion Efficiency Test Required - correct answer. Results to be posted, annual
basis, unit brought into compliance with NFPA 54 before operation, technician must
inspect operation before leaving the premises.

Low Water Cut-Off Required - correct answer. must be designed and approved for
the medium used (steam/water); no valves or other obstructive devices shall be
installed between the boiler and safety controls.

Heat Loss Requirement - correct answer. must be done for new installations and
replacements. Results to be made available to the inspector.

Conversion Burner - correct answer. 400,00 Btu/hr or less: must be listed, written
approval from manufacturer that gas can be used as fuel source, burner meets ANSI, if
a positive chamber pressure manufacturer must provide installation instructions, install
conforms to NFPA 54

Conversion Burner - correct answer. 400, ,000 Btu/hr or more: must be UL listed,
written approval from manufacturer, burner meets appliance which is intended for
usage, burner has been tested by independent lab, burner has been tested by
manufacturer for use in appliance, installation conforms to NFPA 54 and NFPA 211(for
installations 1,000,000 or greater, must conform to CSD-1, NFPA 85)

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller techgrades. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80461 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart