A type of allowance for the owner to pay for certain items of work
Lump-Sum
None of the above
Definition 2 of 66
Bid drawings usually provide very little detail about the specific requirements of site work
operations. The drawings will give details of the new construction required for the project but
information about the size and shape of excavations and details of current site conditions are
seldom provided
What is meant by a team approach to estimating, and how can it help an estimator in his or
her work?
Why is the process of measuring excavation different from measuring the work of other
trades?
Why does the estimating process need to be scheduled?
What is the purpose of Cost Estimating?
,Term 3 of 66
What division in RS Means is Concrete?
1
2
3
4
5
None of the above
Term 4 of 66
What is the purpose of Cost Estimating?
1.Programming phase
2.Schematic design
3.Design development
4.Construction documents
• Design-Bid-Build
• Construction Management
• Design-Build
• Determine the Feasibility of Projects
• Calculate an approximate Price of a Project
• Prepare a Value Analysis
• Set the Sales Prices
• Calculate a Bid Price
• Determine Project Budgets for Cost Control
a feasible project can be defined as one where the anticipated value of all benefits exceeds
the estimated total cost of putting the project in place
,Term 5 of 66
Which one of the following defines cost estimating?
a) An evaluation of a future cost
b) An accurate forecast of future cost
c) An attempt to determine the likely cost of some building work before the work is
done
d) A process of analyzing a specific scope of work and predicting the cost of
performing the work.
e) b and c above
f) All of the above
Term 6 of 66
What is meant by a team approach to estimating, and how can it help an estimator in his or her
work?
• An evaluation of a future cost
• An attempt to determine the likely cost of some building work before the work is
done
The process of analyzing a specific scope of work
and predicting the cost of performing the work.
The team approach involves the input of managers and experienced field personnel in the
preparation of an estimate rather than having estimators work alone on the task
The cost of hand excavation is generally far high than the cost of other excavation methods.
, Term 7 of 66
Reviews are needed for
a. Equipment
b. Units
c. Unit prices & productivity rates
d. Materials
e. c and d above
f. None of the above
Term 8 of 66
What are the 5 type of takeoffs in Timberline
he value of the development and the cost of the development
a) Length, Width and Depth or Height
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller stuuviaa. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $7.99. You're not tied to anything after your purchase.