At what stage of the construction process would the builder cut out the sole plate in a door opening? - ANSWER after the wall has been erected and braced When wide square edge boards are being used for board and batten siding, how should the batten strips be nailed ? - ANSWER to only one siding ...

[Show more]

Preview 3 out of 26  pages

  • November 1, 2024
  • 26
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CONTRACTOR LICENSE
  • CONTRACTOR LICENSE
avatar-seller
Lecchris
General Contractor License - KB2 Study Prep -
Full Set CORRECT 100%

At what stage of the construction process would the builder cut out the sole plate in a door opening? -
ANSWER after the wall has been erected and braced



When wide square edge boards are being used for board and batten siding, how should the batten strips
be nailed ? - ANSWER to only one siding board



According to the code, the minimum allowable height of a guardrail at a restaurant deck (or any
commercial building) is _____ inches above the finished floor height of the deck or balcony. - ANSWER
42



If the blueprint does not disclose an exterior doors rough opening, then the standard practice would be
to frame the width _____ oversize. - ANSWER 2 inches



How are resilient channels used in drywall application? - ANSWER to decrease sound transmission in
walls and partitions



What screws are used to attach steel studs to the top and bottom steel track? - ANSWER pan head, type
S. It attaches stud to runner up to 14-ga



In single family dwelling sleeping rooms, the minimum net clear opening width of windows, which are
required for emergency egress or rescue, is _____ inches. - ANSWER 20



According to the code what is the minimum slope on which asphalt strip shingles may be installed? -
ANSWER 2:12



According to Code the MAXIMUM diameter of a hole that may be bored in a 2 by 10 joist is _____
inches. - ANSWER 3

, According to the Code, notches allowed in the top or bottom of joists shall not exceed what fraction of
the depth of the joist? - ANSWER 1/6



While trenching and excavating, OSHA requires at least _____ feet of clear unobstructed distance from
the trenches edge to the toe or edge of the dirt or spoils pile. - ANSWER 2 feet



What is the actual size of a 2 x 4 surfaced dry piece of framing lumber? - ANSWER 1-1/2 by 3-1/2



What is the minimum height of a guardrail on a residential deck ? - ANSWER 36 inches



A minimum tread run for stairways (other than spiral stairs) in single family dwellings having an occupant
load of less than 10 is _____ inches. - ANSWER 10



Dampening of the subgrade or the wood concrete forms prior to the placement of concrete will: -
ANSWER prevent rapid extraction of the mixing water from the concrete



Notches on the ends of joists shall not exceed _____ percent of the joist depth. - ANSWER 25 (1/4th)



According to code, asphalt shingles installed on roof with a slope of 4:12 or greater require an
underlayment of: - ANSWER one layer #15 non-perforated felt



How much clearance is the wood framing required to have where a masonry chimney passes through
the roof opening? - ANSWER 2 inches



Asphalt shingles installed in warmer climates with a slope of 4 in 12 or more should have a minimum
underlayment of: - ANSWER 1 layer of # 15



When should concrete curing procedures start? - ANSWER As soon as possible after finishing.



A kind of molding installed on the vertical wall used to accept aluminum soffit panels is: - ANSWER "F"
Channel

, A concrete slab should be bull floated as soon as possible after: - ANSWER screeding



According to OSHA, powered concrete trowels that are manually guided shall be equipped with: -
ANSWER a hand release shut off switch



For open valleys, valley lining of two plies of mineral-surfaced roll roofing complying with ASTM D 3909
or ASTM D 6380 shall be permitted. The bottom layer shall be _____ and the top layer a minimum of
_____ wide. - ANSWER 18 inches, 36 inches



What is the minimum footing width on solid rock? - ANSWER 12 inches



What is the minimum width of a load bearing CMU wall with filled cells? - ANSWER 8 inches



What is the minimum gauge of sheet metal veneer wall ties? - ANSWER 22 gauge



What do you call a metal used to keep water from seeping into a house? - ANSWER flashing



What is the load bearing value(PSF) of sandy gravel? - ANSWER 3,000 psf



What is the inner piece around a door frame called? - ANSWER Jamb



What does the "R" after the contractors license number represent? - ANSWER The licensee's scope of
work is resticted



According to OSHA, what type of guard (or safety) is required for a power saw? - ANSWER Point of
operation



What is the maximum slope of a footing trench before stepping is required? - ANSWER 10%



Concrete and masonry foundation walls shall be waterproofed _____. - ANSWER All of the above

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Lecchris. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82215 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.99
  • (0)
  Add to cart