What is the rule of thumb for the minimum compacted layer thickness to prevent full width tearing of the mix as determined by the maximum aggregate size? - ANSWER The minimum course thickness should be at least 3 times the largest aggregate size What is the maximum depth you can excavate lower t...

[Show more]

Preview 2 out of 5  pages

  • November 2, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Contractor's License
  • Contractor's License
avatar-seller
Lecchris
General Engineering Contractor's License – 1
CORRECT 100%

What is the rule of thumb for the minimum compacted layer thickness to prevent full width tearing of
the mix as determined by the maximum aggregate size? - ANSWER The minimum course thickness
should be at least 3 times the largest aggregate size



What is the maximum depth you can excavate lower than the trench box? - ANSWER 2 feet



When installing a Class 1 Division 1 pipe and it will be running at 75% maximum pressure, how much
beyond the manufactures recommended pressure must it be tested? - ANSWER 1.25 times



In laying out an excavation site from a benchmark to a reference point and to an excavation location, the
distance from the benchmark are measured: - ANSWER Horizontally to both the reference and the
excavation location



What is tie wire used for when installing conductors? - ANSWER To fasten conductor to insulator



When doing a preliminary pressure test on a water line for major leaks, what % of the designed pressure
should you test? - ANSWER 100%



An outdoor sign is accessible to vehicles but it is not protected from physical damage. The bottom of this
sign must be above the road at least ____ feet. - ANSWER 16



What is required when an employee must lean out over an opening to receive materials? - ANSWER
Personal fall arrest system



If concrete has gone through a season and its starting to show crazing and scaling, what is this caused
by? - ANSWER Overworked

, What is the primary benefit of obtaining good pre-compaction density on the mix with the paver screed?
- ANSWER Reduced differential compaction on low spots and rutted areas



What is the best way to cut any size of ductile iron pipe outside of a trench? - ANSWER Abrasive cutoff
saw




Using the ASTM metric designation for steel reinforcing bars adopted in 1996, a #25 bar is the standard
replacement of what diameter in inches? - ANSWER 1 inch



What is the motor grader primarily used for? - ANSWER To trim and fill the cut site and process material



What type of material is pipe made from which carries ethanol? - ANSWER Stainless steel



What should never be used when giving directions to a job site? - ANSWER Left and right



Under which condition would you use concrete with low heat hydration? - ANSWER Structures with
considerable mass



The maximum size valve recommended to be installed on ductile iron pipe without the support is: -
ANSWER 10 inch



What is the minimum height required from the bottom of a warning sign to the road on a freeway? -
ANSWER 7 feet from the asphalt



What type of material is the appropriate choice for bedding concrete pipe or slab? - ANSWER Class A
bedding



What is the minimum wall thickness of ductile iron pipe allowed before restrained joints are required? -
ANSWER .25

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Lecchris. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82215 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart