100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
Previously searched by you
FDOT Asphalt Paving Level 2 | latest |COMPREHENSIVE MOST TESTED (frequently tested) QUESTIONS AND VERIFIED ANSWERS | GET IT 100% ACCURATE!!$14.99
Add to cart
11/2/24, 8:32 PM FDOT Asphalt Paving Level 2 |2024-2025 latest |COMPREHENSIVE MOST TESTED (frequently tested) QUESTIONS AND V…
FDOT Asphalt Paving Level 2 |2024-2025 latest
|COMPREHENSIVE MOST TESTED (frequently
tested) QUESTIONS AND VERIFIED ANSWERS |
GET IT 100% ACCURATE!!
Terms in this set (94)
A quality asphalt mixture is determined by the
What makes up a quality
constructability, if it conforms to Specifications, and
asphalt mixture?
if it satisfies functional requirements.
CQC contractor quality control
Superpave Asphalt mix design system since 1998
QCP Quality control plan
QCM Quality control Manual
QC Quality Control (Contracting Testing and Inspection)
VT Verification Testing (FDOT or CEI Verification)
CEI Construction Engineering and Inspection
RT Resolution Testing (FDOT)
IV Independent Verification Testing
IA Independent Assurance Testing
The decision-making Needs to be given to the level closet to the work as
authority on a job needs specified in the specifications. It ensure a quick
to be given to who? handle on situations and issues.
The governing order of Special Provisions
project documents from
high (1) to low (7) starts
with the highest being
, 11/2/24, 8:32 PM FDOT Asphalt Paving Level 2 |2024-2025 latest |COMPREHENSIVE MOST TESTED (frequently tested) QUESTIONS AND V…
The governing order of Technical Special Provisions
project documents from
high to low (2)
The governing order of Plans
project documents from
high to low (3)
The governing order of Road design, structures, and traffic operations
project documents from standards
high to low (4)
The governing order of Developmental Specifications
project documents from
high to low (5)
The governing order of Supplemental Specifications
project documents from
high to low (6)
The governing order of Standard Specifications
project documents from
high to low (7)
Key Personnel (Paving superintendent)
Contractor Input
What are the key Agency Input
components in a pre- QC Plan Review
paving conferences? Discuss more specific key topics or issues
Meeting Minutes
Action items (what to do in situations, who to call)
Agency Input (FDOT)
Contractor Input (Including the Prime)
What are the key Project Personnel (Upper - Middle management)
components in a pre- Testing
construction Safety
conferences? Utilities
Cities or Municipalities (HOA, school boards)
Suppliers
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller MEGAMINDS. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $14.99. You're not tied to anything after your purchase.