100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CPSWQ Section 2: US Rules and Regulations With Questions And 100% SURE ANSWERS $10.99   Add to cart

Exam (elaborations)

CPSWQ Section 2: US Rules and Regulations With Questions And 100% SURE ANSWERS

 4 views  0 purchase
  • Course
  • CPSWQ
  • Institution
  • CPSWQ

CPSWQ Section 2: US Rules and Regulations With Questions And 100% SURE ANSWERS

Preview 2 out of 6  pages

  • October 31, 2024
  • 6
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CPSWQ
  • CPSWQ
avatar-seller
Queenstin
JACKLINE


CPSWQ Section 2: US Rules and Regulations With Questions And 100% SURE
ANSWERS



Nutrients, pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons, and
What are examples of priority pollutants?
oxygen-adsorbing substances.

When was the Federal Water Pollution Control 1948 (prior to CWA).
Act established?




When was the Clean Water Act (CWA) 1972 - established NPDES permit.
established?

When was the CWA amended? 1987.

Industrial process wastewater and municipal sewage (did not focus on stormwater discharges
What did 1972 amendments focus on?
at this point).

Section 401 of CWA requires that any applicant for a federal permit to conduct any activity that
What is the "Section 401 - Water Quality
may result in discharge of pollutant must obtain certification of those activities from state in
Certification" for a project?
which discharge originates.

What does POTW stand for? Publicly Owned Treatment Works.




What does NURP stand for? National Urban Runoff Program.
CPSWQ Section 2: US Rules and Regulations
1/6

, 10/31/24, 2:06 PM
Stormwater contained same pollutants regulated from process outfalls and POTWs. Studies
What did NURP study discover? occurred from 1978 - 1983. EPA began issuing NPDES permits for stormwater discharges
during mid-1980s.

Section 402(p) focused on five stormwater categories known as "Phase 1" facilities. Further
What did 1987 CWA amendments establish?
permit requirements could not be established until October 1, 1992.

-Facilities already covered by NPDES
-Industrial activity
What is criteria for Phase 1 NPDES facilities? -Large MS4s (>250k pop)
-Medium (100k > pop > 250k)
-Facilities determined by EPA administrator to contribute to water quality violations

November 1990 - describes the types of facilities subject to the NPDES stormwater permitting
What is the "stormwater application rule"?
program and how they must obtain permits.




What is the "stormwater implementation rule"? April 1992 - establishes minimum requires for NPDES permit terms and conditions.

-"Light" industrial facilities
What are Phase II discharges? -Small construction sites (<5 acres)
-Small municipalities (<100l pop)

Which permits were issued in fall 1992? EPA General Industrial Permit and EPA General Construction Permit

What did the "Interim Permitting Approach for Used BMPs in-lieu of numeric limitations to achieve water quality standards.
Water Quality Based Effluent Limitations"
establish?

"Dredge/Fill Permitting" - regulate discharge of dredged or fill material into waters/wetlands.
What does Section 404 of CWA cover?
Administered by Secretary of the Army through USACE.

What are Coastal Zone Act Reauthorization Section 6217 requires Coastal Nonpoint Pollution Control Program Management Plan for every
Amendments (CZARA)? state under coastal zone jurisdiction to address nonpoint source pollution.

What does EPA "Stormwater" definition not Does not include return flows from irrigated agriculture or agricultural stormwater runoff.
include?

Discharges that do not discharge into waters of the US or discharges through a combined
What discharges are not regulated by NPDES?
sewer system.

When were Phase II discharges incorporated Incorporated in August 1995. Finalized in December 1999.
into NPDES permit? When were Phase II
CPSWQ
regulations finalized? Section 2: US Rules and Regulations

2/6

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Queenstin. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80796 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart