100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PJM GO Exam Questions and Answers 100% Solved | Guaranteed Success $12.49   Add to cart

Exam (elaborations)

PJM GO Exam Questions and Answers 100% Solved | Guaranteed Success

 4 views  0 purchase
  • Course
  • Pjm
  • Institution
  • Pjm

PJM GO Exam Questions and Answers 100% Solved | Guaranteed Success What is operating reserve? - is generation or load that can be deployed or removed within 30 minutes of the request What is synchronous reserve? - is generation or load that can be deployed or removed removed within 10 minutes ...

[Show more]

Preview 3 out of 23  pages

  • November 2, 2024
  • 23
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Pjm
  • Pjm
avatar-seller
NinjaNerd
©NINJANERD 2024/2025. YEAR PUBLISHED 2024.
PJM GO Exam Questions and Answers

100% Solved | Guaranteed Success


What is operating reserve? - ✔✔is generation or load that can be deployed

or removed within 30 minutes of the request

What is synchronous reserve? - ✔✔is generation or load that can be

deployed or removed removed within 10 minutes of the request, and must

be electrically synchronized

What are non-synchronous (quick start) reserves? - ✔✔is generation or

load that can be deployed or removed within 10 minutes of the request, and

is not electrically synchronized

A unit is considered resource limited if it is not capable for running at rated

capacity for how long? - ✔✔more than 72 hours

If a weather alert is issued, what is the minimum run time for a steam unit

before it is placed into max emergency? - ✔✔less than 32 hours at max

capacity

,©NINJANERD 2024/2025. YEAR PUBLISHED 2024.
If a weather alert is issued, what is the minimum run time for an oil,

kerosene or diesel unit before it is placed into max emergency? - ✔✔less

than 16 hours at max capacity

If a weather alert is issued, what is the minimum run time for a gas fired CT

unit before it is placed into max emergency? - ✔✔less than 8 hours at max

capacity

What is required for a unit to provide regulation? - ✔✔Must be able to

receive an AGC signal

Must be able to respond within 5 minutes of signal

Sum of energy and regulation ramp rate cannot exceed eco ramp rate

What is the max time limit that a maintenance outage can run for during

PJM peak period maintenance season? - ✔✔9 days

What does generator droop setting allow? - ✔✔Lowering the generator

droop allows for greater frequency control

As the TO, what is the lowest voltage level that PJM is responsible for? -

✔✔PJM is responsible for 100kV and above as well as lower facilities if

requested by unit owner

When a unit's data is down, how often must the dispatcher updated the

failed data? - ✔✔Every 30 minutes

, ©NINJANERD 2024/2025. YEAR PUBLISHED 2024.
What does positive ace mean? - ✔✔it means there is more power flowing

out of an area than scheduled, which shows there is more supply than

demand and generation should be brought down

What does negative ace mean? - ✔✔it means there is more power flowing

into an area than scheduled, which shows there is more demand than

supply and generation should be brought up

How soon must an outage be entered into eDART after it has started? -

✔✔Immediately but cannot be submitted earlier than 72 hours in advance

How much notice should PJM be given when a self scheduled unit wants to

move its basepoint? - ✔✔20 minutes notice

What system of bias control does PJM use? - ✔✔During normal operations

PJM uses tie line bias control

What is the regulation signal that PJM and the member sends to each

other? - ✔✔PJM sends RegA via AGC and the member sends CReg back

What areas can a low system voltage action be declared for? - ✔✔Can be

issued for the entire PJM RTO, specific control zones or subsets of control

zones

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller NinjaNerd. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80796 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart